Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Blast Fragmentation Impacts on Downstream Processing at Goldfields Cerro Corona

    By D La Rosa, K Caron, H Mamani, W Valery, R Diaz

    The Gold Fields Cerro Corona copper-gold deposit in Peru has heterogeneous rock characteristics in terms of its mineralogical, geological and geotechnical properties. Blast design variations in these

    Aug 24, 2015

  • AUSIMM
    Applications of Fine Screens in Grinding Circuits

    By J E. Wheeler, S B. Valine, L G. Albuquerque

    It has long been known that closed circuit grinding with a classifier improves grinding efficiency, reduces unit specific power consumption, and reduces over grinding. The classification device remove

    Oct 29, 2012

  • AUSIMM
    Metallurgical test work – between a rock and a hard place

    By K Fiedler, A Newell, P D. Munro

    Test work is the foundation upon which the success of projects and subsequent operations is laid, reflected in Professor Arthur Taggart’s pithy observation: ‘Make your mistakes on the small scale and

    Aug 29, 2018

  • AUSIMM
    A quantitative risk assessment tool for geothermal outbursts at Lihir Gold Mine

    By M Zoorabadi, Y Zhang, D Bringemeier, S Nicoll, N Kerr

    Lihir operations of Newcrest Mining Limited (NML) are on Lihir Island (PNG) which is located approximately 900 km north-north-east of the national capital Port Moresby. The mine is located within the

    Nov 29, 2022

  • AUSIMM
    Pastefill - A Multi-Disciplined Review of Barrick Gold Corporation's Pastefill Operations in Australia

    During 2009 the technical services staff at Barrick Gold Corporation's Australian Business Unit conducted a review of their five underground mines that utilise pastefill as the backfill component

    Nov 25, 2010

  • AUSIMM
    Using high-efficiency downhole assay to improve the financial performance of open pit copper mining operations

    By H Rossiter, A Maddever, J Market, P Jeanneau, A Virani

    It is generally acknowledged that the head grade of the world’s copper resources is declining. Accordingly, there is an increase in the volume of resource material being mined and processed to maintai

    Nov 10, 2020

  • AUSIMM
    An approach to the calibration and validation of transfer chute DEM simulations handling cohesive iron ore fines

    By T Walkemeyer, R Elliott, D Chang-Martin

    Over the past decade, discrete element method (DEM) simulations have seen increasing adoption by the resources sector to inform the design of materials handling equipment such as transfer chutes, bins

    Sep 18, 2023

  • AUSIMM
    Near field blast vibration monitoring for slot or winze blast analysis

    By E Wargem

    The optimum mining of an orebody in an underground mining operation is fundamental to the mine’s ability to operate both sustainably and efficiently. The effective mining of an open stope or a cave is

    Mar 29, 2023

  • AUSIMM
    Productive Partnership – Controlling Vibration and Maintaining Critical Electricity Supply

    By M Nagarajan

    Orica Mining Services (Orica) in partnership with Coal and Allied’s Hunter Valley Operations (HVO) has developed a risk management process to maximise mining efficiency whilst controlling vibration an

    Nov 8, 2011

  • AUSIMM
    The Potential for Backfill in Highwall Mining (7bcc6ff0-6f9e-4f39-8e8f-1dbb9d479afe)

    By Boyd GL

    Backfill applied to highwall mining is foreseen as a means to increase recovery of mineable coal to levels comparable with underground longwall mining. This paper describes the progress of research

    Jan 1, 1998

  • AUSIMM
    A Study on the Impact of Utilising Sea Water for Wet Concentration of Beach Minerals Deposits on the Recovery and Quality of Ilmenite Produced by High Tension Separation

    By C Swamydas

    VV Mineral (VVM) group of companies is the largest and the first private producer and exporter of beach sand mineral products in India. During 2010, the company produced and marketed around 750 000 to

    Oct 5, 2011

  • AUSIMM
    Concept Design of the Central Business District Rail Link, Auckland

    By J Q. Cooper

    The New Zealand rail authority, Kiwi Rail and Auckland Regional Transport Authority (ARTA), are jointly planning a new mainline rail link between Auckland’s downtown Britomart Station and the existing

    Mar 8, 2011

  • AUSIMM
    A New Gold Lixiviant - CSUT(1)

    By Hu Y, Li D, Qu G

    In this paper the structural mechanism of the gold - lixiviant complex is investigated. The results show that there are two common characteristics in the outer orbitals for all the gold lixiviants:

    Jan 1, 1993

  • AUSIMM
    Presidential Address 1984 - There are Also Small Mines

    My roots span four generations. My great grandfather, Christian Frederick Fisher, along with twenty-one others was drowned in the New Australasian mine disaster at Creswick in Victoria in 1882. My gra

    Jan 1, 1984

  • AUSIMM
    Development of an iron ore analysis method applying assimilation reaction to coarse ore

    By Y M. Lee, Y Hong, B C. Kim

    Since sintered ore is the primary source for producing molten iron in the blast furnace process, maintaining stable quality despite the utilisation of low-grade iron ore is crucial. However, conventio

    Sep 18, 2023

  • AUSIMM
    The Mineral Industry - What Next? - 1

    The theme of my address to your Institute, indeed its name, is "The Mineral Industry - What Next?" Knowing that I was required to make four appearances, and not wanting to be too repetitious

    Jan 1, 1984

  • AUSIMM
    No. 3 Headframe

    To finalise the arrangement and details of the headframe to be erected over the new No. 3 Shaft, the haulage and winding equipment requirements were first determined, then tentative designs were prepa

    Jan 1, 1957

  • AUSIMM
    Prevention of Blast Induced Damage to Underground Mine Infrastructure from Open Pit Operations – A Case Study

    By A Campbell

    Open pit blasting at Ernest Henry Mining has the potential to cause damage to nearby underground workings. This paper is a case study of the blast vibration management project that was conducted to en

    Nov 8, 2011

  • AUSIMM
    A Model To Control Bins for Hydraulic Hoisting

    A model has been developed for the per iodical maintenance of bins used for hydraulic hoisting in mining of steeply inclining coal seams. This model gives a control plan for hoisting, bin switching

    Jan 1, 1977

  • AUSIMM
    Selective Extraction Dynamic Cone Algorithm for Three-Dimensional Open Pit Designs

    By Mogi G, Akaike A, Yamaguchi U

    A new algorithm has been investigated for three-dimensional open pit designs to improve the dynamic cone approach which utilises the dynamic programming technique. The conventional dynamic cone met

    Jan 1, 1995