Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Driving Haulage Productivity Improvements through Industry–Academia Collaboration

    By R Thompson, J Miedecke, D Handel, E Tomicek, D Tulloch

    "The Mine Haul Road Optimisation Alliance (HROA) is a unique Australian industry–academia collaboration that has been developed to support mine haul road operators. The alliance integrates industry, e

    Nov 15, 2016

  • AUSIMM
    Pillar Design Procedures and Research Methodologies - Can There or Should There be a Unified Approach?

    After some 50 years of worldwide research in relation to coal pillar mechanics and design as well as numerous workshops and technical papers related to these issues there is still some significant dis

    Nov 25, 2010

  • AUSIMM
    Water Treatment at Waikato North Head Mine Site

    By B Orchard

    New Zealand SteelÆs Waikato North Head mine, situated at the mouth of the Waikato River, supplies approximately 1.2 million tonnes per annum of titanomagnetite concentrate to the Glenbrook steel mill.

    Jan 1, 2002

  • AUSIMM
    Orogenic Gold Deposits – A Two-stage Process of Gold Enrichment

    By R R. Large

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The formation of orogenic gold deposits is commonly a two-stage process. The first stage in

    Mar 18, 2015

  • AUSIMM
    Techniques Used and Problems Encountered in Normal and Reverse Circulation Drilling at the Mt Roseby Project, Cloncurry, North West Queensland

    Techniques Used and Problems Encountered in Normal and Reverse Circulation Drilling at the Mt Roseby Project, Cloncurry, North West Queensland

    Sep 13, 2010

  • AUSIMM
    Non-Destructive Testing of In Situ Underground Mine Seals - Initial Technology Assessment

    By C Harwood, EáWestman, K Luxbacher

    Testing of in situ seals in underground coal mines is critical to determine seal integrity and to provide safe working conditions. In the wake of the 2006 Sago Mine explosion, the United States of Ame

    Jul 1, 2013

  • AUSIMM
    Manufacture of Cement From Blast-Furnace Slag (6eef645a-945d-4a5e-8744-528d84407d12)

    THE successful establishment of iron blast-furnace plants at Newcastle and Lithgow naturally invites attention to the economic utilization of the various products and by-products arising out of the in

    Jan 1, 1918

  • AUSIMM
    An Integrated Approach to Proactive Tailings Management

    By T Huynh, K Tungpalan, E Wightman, M Edraki, S Palaniandy

    Most preventive environmental management practices promote proactive integrated approaches to waste management. For example, life cycle assessment is often used to find the ‘hot spots’ of environmenta

    Jul 27, 2015

  • AUSIMM
    Containerisation And Heavy Lift Cargoes

    The growth of "Unit Load-cargo handling technology in world cargo lin- er trades over the last decade has cre- ated a situation in which special pur- pose-vessels (cellular container ships, roll-on/r

    Jan 1, 1973

  • AUSIMM
    Drying and Roasting of Zinc Concentrate at Zeehan Works of Electrolytic Zinc Company of Australasia Ltd

    ZINC concentrate, produced at Zeehan by flotation from Read Rosebery ore, is also dried and roasted at the same place for the production of a calcine suitable for use in the electrolytic zinc process

    Jan 1, 1927

  • AUSIMM
    Management of Acid Drainage in the Australian Minerals Industry

    Confirmation that acid drainage (AD) was a significant environmental issue for the Australian minerals industry came in 1992 with the first national workshop on the topic. Subsequently the extent of A

    Jan 1, 2003

  • AUSIMM
    An Update on the Geological Resource Map (Germ) Computerised Mineral Deposit Inventory Database

    The Geological Resource Map of New Zealand (GERM) is a computerised inventory of aggregate, mineral, coal, petroleum and thermal water occurrences, containing summary information on location, producti

    Jan 1, 1991

  • AUSIMM
    Western Lode Structures and Southward Extensions of the Boulder Mining Belt

    An intensely sheared and mineralized zone occurs in the quartz dolerite greenstone (or younger greenstone) mass on the western limb of the Kalgoorlie syncline. This zone comprises the western part of

    Jan 1, 1964

  • AUSIMM
    Simulation and Analysis of Media Behaviour in the Tower Mill by Discrete Element Method for Estimating the Power Draw and Spatial Distribution of Grinding Process

    Simulation and Analysis of Media Behaviour in the Tower Mill by Discrete Element Method for Estimating the Power Draw and Spatial Distribution of Grinding Process The trends to the Tower Mill (TM) fo

    Sep 13, 2010

  • AUSIMM
    Propagation of the South Wedge - Drill and Blast

    By R Cunningham, P Duniam

    Late in 2005 it became apparent that cave propagation at the Northparkes Mine was not progressing as planned. By mid-2006 sufficient Reserves were identified to warrant an extensive drill and blast pr

    Jan 1, 2007

  • AUSIMM
    Geotechnical Milestones at Mount Lyell Mine

    By D A. Cuello, G B. Sharrock

    The Prince Lyell orebody at Mount Lyell Mine has a rich mining history commencing with the open pit in 1935, which transitioned underground in 1972. Between 1972 and 2014 a total of 64 Mt was mined un

    May 9, 2016

  • AUSIMM
    Carbonate in Synthetic and Biological Apatites

    By X Liu

    The crystal chemistry of carbonate in Ca apatites, including Na-free and Na-bearing hydroxylapatite (CHAP) and Na-bearing fluorapatite (CFAP) and chlorapatite (CCLAP), has been investigated by Fourier

    Jan 1, 2008

  • AUSIMM
    The coalmine roof rating – an update in its calculation and mechanistically why it works

    By M Colwell

    The Coal Mine Roof Rating (CMRR) is a rock (roof) mass classification (RMC) system/index that was originally developed by the United States Bureau of Mines (USBM) for aspects of underground coalmine g

    Nov 29, 2022

  • AUSIMM
    The 2,600 Feet Level Exploratory Drive North at North Broken Hill Limited

    CONTENTSIntroductionNorthern ExplorationDrive ConceptionGeneralDriving CrewDrive Cross Section and Track DetailsVentilation by Electrically Driven FanTemperatures and HumidityFan PerformanceRock Drill

    Jan 1, 1946

  • AUSIMM
    Strength and Stiffness Parameters for Tunnels in Weak Sedimentary Rocks – A Case Study of the East Coast Bays Formation in Auckland, New Zealand

    By W Newns

    This paper describes laboratory and in situ tests and determines a set of parameters for stiffness and strength properties for a weak sedimentary rock mass, the East Coast Bays Formation of Auckland.

    Mar 8, 2011