Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Sustainability Aspects of Carbon Capture and Storage (CCS) û An Approach to a Holistic CCS AssessmentBy L Rattmann, T Katz, J B. Pateiro-Fernßndez
Carbon capture and storage (CCS) is expected to become one of the main technological instruments for mid-term reduction of CO2 emissions into the earthÆs atmosphere. Besides the reduction of CO2 emiss
Jan 1, 2009
-
Standardisation on rock characterisation, testing and monitoring with emphasis on ISRM suggested methods, practical issues and difficulties, and future trendsBy R Ulusay
Rock mechanics involves characterizing the mechanical properties and behaviour of rock material and the natural discontinuities of the rock mass, while rock engineering is concerned with specific engi
Nov 30, 2018
-
Geometallurgical Sampling and Resource Estimation for Magnetite DepositsBy J N. Farrell
Metallurgists frequently use a small number of large samples to characterise expected mill performance, with the a priori assumption that these few samples are representative of the entire deposit. Ge
Sep 5, 2011
-
Electrowinning of Copper at High Current Densities Part IIBy Andersen AK
A previous paper (1) indicated that electrowinning of copper at current densities considerably higher than those currently employed in electrowinning operations is technically feasible. It is of int
Jan 1, 1969
-
Aggregate Size Optimisation Program at the Lafarge Marblehead PlantBy C Smith, D Lilly
The Lafarge Marblehead Plant in Marblehead, Ohio, USA produces 4.2 million tonnes of sized aggregate yearly. In 1997, a program was instituted to maximise primary crusher productivity through the opti
Jan 1, 2007
-
The Underground Ore Handling System at Olympic Dam Project, South AustraliaWith production at Olympic Dam scheduled to commence in June 1988, it has been necessary to install a complete underground ore handling system capable of removing two million tonnes of material a
Jan 1, 1988
-
De-bottlenecking Iron Ore Transportation from Mine to PlantBy T Tan, C P. Holmes, C E. Hartford
Transportation of iron ore from the mine to the plant is critical to business success. Ore from the mine may have to be transported across states, countries and even continents to get to the processin
Jul 13, 2015
-
The Differences Between the Iron Formations of Grpo Para Group and Greenstone Belt Andorinhas in the Carajas Mineral Province, Para State, BrazilBy H F. Galbiatti, G J. I dos Santos, A de C Zapparoli
The Grao Para and Rio Maria greenstone banded iron formations (BIFs), within the Carajas mineral province, exhibit distinct lithological and petrographic fabrics, together with pronounced differences
Jan 1, 2009
-
The Emperor Epithermal Gold Deposit, Vatukoula, FijiBy Setterfield TN, Jones GFP, Tua P, Davis B, Antonio M
The Emperor gold deposit occurs on the western margin of a 5 Ma caldera in a large, mafic shoshonitic shield volcano on the island of Viti Levu, Fiji. Products from two major pulses of post-calder
Jan 1, 1987
-
Prediction of Instability in Slopes During Opencast mining Over Old Underground Workings in Jharia Coalfield, IndiaBy Singh T, Singh D. P
India has limited resources of coking coal. Most of the coking coal seams are located in Jharia Coalfield. These seams were worked in the past by the bord and pillar system in a haphazard manner,
Jan 1, 1988
-
Characterisation of Microstructure and Mechanical Properties of Structural Mortar of Glass Insulators Employed in Transmission LinesBy C K. Suzuki, J A. Yanaguizawa, D M. F de Santana, L R. P Leite, A H. Shinohara
In the present work, the microstructure and mechanical properties of structural mortar from glass insulators were studied by X-ray fluorescence, X-ray diffraction, infrared spectroscopy, microhardness
Jan 1, 2008
-
CanadaÆs Program for Innovations in Mining Technology in the 21st CenturyThe Canadian mining industry was in turmoil in the early 1980s. The post-war era based on reconstruction faded away after the high demands for minerals in the 1950s and 1960s. Also, the industry ha
Jan 1, 1988
-
The Preparation of Ultra-Low Ash CoalsBy Smitham J. B, Keast-Jones R
Six Australian coals were selected to determine their potential to produce, ultra low ash (less than 2 per cent) coal by progressive size reduction followed by density separation and/or froth flotatio
Jan 1, 1987
-
Optimising Mining Selectivity with Particular Emphasis on Bench Height : A Case Study at the Telfer Gold Mine, Western AustraliaBy Whitham M
Prior to exploitation, the feasibility of mining and recovering ore can usually be determined to a satisfactory level of uncertainty by the consideration of conceptual scenarios, using a range of r
Jan 1, 1991
-
Methodology for Calculating the Closure Water Balance for an Acid Generating Tailings ImpoundmentBy G W. Wilson
Rehabilitation of tailings impoundments is one of the most challenging aspects in mine closure, as not only does the potential for producing leachate pose a challenge to the rehabilitation designer, b
Jan 1, 2003
-
The Nature and Implications of Resuspension in Subaqueous Sulfide TailingsBy M H. Mian
Much has been published on resuspension of sediments in lakes and estuaries. In general, resuspension has implications on transport and release of contaminants from the sediments. It has been shown th
Jan 1, 2003
-
A Clearer View on Thickener ResearchBy J B. Farrow
The AJ Parker Cooperative Research Centre for Hydrometallurgy carries out research on behalf of, and in collaboration with, the Australian mining industry. As might be expected, much of its research i
Jan 1, 2000
-
New Blasting Initiation Technologies in the Mining IndustryAlfred Nobel first invented a practical detonator in 1863 and then the blasting cap in 1865. At that time the detonator was used on the end of a length of safety fuse to initiate nitroglycerine-based
Jan 1, 2005
-
Goldilocks – value of information for geoscience applied to coal in tactical time horizonsBy D Lucato, B Haase, R Saha, S Limberger-Forte, J Lishman
Cadia East Mining operations have employed geometallurgical techniques to advance the understanding of the in situ rock hardness variability across existing Panel Caves (PC). Geometallurgy advances th
Mar 22, 2022
-
Global Mining Standards and Guidelines for Determining Comminution Circuit EfficiencyBy A Giblett, M Daniel
"The Global Mining Standards and Guidelines Group (GMSG) currently supports nine individual industry working groups focused on developing standards and guidelines for the mining industry. In 2013 the
Oct 10, 2016