Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Role of Environmental Ore Deposit Models in Resources DevelopmentBy Y T. J Kwong
With the recent emphasis worldwide on environmental protection and sustainable development, finding an enriched mineral deposit no longer guarantees mining development. Only if the identified resource
Aug 22, 2011
-
Brave New Mine – Examining the Human Factors Implications of Automation and Remote Operation in MiningBy T Horberry
This paper describes work conducted as part of an overall research project that aims to identify current and emerging trends in the development of automation and remote mining technologies, and to pro
Nov 22, 2011
-
Slag-metal interfacial reactions in pyrometallurgical processing of industrial wastes for recovery of valuable metalsBy J H. Park, R R. Kim, H S. Park, H J. Kim
This study focuses on the recovery of valuable metals, specifically silver (Ag) and palladium (Pd), from copper-containing sludge (with copper content less than 20 per cent) generated during PCB proce
Jun 19, 2024
-
The Technical Analysis of Lead Blast Furnace Slag, as Practised at the Port Pirie Works of The Broken Hill Associated Smelters Pty. Ltd.THE slag from the blast furnaces having been granulated, a representative sample is taken to the sample mill. It is then dried, crushed through a 100-mesh screen, intimately mixed, and packeted for as
Jan 1, 1922
-
Artificial Intelligence (AI)-based predicting influence of technological innovation on stock price of iron ore mining companiesBy P Mugebe, M Yahyaei, M S. Kizil, R Low
This paper seeks to establish an empirical relationship between the impact of mining technological innovation implementation and a company’s market value. The company’s market value is represented by
Sep 1, 2024
-
Studies on the Design Circuit for Compact Itabirite of Conceitpo MineBy E S. Souza, H Delboni Jr, M F. Calixto
This paper aims at presenting the results of laboratory, pilot plant and simulation studies for the design of the grinding circuit for the beneficiation of compact itabirites from the Conceitpo mine.
Jan 1, 2007
-
Cape Lambert Port B Shiploading, Sampling and AnalysisBy M Graham, R Brunning, C Andringa-Bate, S Westergren
In 2010, Rio Tinto Iron Ore’s operations commenced the planning and design of a sampling and analysis system for the new 50 Mt/a Cape Lambert Port B (CLB) facility. Current sampling systems at the por
Jul 29, 2014
-
The necessary role of the geologist in geotechnical data gatheringBy P B. Hills
Almost a quarter of a century since Bridges (1993) documented techniques for the assessment of ground conditions in a seminal paper in the Proceedings Second International Mining Geology Conference, t
Sep 20, 2017
-
Implementation of Localised Uniform Conditioning for Recoverable Resource Estimation at the Kipoi Copper Project, Democratic Republic of the CongoBy M G. Millad, M Zammit
The Kipoi Central (KPC) copper project is located in the Katanga Province in the Democratic Republic of the Congo and is presented here as an example of an operating mine where the Mineral Resource wa
Aug 18, 2014
-
Measuring and Utilising Ore Quality Variability Using Real-time On-belt Elemental Analysis to Improve Mill Feed QualityBy H Kurth
"The focus of this paper is on measuring the composition to improve mill feed quality to minimise the processing of waste, optimise process performance, reduce processing costs and minimise the genera
Oct 10, 2016
-
Characterisation of pore pressure in tailings dams and the implications for designBy D Johns, L Murray
This paper discusses pore pressures in the embankments of tailings dams by comparing real world data with common design assumptions. Assessment of pore pressures has implications on material behaviour
Jul 23, 2018
-
Geometallurgical Modelling of the Dumont DepositBy M Sciortino, J Korczak, J Muinonen, A St-Jean
The Dumont deposit is a large (1179 Mt reserve), low-grade (0.27 per cent nickel) nickel sulfide project located in the Abitibi region 25 km west of Amos, Quebec. Royal Nickel Corporation (RNC) acquir
Sep 29, 2013
-
Dust Management - Thinking Outside the SquareDust emissions from mining, material processing and ship loading operations (fugitive dust sources) are an environmental issue of increasing concern to both government regulators and the community. Th
Jan 1, 2009
-
New Methods for Quantifying Geology and Geological Engineering Risk in Large-Scale Deep Tunnelling – Both in Design and in the Build PhaseBy D FitzGerald
A critical component of any new tunnel design in a complex geological setting is the development of an integrated three-dimensional (3D) geology model with a full set of geotechnical properties of the
Mar 8, 2011
-
Challenging the Norms Time Usage Model – Mobile Underground Mining EquipmentBy R Ballantyne, M Adams
Time Usage Models, used as a basis for calculating performance indicators for mobile mining equipment, have developed from very simple to very sophisticated models. This development has paralleled the
Mar 15, 2021
-
Using Geometallurgy during Process Optimisation Activities at the Southern Middleback Ranges Magnetite ConcentratorBy D Olwagen, C Stanton, J Gerber
From December 2013 to February 2014 the Southern Middleback Ranges magnetite concentrator went through a successful optimisation process that included the installation of extra grinding power to treat
Jul 13, 2015
-
Integrated Planning, Mining and Rehabilitation for Effective Results and Sustainable Land Use - A Western United States PerspectiveBy V Pfannenstiel
The United States (US) coal mining industry has been working under comprehensive planning, operating and rehabilitation regulatory requirements for nearly 35 years. The public desire for environmental
Jul 10, 2012
-
Forecasting mine seismicity – towards a more established methodologyBy A Vakili, F Harvey, H Greaves
Mine seismicity is one of the most difficult geotechnical risks to manage in seismically active mines. There are currently some established empirical and statistical methods that provide quantitative
Nov 30, 2018
-
A tailored solution to determine plant capacity using strategic analysisBy J Nortier, J Dray
There is no single factor that determines the appropriate capacity for a mining project. It is driven by the size of the resource, the capacity of the market, the availability of capital, the availabi
Jun 22, 2022
-
Overcoming implicit modelling software limitations using Python scripting – an innovative geological modelling workflow for George Fisher Mine, Queensland, AustraliaBy L Bertoss, D Carvalho
In the last decade, the use of advanced implicit modelling software/algorithms in mineral resource workflows has become a best practice in the mining industry. In most cases, these workflows can easil
May 24, 2023