Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Modeling of CBM Recovery in the Amasra Coalfield, Turkey

    By K. Baris

    Methane (CH4) present in coal seams, generally known as Coalbed Methane (CBM), Coal Mine Methane (CMM) or Coal Seam Gas (CSG), is a major energy source, as it is the primary constituent of natural gas

    Aug 1, 2013

  • CIM
    Fractured Bedrock Investigation by Using High-Resolution Borehole Images and the Distributed Temperature Sensing Technique

    By R. Charlier, G. Radioti, J. -P. Radu, S. Delvoie, F. Nguyen

    "In order to investigate the fracturing of the bedrock and its possible heterogeneous distribution in situ, four boreholes equipped with double-U geothermal pipes of 100 m long were installed on the c

    Jan 1, 2015

  • CIM
    Design of an Optimal Lining Material to Prevent Coal Fires at Underground Coal Mines

    By A. H. Onur

    Spontaneous combustion of coal is a significant hazard in underground coal mines. It causes serious problems for miners for many years after the fact. It threatens workers? lives and causes economic l

    Aug 1, 2013

  • CIM
    Wildlife Utilization of Reclamation Habitats within the Highland Valley Copper Operating Area

    By Richard Howie

    Avian Diversity ?? Pre-mining ?? 110 - 125 species would have occurred ?? Dominated by forest species ?? Wetland productivity unknown ?? Post mining ?? 192 documented ?? Forested species in red

    May 1, 2008

  • CIM
    Gold Electroforming And Electrodeposition For Medical Applications

    By Heidi Fauser

    The aim of the project was the development of an electroforming process for the production of medical implants out of gold. To prove the applicability of this technology, tympanostomy tubes were chose

    Oct 1, 2003

  • CIM
    Water management simulation for the Pogo Gold Mine

    By G. Beckstead, L. Gormely, R. Zimmer, K. Hanneman, B. Nethery

    As part of the EIS and permitting activities for the Pogo Mine in Alaska, a risk assessment study for the water management plan was carried out. The basis for the study was a site water volume and con

    Jan 1, 2005

  • CIM
    CMC Addition Methods in Ultramafic Ore Flotation

    By Manqiu Xu, Pete Winn, Steve Wilson

    "In the flotation of ultramafic ores at Thompson mill, Inco Limited, CMC is used as both a floatable rock depressant and electrostatic serpentine slime dispersant. CMC, being a high molecular weight p

    Jan 1, 2000

  • CIM
    Maximize Opportunities in Milling Operations

    By K. Kim

    "All milling operations would like to achieve the best possible recovery in combination with the highest achievable throughput. Unfortunately, many operations have problems with low recovery, low thro

    Jan 1, 2019

  • CIM
    Characterization of Aluminium Alloy Sheets Accumulative Roll-Bonded at Different Temperatures

    By P. Homola, M. Karlík, M. Slámová

    "Aluminum sheets (AA1199, AA8006, and AA5754) were processed by accumulative roll-bonding (ARB) in the temperature range from 20 to 350°C. The microstructure of the sheets was characterized by means o

    Jan 1, 2018

  • CIM
    Trajectory Tracking Control for Offshore Boom Cranes using Higherorder Sliding Modes

    By R. M. T. Raja Ismail

    Shipping and stevedoring industry is going to witness a massive increase in the amount of containers to be handled while land constraints become more critical. Offshore transfer operations hence offer

    Aug 1, 2013

  • CIM
    Working within metallurgical limitations in the successful repair welding of power-plant components

    By D. Mills, W. H. S. Lawson

    "The need to make repairs is seldom a major consideration in the design, fabrication and installation of major components of electrical generation plants. Repair welding, however, is a fact of life in

    Jan 1, 1981

  • CIM
    The Advanced Control Project at Highland Valley Copper

    By Cy Jordan, Ben Burdett, Adrian Dance, Jack Rainey

    "In 1997, EIMCO Minerals installed a knowledge-based control system on one of the five primary grinding lines at Highland Valley Copper. The objective of the system is to maximise throughput without a

    Jan 1, 1998

  • CIM
    Maintenance Engineering & Mine Operators? Conference 2011 Risk Analysis: What Does It Really Mean For Your Project?

    By Jason Mewis

    Do you have it figured out? ? If so, I want to network with you! ? There?s a lot to learn as an industry The more we share the better we?ll all become at dealing with this subject If you don?t have

    Nov 1, 2011

  • CIM
    Toward an infrastructureless guidance system — A proposed guidance system for autonomous underground vehicles

    By E. Hinton, L. Bloomquist

    "This paper describes a guidance system for autonomous underground mining vehicles, which does not require any infrastructure or inertial positioning systems to aid the guidance process.BackgroundINCO

    Jan 1, 2001

  • CIM
    Gas Diffusion Rules Through Coal Particles of Different Sizes

    By Baisheng Nie

    The process of gas diffusion through coal particles and the mathematical physical model under the third kind boundary condition was determined to obtain the rules of gas diffusion through coal particl

    Aug 1, 2013

  • CIM
    Understanding the Effect of Interdependency and Vulnerability on the Performance of Civil Infrastructure

    By A. Atef

    Vulnerability is a measure of the extent to which a community, structure, services or geographic area is likely to be damaged or disrupted by the impact of particular hazard. Current asset management

    Aug 1, 2013

  • CIM
    The Behaviour of As(III) and As(V) During the Precipitation of Alunite at 98°C

    By J. E. Dutrizac, Alba Sunyer

    The factors affecting the precipitation of arsenic-free alunite (KAl3(SO4)2(OH)6) were investigated in a series of laboratory experiments. Although the amount of alunite precipitated increased with in

    Jan 1, 2011

  • CIM
    Dust Collection Methods for Primary and Secondary Crushing (NOVEMBER 21, 1975 )

    By D. Ingram

    "PRIMARY DUST COLLECTOR A. 42,000 CFM James Howden Fan Z-6 Size 3650 Fan Dia 40"" HP 75It was found that the fan was not large enough to remove the air that was displaced by the trucks dumping. So it

    Jan 1, 1976

  • CIM
    Analyzing Building Information Using Graph Theory

    By S. Isaac

    The networks of interdependencies between elements in building projects, referred to as the project topology, are often complex and difficult for project teams to comprehend. It is hypothesized that a

    Aug 1, 2013

  • CIM
    Recycling of Printed Circuit Boards (PCB): Extraction of Metallic and Nonmetallic Fractions by a Combination of Physical and Chemical Processes

    By S. S. Al-Thyabat, A. M. Ghrair

    "Printed circuit board (PCB) is the main part of any electric or electronic device, providing mechanical support and electric connection for the board eclectic components such as capacitors, resistors

    Jan 1, 2016