Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Improving Gold Flotation Recovery at Porgera by reducing Non-Sulphide Gangue EntertainmentThe Porgera mine and treatment plant are located in the Enga Province of Papua New Guinea. Gold in the Porgera deposit is found free and in association with the primary sulphide mineral pyrite. The
Jan 1, 1997
-
Wireless Ad hoc System for Positioning – Effective Equipment and Personnel Location for Mining OperationsBy M Hedley
Tracking plant and personnel in mining operations provides multiple potential benefits for a mine including improved safety, better monitoring of production, traffic control and, in the future, monito
Nov 22, 2011
-
Rapid Alteration Mapping Using Field Portable Infrared SpectrometersBy S Pontual
Compact and field portable infrared spectrometers have been increasingly used over the past few years by an exploration industry constantly searching for a technological edge and the ability to more a
Jan 1, 1999
-
Kinetics of Flotation of Copper Tailing from Benambra Mines, VictoriaBy Boontanjai C, Boyapati ER
Reagents used for batch flotation tests were Aeroxanthate-343 & 350, Dow Z-6, & reagent-4037 (from Benambra) as copper collectors; Na2SiO3 & Na2S2O3as gangue depressants; lime & HCl as pH regulators;
Jan 1, 1990
-
The Benefits of Automation for Mining Metallurgical Plant Analytical LaboratoriesBy B N. Morrison
In all metallurgical plants metallurgists require analyses of the various intermediate products, eg flotation feeds, flotation concentrates, tailings, mattes, slags, etc to monitor the efficiency of t
Jan 1, 2008
-
The Separation of Natroalunite from Kaolin by Selective FlocculationBy Liu H, Chen S
Natroalunite is one of colouring minerals in kaolin. In this investigation, natroalunite, on which Ca(II) was adsorbed, was flocculated by HPAM and kaolin was depressed in suspension. The adsorption
Jan 1, 1993
-
Management of Tailings and Other Wastes for RehabilitationBy Leggate J
In the past many coal mining projects commenced without any consideration being given to eventual site rehabilitation. Now that site rehabilitation is assuming greater importance with changing comm
Jan 1, 1991
-
Developments in the Operation and Control of a Zinc Lead Blast FurnaceBy Holliday RJ
The Imperial Smelting Furnace (ISF) was developed in Britain during the 1950's as a process which could produce zinc from a blast furnace. Since then it has evolved into an efficient means of
Jan 1, 1984
-
Resue Firing and Dilution Control in Narrow Vein MiningMining of narrow vein mineralisation, invariably depending on the mining method selected, involves the extraction of both ore and waste rock. The level to which mining of waste rock can be minimised d
Jan 1, 2008
-
A Study of the Potential for Surface and Ground Water Contamination by Arsenic at the Sunbeam Gold MineBy Pyrih R, House A, Shangraw J, Silva AJ
Sunbeam Mining -Corporation has the inten mine with heap leach gold recovery, near spent ore indicated a relatively high ar topographical configuration, the spent across a small drainage and a lak
Jan 1, 1988
-
The Newcrest Telfer Hoisting System ù A Very Large Friction Hoist InstallationThe hoisting system at the Newcrest Telfer mine is designed for a final duty of 7.35 million tonnes per annum at a hoisting distance of 1450 m. In terms of hoisting capacity (t/h) times hoisting dista
Jan 1, 2005
-
Simulating the Interaction of Heavy Mineral Sands Mining With the North Stradbroke Island Groundwater System (Mining in Water)By I D. Hair
A numerical groundwater model was used to predict the nature of interactions between heavy mineral sands mining operations and the groundwater regime at North Stradbroke Island, Southeast Queensland.
Jan 1, 2003
-
Plant Trial of an Under-belt Capacitance and Gamma-Ray Backscatter Gauge for on-Belt Determination of Moisture in CoalA non-contacting under-belt capacitance and gamma-ray backscatter technique has been developed for the on-line measurement of moisture in coal. In this technique, moisture was correlated with radio fr
Jan 1, 1989
-
Technical Note on an Improved Cyclosizing TechniqueThe design and operating characteristics of the hydraulic cyclone elutriator were described in detail by Kelsall and McAdam (1963), and the method of operation of the commercially available version, t
Jan 1, 1974
-
Rehabilitation at the Macraes Gold Project: from Pit to ParkGold mineralisation at the Macraes Gold Project is hosted in the Hyde-Macraes shear zone and can be traced for ~30km along strike, although economic resources are confined to a 7 km section in the vic
Jan 1, 2002
-
Cemented Rock Fill for Extraction of High-Grade Crown Pillars at Crusader Gold MineBy M Dorricott
This paper describes the design, construction and performance of sill pillars using cemented development mullock at the Crusader Gold Mine. The orebody is some 35 m - 60 m in length, 5 m - 8 m wide, d
Jan 1, 2002
-
Computers in Metalliferous Underground Mine Planning Where Are We? Where Are We Going?Computerisation of mine planning activities, specifically in the areas of geology, design and surveying, has been in progress for a number of years in underground metalliferous mines. The combined c
Jan 1, 1995
-
Newmont Waihi Operations ù An OverviewThe Newmont Waihi Operations are centred on the Martha mine at Waihi, New Zealand. The mine has produced over 6.6 million ounces of gold from both openpit and underground sources since operations bega
Jan 1, 2002
-
The Re-opening of CSA Mine, Cobar NSWBy M Scamardella
The CSA Mine is located at Cobar, New South Wales, where it was in continuous operation from 1966 to the time it went into receivership on 29 January 1998. When it closed it was under the ownership of
Jan 1, 2000
-
A Bounding Surface Model for Sand Subjected to Blast-induced VibrationsBy L M. Zhang, T H. Xu, J Zhao
Blasting is one of the most commonly used strategies for excavation in civil and mining engineering. Yet blasting can also bring along such undesirable effects as ground vibrations and soil disturbanc
Nov 5, 2014