Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Careful Blasting (125,000 cu.m) for a Shopping Centre in Downtown Helsinki

    By R Vuolio, B A. Jonsson

    In the center of Helsinki - capital of Finland - extensive blasting operations were carried out during the years 1982 - 84. At the corner of the streets Mannerheimintie and Simonkatu - in the Forum bl

    Jan 1, 1985

  • ISEE
    Permitted Explosives Research work in Australia

    By Duncan Chalmers, Rob Nowell, Miguel Araos

    Australian underground mines produce in excess of 60 mtpa of coal. Most of these use the longwall method, and they require the use permitted explosives (which are called “permissible” in other countri

    Jan 21, 2025

  • ISEE
    Optimizing Blast Hole Loading with MWD and 3D Image Analysis

    By Tristan Worsey, Brad Gyngell, Todd Buschjost, Gus Diehr

    This paper highlights the opportunities provided by integrating MWD data and drone generated 3D model to industries that use explosive energy to perform useful work as an integral part of their rock e

    Feb 1, 2020

  • ISEE
    Improving stope productivity with wireless initiation.

    By Luan Monteiro, Francisco Biulchi

    The AngloGold Ashanti - Cuiaba mine sought innovative approaches to minimize lateral development and stope extraction time while maintaining optimal gold recovery and minimizing dilution. The stope 8G

    Jan 21, 2025

  • ISEE
    Direct Stress Monitoring of Pipelines and Development of Limitations – A Case Study

    By Travis Davidsavor, David Provost

    A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep

  • ISEE
    Direct Stress Monitoring of Pipelines and Development of Limitations – A Case Study

    By Travis A. Davidsavor, David A. Provost

    A segment of high-pressure steel petroleum pipeline needed to be replaced on a hillside and beneath a waterway within an existing right-of-way containing multiple petroleum pipelines. The pipeline rep

    Feb 1, 2020

  • ISEE
    The European Integration through a Major Drill & Blast Tunneling Project

    By Demosthenes (Dennis) Efstratiadis

    After European Council’s Directive 93/15/EEC of 5 April 1993 on the harmonization of the provisions relating to the placing on the market and supervision of explosives for civil uses, the so called ”I

    Jan 1, 2018

  • ISEE
    The Largest Rock Fill Dam in the United States

    By L. L. Oriard

    he Metropolitan Water District of Southern California (MWD) supplies water to some 16 million people in a semi-arid region. Most of this water is imported. Some of the supply lines cross over the San

    Jan 1, 2000

  • ISEE
    Method of Ground Water Removal from Blast Holes

    By I. Petrovsky

    Presence of the ground water, especially flowing water, causes limitations in the type of the explosives, which can be used for the blasting development in the open cats and quarries. This presents re

    Jan 1, 2003

  • ISEE
    Using Artificial Intelligence and 3D Imaging for Real-time Fragmentation Analysis on Conveyor Belts

    By Ronald Ticona, Anaani Huaman, Andrea Lucero

    Mine-to-mill optimization begins with a clear understanding and ongoing assessment of blasting, crushing, and grinding operations. Modification of blasting practices to optimize feed size can increas

    Jan 1, 2019

  • ISEE
    ApplicationofArcGISProinBlast-InducedGroundVibrationAnalysisinanOpenPit CopperMine

    By Yong Pan, Purushotham Tukkaraja

    It has been well understood that blasting is the cost-effective method for breaking rocks as compared with the mechanical systems. However, vibrations induced by blasting in open-pit mines could pose

    Jan 1, 2019

  • ISEE
    A Blasting Plan for Loading Hot Holes

    By John R. Holliday, William Marcum

    Apogee Coal Company, DBA Arch of West Virginia, faced the challenge of drilling and blasting over one million cubic yards of high temperature overburden at its Ruffner surface operation near Logan, We

    Jan 1, 1996

  • ISEE
    Tunneling in Thinly Foliated Rockmass Conditions

    By G. C. Naveen

    Punatsangchu Hydroelectric Project Authority is constructing 1020 MW underground hydroelectric project in Bhutan. The project envisages construction of concrete dam, Desilting Chamber, Head Race Tunne

  • ISEE
    Prediction of blast induced ground vibration and its associated dominating frequency using a comprehensive support vector machine model

    By T. G. Sitharam, P. B. Choudhury

    Prediction of ground vibration (peak particle velocity, PPV) and frequency is an important task in geoscience. Till date, many empirical equations are derived from conducting trial blasts in the mines

    Jan 1, 2010

  • ISEE
    Use of Electronic Initiation System in Urban Shaft Sinking Project

    By Richard Turnbull, James Purssey

    "The Northconnex Project is a twin nine kilometre tunnel in Sydney, Australia, linking the M1 PacificMotorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. Access to the tunnels will be

    Jan 1, 2017

  • ISEE
    Analysis of Environmental Effects Induced by Cautious Blasting During the Excavation of Istanbul Subway Construction

    By Ali Kahriman, Abdulkadir Karadogan, Alper Celtikci, Ahmet Varol, Ertugrul Kaya, Turgay Ozat

    This paper presents analysis of environmental effects induced by cautious blasting during the construction of the Istanbul Subway 4 Levent - Ayazaga Darulsafaka Metro Tunnel Project carried out by the

    Jan 1, 2011

  • ISEE
    Guidelines for Mining and Quarry Blasting Urban Areas Brazilian Regulation NBR 9653 Under Current Reviewed

    By Denise de La Corte Bacci

    The Brazilian Regulation NBR 9653 is a guide intended to evaluate mine and quarry blasting effects in urban areas. The first version, written in 1986 by the Committee of the Brazilian Associate of Tec

    Jan 1, 2005

  • ISEE
    The Accuracy of blasting vibration prediction using signature hole and site constant analysis (a case study: Blasting near crusher structure, limestone mining in Indonesia)

    By Jihan Farhan Lubis, Putu Chandra Darmansyah

    Ground vibration caused by blasting has become a common concern, especially when blasting is conducted near buildings or structures. Uncontrolled vibrations can potentially damage nearby infrastructur

    Jan 26, 2026

  • ISEE
    Magnitude 2.8 Earthquake Caused by 90 Pounds (41 kg) Per Delay! Not So Fast

    By D. Rudenko, C. T. Aimone-Martin, J. K. Ratliff, I. G. Wong, J. Aiken, R. E. Burnham, T. A. Davidsavor

    A small quarry blast was conducted with a maximum of 90 pounds per delay and shortly afterwards, area residents sensed ground motion and building shaking indicative of an earthquake. In addition, seis

    Feb 6, 2023

  • ISEE
    Explosives Energy is Challenging Mechanical Energy for Overburden Removal

    By Jim Petrunyak, Conny Postpack

    The authors describe in this paper a systematic approach toward reducing coal production costs up to 35% through the use of explosives energy for overburden removal. In this system, explosives are emp

    Jan 1, 1983