Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Hoisting Systems (a4900c29-13ab-4c51-a9d4-095a976b1923)

    By Christopher J. Bise

    INTRODUCTION The transportation of men, supplies, and mined material from an underground operation is the connecting link between the mine plant and the surface plant. Unless the mine is accessed by

    Jan 1, 1986

  • SME
    Investigation Of The Effects Of Various Water Mediums On Desulfurization And Deashing Of A Coal Sample By Flotation

    By F. D. Ayhan

    The aim of this study was to investigate the effects of various water mediums on desulfurization and deashing of a coal sample using flotation. For this purpose, experimental studies were conducted on

    Jan 1, 2009

  • SME
    Computational Fluid Dynamics Modeling Of Spontaneous Heating In Longwall Gob Areas (SME Annual Meeting Feb. 25-Feb. 28, 2007, Denver, CO )

    By L. Yuan, A. Smith

    In order to provide insights for the optimization of ventilation systems for U. S. underground coal mines facing both methane control and spontaneous combustion issues, a computational fluid dynamics

    Jan 1, 2007

  • SME
    Risk Quantification in the Mineral Sector

    By K. Bounou, K. Komnitsas

    "Risk quantification may be used as a sustainable development index in the mining industry, since it encompasses both economic and social factors. In addition, it may assist in the development of a fr

    Jan 1, 2005

  • SME
    Estimation Of Incremental Haulage Costs By Mining Historical Data And Their Influence In The Final Pit Limit Definition

    By R. Benito

    This paper describes the application of modern data-analysis tools, such as data mining, to determine a representative cost driver for haulage activity. This cost driver was subsequently used to trace

    Jan 1, 2008

  • SME
    DPI - Disputes Potential Index on the Predictability of Tunneling Project Contract Disputes

    By James Diekmann

    The Disputes Potential Index (DPI) is a computer program designed to help team mem¬bers assess the likelihood of contract disputes on a construction project. The program's predictions are based o

    Jan 1, 1995

  • SME
    Construction of the Combined Sewage Overflow Tunnel for the City of Fall River

    By Shemek Oginski

    The 5 km (16,194 lf) of 6.1m (20 ft) diameter TBM driven tunnel built by the J.F.Shea Co. will serve as sewage overflow storage. The TBM tunnel and four connecting tunnels excavated by drill and blast

    Jan 1, 2005

  • SME
    Gold and Silver Exploration in Irian Jaya

    By D. Potter

    In 1990, Freeport Exploration began regional reconnaissance exploration programs in Irian Jaya, the easternmost province of the republic of Indonesia (Fig. 1). Irian Jaya occupies the western half of

    Jan 1, 1999

  • SME
    Summersville Raw Water Intake

    By Douglas Banks

    Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake

    Jan 1, 2005

  • SME
    Snow Tunneling at the South Pole

    By John H. Wright

    The United States Antarctic Program (USAP), through its principal support contractor Raytheon Polar Services Co. (RPSC), has recently completed a three-year project comprising nearly 936 m (3,071 ft)

    Jan 1, 2002

  • SME
    The application of nitrogen to control a spontaneous combustion event during a longwall face salvage

    By Leeming. J. R.

    In the UK, powered supports are normally salvaged from longwall faces on completion of production, for reuse on the next unit. Where a spare set of supports are held, the salvaged supports are often s

    Jan 1, 2009

  • SME
    Tunnelling on the South East Transit Project

    By T. W. Peglas, J. Doherty, R. A. Day

    The South East Transit Project is a $520 million project in Brisbane, Australia which includes the construction of a 32 km Busway to access the south-eastern suburbs. Close to the centre of Brisbane,

    Jan 1, 2001

  • SME
    Biomineralization Of Manganese By Bacillus Spp Isolated From A Marine Biofilm

    By H. Sarvamangala

    Biomineralization of manganese on titanium condenser material exposed to seawater has been illustrated. Biom-ineralization occurs when the fouling components, namely, the microbes, are able to oxidize

    Jan 1, 2008

  • SME
    Analysis of Rheological Characteristics of Deep-sea Mining Robot’s Roller

    By Hyung-woo Kim, Kiyoung Sung, Sup Hong, Jung-Yeul Jung

    Many concepts for the commercial production of deep-seabed manganese nodules have been studied since the 1970s. However, the bearing capacity of the deep seabed is not strong because it is composed of

    Sep 1, 2014

  • SME
    Challenges Of Conveyors In Tunneling

    By Marco Sonnenschein

    As time is costly, engineering companies have developed methods, procedures and mechanical equipment to tunnel faster. But the best excavation method will not be able to cope with the time pressure if

    Jan 1, 2012

  • SME
    The Technical/Economic Evaluation Of The Physical/Chemical Demineralization Of Coal

    By D. L. Kiser

    Conventional and advanced coal preparation technologies were investigated through both a literature search and through direct contact with investigators and developers. In addition to a brief descript

    Jan 1, 1986

  • SME
    Northwest Mining Association Sparks Glimmer of Mining Hope

    By Steve Kral

    The domestic mining industry may be in the doldrums but there appears to be hope, at least from a regulatory standpoint. At least one US senator believes that the events of Sept. 11, 2001 made man

    Jan 1, 2002

  • SME
    Plant Design, Practice Conference Attracts Processing Specialists

    By William R. Yernberg

    The Mineral Processing Plant Design, Practice and Control Conference was held from Oct. 20through 24, 2002, at the Fairmont Hotel, Vancouver, British Columbia, Canada. The conference was attended by

    Jan 1, 2003

  • SME
    Design and Construction of a Multiple-Drift Subway Underpinning Structure for Boston’s Central Artery/Tunnel Project

    By Robin B. Dill, Mark Pelletier, Daniel J. Dobbels, Subodh Bhaumik, Daniel J. VanRoosendaal

    Although primarily cut-and-cover excavations are required for replacement of the existing elevated I-93 interstate highway through the heart of Boston for the Central Artery/Tunnel (CA/T) project, som

    Jan 1, 2001

  • SME
    Proactive Approach To Addressing Environmental Concerns For Tunneling Under Austin

    By Ray Brainard

    The Jollyville Transmission Main will be a 10.5-km- (6.5-mile)-long, 213-cm (84-in.) diameter rock tunnel. The tunnel will pass beneath the Balcones Canyonlands Preserve, which was established to prot

    Jan 1, 2012