Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Definition of Drilling-Activity Patterns Based on Production Data Profiles

    By Diego Bellato

    Production data recorded by special foundation rigs during construction activities at the site are commonly used for quality assurance / quality control procedures and, in particular, to prove that th

    Jan 1, 2019

  • DFI
    The Little Lake Harris Bridge Settlement Restoration Project: Lessons Learned

    By Amr Sallam, David Thompson, Moataz Hassan

    "The Little Lake Harris (LLH) Bridge was constructed in 1951 to replace the eastwest County Road 48 Bridge connecting the towns of Howey-in-the-Hills and Astatula in Lake County, Florida, United State

    Jan 1, 2015

  • DFI
    Fresh Concrete Pressure in Cast In-Situ Bored Piles

    By Matthias Pulsfort, Hanna Nissen, Markus Herten

    An insufficient integrity of cast in-situ bored piles can lead to a reduction of the load bearing capacity and may require cost intensive repairs. Reasons for an insufficient pile integrity are linke

    Sep 8, 2021

  • DFI
    Contactless Anchor Measurement with Elastomagnetic Sensors

    By Damir Dedic, Wörle. Patrick

    "Soil properties within a construction project area are analyzed during the planning phase. However, it is only possible to achieve selective soil exploration, even in the case of very extensive inves

    Jan 1, 2017

  • DFI
    Application of the Cement Deep Mixing Method for Shallow Water Areas Using the CDM-Float Technique

    By Takeo Asanuma, Sachihiko Tokunaga, Hirofumi Taguchi, Yasuhiro Ootsuka, Yosuke Tanaka

    The Cement Deep Mixing Method (CDM Method) is a ground improving method that has been used for mainly offshore sites to strengthen the soft ground below the sea bottom by injecting and adequately mixi

    Jan 1, 2015

  • DFI
    Analytical Expression for Plastic Hinge Length in Extended Pile-shafts

    By M. Hesham El Naggar, Mehdi Heidari

    "Equivalent fixed-base cantilever model is a common approach for performance base seismic design of bridge structures supported by extended pile-shaft. In this method, global displacement ductility fa

    Jan 1, 2017

  • DFI
    Engineering Practice Of Ground Improvement ? Introduction

    By H. R. Taber

    The extensive subject area "Engineering Practice of Ground Improvement" will be treated within the limitations of space and the writer on the basis of personal practice and experience?largely in North

    Jan 1, 2010

  • DFI
    Pile Construction And Related Problems ? Synopsis

    By K. Fujita

    In order to deal properly with the fundamental aspects of pile construction, the following problems and their solutions are introduced: For driven piles - stresses, damage, movements of surroundings,

    Jan 1, 2010

  • DFI
    Construction Of Foundations For Zuari, Mandovi Railway Bridges In Goa ? Synopsis

    By N. V. Nayak

    Konkan Railway Project is one of the most ambitious railway construction projects in India, involving construction of a 760.km long, Broad Gauge (1676 mm), single track railway line, connecting Roha i

    Jan 1, 1996

  • DFI
    Sheet Piling Bridge Abutments

    By Robert J. Carle

    This paper reviews a variety of highway structures which have been built using steel sheet piling as the permanent structural elements of bridge piers, abutments and wingwalls. Those structures built

    Jan 1, 1989

  • DFI
    The Role Of Real-Time Instrumentation In Large Infrastructure Projects

    By J. G. La Fonta

    The rapid development of real-time monitoring technology for the construction of large underground structures in urban areas can be attributed to: the zero-risk objective, the need for transparency be

    Jan 1, 2006

  • DFI
    New Technique To Drive Piles By Impact Hammer Inside The Pile - Synopsis

    By Djk Arentsen

    A new technique to drive tubular piles by impact hammer inside the pile has confirmed a dramatic reduction of noise and the opportunity to save steel. Also a reduction in driving time and a higher bea

    Jan 1, 1996

  • DFI
    Ground Freezing In Urban Areas And Under Special Conditions

    By Frank Haehnig

    Ground freezing is a technique which is used more and more in tunnelling under complex ground conditions. This paper will present three case studies which highlight different aspects of the ground

    Jan 1, 2008

  • DFI
    Using Large Pile Driving Hammers For The Foundation Of Bridges And Windparks

    By Bernhard Bruggaier

    Outside the oil and gas industry there is an increasing demand to install big piles for the foundation of ports, bridges, and wind-energy plants. This article introduces the design and techniques in u

    Jan 1, 2002

  • DFI
    Underpinning System Based On Preloaded Micropiling For Construction Of Additional Underground Floors

    By Wolfram Groh

    New underground floors comprising the complete footprint area of the building structure, were constructed under an existing building in sand, located in the Verdun district of Beirut / Lebanon. The wo

    Jan 1, 2002

  • DFI
    7-Foot Diameter Drilled Shafts In Weathered Rock: Design, Load Testing, And Construction

    By Aly M. Mohammad

    The design of large diameter drilled shafts in weathered rock has always presented a challenge to the foundation engineers. Degree of weathering and load transfer mechanism through the rock are essent

    Jan 1, 2003

  • DFI
    Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And Construction

    By David R. Sutfin, Joseph Lodde

    110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method

    Jan 1, 2019

  • DFI
    Sustainability Assessment of Deep Foundations: Case Study

    By Krishna R. Reddy, Jyoti K. Chetri, Girish Kumar

    Geotechnical engineering encompasses a major portion of the civil and infrastructure projects. The large amounts of energy and resources typically used in these projects leads to undesirable emissions

    Jan 1, 2019

  • DFI
    Port Said East Port Project - Deep Diaphragm Walls For The Quay Wall Construction

    By Mamdouh Hamza

    The construction of 1200 m length new quay wall located 1,300 m East of the existing Suez Canal bypass and about 1,000 m south of the Mediterranean shoreline is one of the main projects currently unde

    Jan 1, 2002

  • DFI
    Assessing the Applicability of Thermal Response Testing to Energy Piles

    By C. Guney Olgun, Fleur Loveridge, Tracy Brettmann, William Powrie

    "Abstract Deep foundations are increasingly being used, not just to carry structural loads, but also to act as heat exchangers as part of a ground source heat pump system. Such foundations, often call

    Jan 1, 2014