Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Comparison of the Russian and International Approaches to Mining Project Design and PermittingBy Michael J. Beare
Requirements of both local permitting and international fundraising are forcing increasing numbers of projects in Russia and CIS to carry out dual technical studies. The principal focus of Russian mi
May 1, 2009
-
The Effect of Stope Inclination and Wall Rock Roughness on Backfill Free Face StabilityBy A. P. E. Dirige
In order to maximize the recovery of ore in variably dipping ore zones of moderate width, cemented backfill is normally placed to serve as structural support. With the intention of saving on costs, ba
May 1, 2009
-
The Equator Principles and BeyondBy Tim Bekhuys
Equator Principles ? Applies to projects > $10 million ? Voluntary agreement between 58+ EPFIs ? Categorized projects based on environmental risk, consequences ? Requirements for EA, EMP, use of s
May 1, 2008
-
Contrasting Volcanic-hosted Massive Sulfide Styles ill the Tulks Belt, Central NewfoundlandBy R. M. Graves, C. B. McKenzie, D. Barbour, D. W. Desnoyers
"The prospective Tulks volcanic belt hosts five significant massive sulfide deposits, Tulks Prospect, Tulks East, Jack's Pond, Daniel's Pond and Victoria Mine, as well as numerous showings a
Jan 1, 1993
-
Arsenic Immobilization Research Advances: Past, Present and FutureBy George P. Demopoulos
In this paper the author will provide an overview of over 20 years of research & developments in the area of hydrometallurgical arsenic immobilization that culminated recently in the industrial implem
Jan 1, 2014
-
Recovery of Copper from Oxide Waste by Leaching, Ion Exchange and ElectrowinningBy G. B. Harris
A process for the recovery of copper from the waste oxide copper of a mined-out sulphide orebody is described. Hydrometallurgical recovery of copper from this and similar wastes has been tried several
Jan 1, 2007
-
Camsell Lake kimberlites, Slave Province, Northwest TerritoriesBy W. Melnyk, L Pokhilenko, J. A. McDonald, A. Hall
The Camsell Lake property comprises 270 000 acres located about 240 kilometres northeast of Yellowknife in the Northwest Territories. Kimberlite has been located in two areas of the property:
Jan 1, 2001
-
Securing maximum effectiveness from mining contractorsBy J. N. De La Vergne, J. S. Redpath
"The authors make recommendations that they believe will improve the efficiency of a mining company's use of a mining contractor's services. The recommendations are in the form of specific "
Jan 1, 1980
-
Application of a Waterless, Non-Consumable Oxygen Lance (Burner) in Metal RecyclingBy A. Siegmund, F. Mucciardi, Z. Yuan, B. Bulnes
With conventional heat pipe science as the starting point, a new heat transfer technology --- termed Thermopump technology, has been developed at McGill University and is now being tested at a number
Jan 1, 2004
-
Flash Furnace Feed System DevelopmentsBy M. Coleman, M. E. Reed
The control of feed delivery quality to the flash furnace remains an unsolved problem. Many operations around the world still have limited control of feed quality to their flash furnace. Schenck Proce
Jan 1, 2019
-
Lender?s Perspective on Financing: Back to the Future!By Jeff Stufsky
Debt Financing ?Broad Market Overview ? Recovering due to factors including: ? Increased trust in the system ? Enhanced capitalization of financial institutions ? The need to deploy capital for
May 1, 2010
-
Fugitive Dust in Surface Crushing PlantsBy G. V. Lewis
"INTRODUCTORY REMARKS""I believe we need to communicate as much as possible with the industry. I don't think that we should be a body that just goes around doing dust surveys and writing nasty letters
Jan 1, 1976
-
A Mixed Integer Linear Programming - Based Short-Term Planning ToolBy Zhanyou Huang
The logic and capabilities of a short-term planning tool are presented. It was developed using mixed integer linear programming (MILP) techniques to solve the open-pit and underground mine planning pr
Oct 1, 2009
-
A Mixed Integer Linear Programming - Based Short-Term Planning ToolBy Zhanyou Huang
The logic and capabilities of a short-term planning tool are presented. It was developed using mixed integer linear programming (MILP) techniques to solve the open-pit and underground mine planning pr
Oct 1, 2009
-
Computer Modelling of Polymer Liner Reinforcement in Underground MinesBy Jan Nemcik
Among other products steel mesh has been used successfully for many years to support strata and minimise loose material from falling into the mine opening. Installation of steel mesh has proven to be
Oct 1, 2009
-
Research on Damage and Catastrophe of Cemented Tailings BackfillBy Li Xibing
The In order to mine safely with reasonable cost, it is necessary to research the fracture characters of backfill and its matches with rock mass. Four kinds backfill with cement-tailing ratio of 0.250
May 1, 2007
-
The Implementation of a Mobile Equipment Data Collection System at Vale IncoBy Peter D. Cunningham
At Vale Inco in Sudbury, underground mobile equipment production and maintenance data is presently collected manually from paper slips. This paper reviews a pilot project that developed a system to el
Oct 1, 2009
-
Clean Technology in Coke ProductionBy Fathi Habashi
New technology first introduced by Nippon Steel Corporation at Kitakyushu in Japan in 1976 now used at a number of plants in other countries, known as dry quenching of coke, uses nitrogen in a closed
Jan 1, 2014
-
Diamonds, Kimberlites, Lamproites and Related Rocks in the United StatesBy W. Dan Hausel
"Abstract-Hundreds of diamonds have been found in the United States. The majority of the discoveries occurred during the 19th century as a by-product of placer gold mining. Most of these early diamond
Jan 1, 1995
-
Mudrush Risk EvaluationBy A. R. Guest, R. Clayton, J. Jakubec
"The potential for mudrushes is a potential hazard that should be evaluated during cave mining studies. Mudrushes are a phenomenon that can have very different origins, but produce the same results: i
Jan 1, 2016