Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Improved forged grinding media performance with carbon content greater than 1.0%

    By R Bose, M Bovell, G Cheong

    Grinding media is a major consumable in mineral processing and therefore decreasing costs associated with its consumption is regularly considered a key goal for the minerals processing industry. Grind

    Aug 29, 2018

  • AUSIMM
    Shifting post-mining land use planning from mine site to regional scale

    By C M. Côte, S Worden, K Svobodova

    Mines in Queensland are transitioning to the progressive rehabilitation and closure plan (PRCP) framework. Mine operators are required to select and justify appropriate and viable post-mining land use

    Aug 2, 2023

  • AUSIMM
    Site Investigation, Instrumentation and Results of a Trial Embankment on Coal Tailings

    By Morris P. H

    A trial embankment was constructed using coarse coal mine reject on a deposit of crusted coal mine tailings at New Hope Colliery, located in the Bundamba District of the West Moreton Coalfields in Sou

    Jan 1, 1990

  • AUSIMM
    The Influence of Charge Distribution on the Grindability of the Blasted Material

    By J Seccatore, G Sadao, M Cardu, G De Tomi, L Finoti, F Galvão, J Romero Huerta, A Rezende, J Bettencourt

    In the mining industry, rock blasting can be considered as the first phase of comminution. The downstream phases of comminution are mechanical, and consist in consecutive stages of crushing and millin

    Aug 24, 2015

  • AUSIMM
    Mount Isa Mines Rehabilitation Materials Sampling and Analysis program for closure planning

    By C Nucifora, M Landers, J Jones, G Maddocks, K Mandaran, A Forbes, W Wilson, S Newman

    Glencore’s Mount Isa Mines Limited (MIM) operates the Mount Isa open cut and underground copper (Cu) and zinc-lead (Zn/Pb) mines near Mount Isa in Queensland, Australia. Tailings from processed Cu and

    Jul 25, 2018

  • AUSIMM
    Old Stopes and New Simulations – A Structural Modelling and Resource Estimation Case Study of the Edna May Gold Mine, Western Australia

    By P Hodkiewicz

    Recent structural interpretations based on historic stope shapes were used to develop a rapid and innovative method to domain and simulate structurally complex, high-grade gold veins at depth in the E

    Aug 22, 2011

  • AUSIMM
    Enough is Enough ù Environmental Fallacies Confronted by the Mining Industry

    For too long we, as an industry, have borne the brunt of irrational claims, poor science and even worse, journalism with regards to our affect on the environment. To some of us, the overwhelming media

    Jan 1, 2004

  • AUSIMM
    Eight years of ACARP research on rehabilitation of challenging mine sites – practical application in the era PCRPs

    By L McCallum, G Dale, B Silverwood, T Roscoe, A Costin

    The introduction of Progressive Closure and Rehabilitation Plans (PCRPs) in Queensland from 2019 places greater importance on planning and implementation of mine rehabilitation activities. The progres

    Aug 2, 2023

  • AUSIMM
    Newly Developed Method and Equipment for Tunnel Excavation-Construction of Myojin Tunnel

    By Fukuichi K, Matsukawa H, Nakagawa M

    The Myojin Tunnel, located on the Shikoku Expressway being constructed by the Japan Highway Public Corporation, is 3,770 m long with a cross sectional area of 80 m2. Kajima Corporation, the contrac

    Jan 1, 1987

  • AUSIMM
    Coarse processing of South African banded iron formation (BIF)

    By N Maistry, C Carelse, A Singh

    Banded Iron Formations or more commonly known as BIF are sedimentary rock formations with alternating silica-rich layers and iron-rich layers that are mainly composed of iron oxides (hematite and magn

    Sep 18, 2023

  • AUSIMM
    Robust flexibility – a methodology for agile systems engineering in mining

    By D Brown, Z Tabor

    Projects must be flexible to account for the rapid development of new technologies and changing stakeholder expectations. Coupled with calls for bleeding-edge solutions, customers, shareholders, and r

    Sep 1, 2024

  • AUSIMM
    Some Real and Imaginary Examples of Volcanic Hazard and Risk Assessment

    An empirical method of estimating dense rock (D.R.E.) equivalent volumes erupted as airfall tephra, described in a companion paper in this volume, is elaborated, and its accuracy discussed. Estimates

    Jan 1, 1990

  • AUSIMM
    Driving improvements to underground diamond drilling effectiveness through real-time implicit modelling at Olympic Dam

    By J Taylor, M Smith, A Tunnadine, D Nikolakopoulos

    As Olympic Dam rapidly expands into the Southern Mine Area (SMA) the Mine Geology team has concurrently ramped up underground diamond drilling to sustain rates of above 175 km/a. With >10 underground

    Mar 22, 2022

  • AUSIMM
    ICP Analysis In Geochemical Prospecting-1

    In the late 1970's Western Mining Corporation, Exploration Division considered the purchase of a major multi-element spectrometer as an adjunct to our existing atomic absorption spectrophotom

    Jan 1, 1987

  • AUSIMM
    The Identification of Contaminants in Mine Site Waste Waters by ICP-MS

    By Mine F. J, Woods P. H

    Waste waters from mine sites may be screened for all constituents of significance as a first step in establishing water quality criteria for protection of aquatic ecosystems. Inductively-coupled pla

    Jan 1, 1994

  • AUSIMM
    Building Safe, Productive Cultures and Leadership

    By M I. Roberts

    Corporate and workplace culture, as many owners, directors, executives and managers know, is by far the most powerful determinant of productivity. It’s much more significant than buildings and equipme

    Jun 22, 2016

  • AUSIMM
    Comparison between ball mill and vertical stirred mill for the fine grinding of a low-grade iron ore

    By H Turrer, M Badawi, R Belissont, Y Foucaud, E Kleiderer, L Southavy, J Mesquita, Y Basselin

    The Mont Reed iron ore deposit, owned by ArcelorMittal, is situated approximately 140 km southwest of the Mont-Wright mine in the southern region of the Labrador Trough, Canada. Acquired by Québec Car

    Sep 18, 2023

  • AUSIMM
    Advances in Research on Metallogenic Mechanisms for the Xitieshan Sedimentation-exhalation Lead-zinc Deposit, Qinghai Province, China

    By S Q. Zhao, J H. Wei

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Xitieshan lead-zinc deposit is located in the north margin of the Qaidam Basin, Qinghai

    Mar 18, 2015

  • AUSIMM
    BHP Billiton Iron Ore Car Dumper 4 - Temporary Works

    By D Ford

    BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow

    Jan 1, 2007

  • AUSIMM
    Mineralogy of Gold in Polymetallic Deposits of Serbia

    By J Stojanovic, V Kasic

    Gold-bearing polymetallic sulfide deposits are common in Serbia, and mostly occur in the Karpato-Balkan and, to a lesser extent, the Serbo-Macedonian metallogenic province. These deposits û Coka Marin

    Jan 1, 2008