Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    How economics drive the application of ore sorting

    By W Kendall

    Ore sorting has the potential to reduce the feed to wet plants and in the case of complex orebodies that can significantly reduce the water, energy and reagent consumptions and resulting operating cos

    Nov 21, 2018

  • AUSIMM
    Digital mapping for rock mass discontinuities – opportunities and challenges

    By J Leem, S Mehrishal, J Kim, A Fereshtenejad, J Song

    Rock mass discontinuity mapping plays a crucial role in developing a reliable Discrete Fracture Network (DFN), providing insights into the distribution of geometrical and mechanical properties of disc

    Sep 1, 2024

  • AUSIMM
    Model Studies of Mining Pillar Stability

    By Szwedzicki T

    Uniaxial testing was performed on model pillars to determine the effect of width to height ratio on pillar and surrounding rock mass stability. Samples were modelled in a shape similar to that of du

    Jan 1, 1994

  • AUSIMM
    Mesozoic-Early Cenozoic Evolution of the Pacific Continental, Margin of South America

    The relevant characteristic of the evolution of the Pacific continental margin of South America during the Mesozoic-Early Cenozoic has been tectonic segmentation. This has controlled suc-cesive episod

    Jan 1, 1990

  • AUSIMM
    Trajectory Design and Economic Analysis of Asteroid Mining Missions to Asteroid 2014 EK24

    By S Dorrington, J Olsen, N Kinkaid

    Several studies have been conducted on the economic analysis of mining near-Earth asteroids for resources for use in Earth orbit. While these studies use detailed economic figures of merit, they often

    Nov 4, 2015

  • AUSIMM
    A Pyrolysis Approach to Refractory Gold Processing

    By Anylmore M, Walker A, Fletcher A

    Roasting of sulphide and sulph-arsenide gold ores produces unwanted emission of sulphur and arsenic oxides, and a less than complete recovery of gold. Pyrite loses sulphur and arsenopyrite loses ars

    Jan 1, 1992

  • AUSIMM
    A Simulation of the Kalgoorlie Nickel Smelter Flowsheet Using METSIM

    By Gray N. B, Grimsey E. J

    A steady state heat and mass balance simulation of the Western Mining Kalgoorlie Nickel Smelter (KNS) flowsheet was developed within the framework of the commercial software METSIM. The KNS simulati

    Jan 1, 1991

  • AUSIMM
    A Comparison of Skip Loading Systems from an Operational, Maintenance, Safety and Capital Cost Estimate Perspective

    By A E. A Northcote

    The drive to maximise performance, reduce maintenance times, improve safety of operation and maintenance on mining equipment while keeping both operational and capital costs down has provided good nou

    Mar 21, 2011

  • AUSIMM
    Retreatment/Flotation Rationalisation at Renison

    Revised throughput rates, as a result of current mining methods and tight controls on mine dilution, have dictated a change in metallurgical philosophy at Renison Limited. Emphasis on throughput cap

    Jan 1, 1991

  • AUSIMM
    Roof Support of Square Pillar Extraction Systems

    General design of pillars to ensure a continuing roof support during ex- traction is discussed. Practical problems associated with pillar extraction are Outlined.

    Jan 1, 1974

  • AUSIMM
    Introduction of Trackless Haulage at Long Shaft Kambalda Nickel Operations

    By Eyers G. C

    Long Shaft was initially developed using a rail haulage system on every working level comprising battery electric locomotives and granby trucks loaded by rail mounted rocker shovels. Production wa

    Jan 1, 1988

  • AUSIMM
    Design of Copper-Cobalt Hydrometallurgical Circuits

    Copper-Cobalt hydrometallurgy has seen a resurgence in recent years with the development of projects in Zambia and the DRC. Many of the flow sheets are unique in their use of hydrometallurgical techni

    Jan 1, 2008

  • AUSIMM
    Port Hedland Harbour Tunnel

    By A Bennett, A Peck

    BHP has recently constructed a Hot Briquetted Iron Plant at Port Hedland in the Pilbara region of Western Australia. Supply of iron ore fines to the plant is by conveyor from the companyÆs existing Ne

    Jan 1, 1999

  • AUSIMM
    How to Increase LHD Productivity in Hard Rock Mining

    The high maintenance of load-haul-dumps (LHDs) and front end loaders in hard rock affects mine planning with reduced availability and productivity. Intensive study of maintenance costs and availabilit

    Jan 1, 1991

  • AUSIMM
    A Revolution in Raise Boring – The Development of the RBR900VF

    By R J. Wood

    Raise drilling (or raise boring) is not a new technology or methodology. The first raise drilling machine was developed by The Robbins Company (TRC) of the USA in 1962. TRC manufactured the first tunn

    Mar 24, 2014

  • AUSIMM
    Measurement and Control of the Mill Load in an Air-Swept Ball Mill Circuit

    By Sandvik

    Fine grinding in an air-swept ball mill working in closed circuit with a forced vortex air classifier has been investigated first in continuous laboratory and then in industrial scale. Results from

    Jan 1, 1995

  • AUSIMM
    High-Si Rhyolites and Shoshonitic Volcanics

    The transgressive sedimentary sequence of the Notnnea Basin contains rhyolitic lavas and less voluminous mafic and intermediate volcanims of shoshonitic affinities which erupted simultaneously during

    Jan 1, 1995

  • AUSIMM
    Revegetation Of Mine Wastes And Disturbed Areas In An Arid Environment

    By Trudinger J. P

    Concern for the environment by the public and by mining companies, has led to many recent attempts to revegetate areas disturbed by mining activities. The problem of successfully revegetating dist

    Jan 1, 1976

  • AUSIMM
    Features of Bougainville Copper LimitedÆs Concentration Water Supply System

    The problems of the as-built water supply system are discussed. Recent modifications to the collection dams and the water cleaning station using wedge wire screens to resolve these problems are ou

    Jan 1, 1978

  • AUSIMM
    Geohydrological Containment System and Microbial Water Treatment Plant for Metal-Contaminated Groundwater at Budelco

    By Buisman C. J N, Koch R. O

    Soil and groundwater beneath the Budelco zinc production plant at Budel-Dorplein (The Netherlands) are contaminated with metals and sulphate. To avoid contamination of nearby drinking water aquifers

    Jan 1, 1993