Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    Using A Hindered Settling Hydraulic Sizer To Produce A Clay Product From A Mica Plant Waste Stream

    By Louis M. Schlesinger

    KMG Minerals, Inc., a mica-feldspar-quartz producer in Kings Mountain, N.C., uses about 50% of its plant's -200 mesh slimes to manufacture brick. However, the company is unable to market the rema

    Jan 1, 1994

  • SME
    Commercialization Of Oil Shales Via In Situ Retorting-Some Considerations

    By Hemendra N. Kalia

    Several attempts have been made in the past sixty or so years to commerciliaze the vast oil shale deposits of the United States of America. However, the industry has yet to become viable and economic.

    Jan 1, 1983

  • SME
    The Effect Of Dense Media Properties On The Performance Of A Dense Medium Cyclone

    By Y. B. He

    The effect of the stability and rheological properties of magnetite dense medium on the separation performance of a 6" dense medium cyclone (DMC) is studied with the use of fine density tracers. The t

    Jan 1, 1993

  • SME
    CMAR Delivery Method on the Lake Mead Intake No. 3 Low Lake Level Pumping Station - Early Stages of Success

    By Jordan Hoover, Erika Moonin, Chuck George

    "In response to a severe regional drought and in preparation for the further decline of water levels in Southern Nevada’s Lake Mead, the Southern Nevada Water Authority (SNWA) built a new intake syste

    Jan 1, 2016

  • SME
    Influence Of Step Changes In Operating Conditions On Batch Flocculation Of Mineral Fines

    By Sureshan K. Moothedath

    This paper provides a mechanistic representation for floc formation, growth and degradation and presents results from an experimental study of batch flocculation in which step changes were made in the

    Jan 1, 1993

  • SME
    Kinetics Of Gold-Bromide Loading Onto Activated Carbon (1bf8d791-d8a6-4f2b-ab08-59d0fca21853)

    By R. Mensah-Biney

    The kinetics of gold-bromide loading onto activated carbon has been investigated in a batch stirred reactor. The amount of gold adsorbed by the carbon was correlated with time based on a second-order

    Jan 1, 1996

  • SME
    Production Scale Controlled Blasting Thunderbird Mine

    By C. W. Baxter

    Eveleth taconite company was formed in 1963 to mine and beneficiate taconite on the Mesabi range of Minnesota. Its thunderbird mine is located midway between the cities of Eveleth and Virginia, Minnes

    Jan 1, 1972

  • SME
    Milwaukee's North Shore 9 Collector System - A Case History (4b2c152e-49a9-443b-856b-9db5c8f1fbd9)

    By Theodore H. Budd, Austin M. Cooney

    The North Shore 9 Collector System comprised an integral part of the Milwaukee Metropolitan Sewer District's Water Pollution Abatement Program. The project required the construction of 1,490 m of

    Jan 1, 1991

  • SME
    Characteristics Of Column Flotation Utilizing Aspirated Aeration

    By Donald E. Zipperian

    The studies described in this paper have established that flotation conducted in a column cell provided with gas generation by aspiration into surface tension lowered water, may considerably increase

    Jan 1, 1984

  • SME
    Project Financing In Chile

    By B. Morris

    This presentation will describe the process by which the Quebrada Blanca (QB) copper project in northern Chile was financed. It will also show how a relatively junior mining company addressed the prob

    Jan 1, 1993

  • SME
    Milwaukee's North Shore 9 Collector System - A Case History

    By Theodore H. Budd, Austin M. Cooney

    The North Shore 9 Collector System comprised an integral part of the Milwaukee Metropolitan Sewer District's Water Pollution Abatement Program. The project required the construction of 1,490 m of

    Jan 1, 1993

  • SME
    In Situ Leaching Of Copper -An Economic Simulation Approach (f03b625d-56a0-4dc7-9c7f-9baf892094c3)

    By A. Aly Selirn

    An economic simulation model was developed to predict the amount of copper recovered from copper oxide deposits and the cost of producing it as a function of the deposit parameters. The economic simul

    Jan 1, 1977

  • SME
    State-Of-The-Art Room-And-Pillar Retreat Mining In The Kittanning Coalbed (81cf2868-2f56-4a00-bf0d-ecde59f003b0)

    By A. A. Campoli

    The U. S Bureau of Mines is conducting research to develop improved guidelines for selecting the type and pattern of roof support in different geologic environments (Mucho, et al., 1995). As a part of

    Jan 1, 1996

  • SME
    Design Of Mount Baker Ridge Freeway Tunnel In Seattle

    By E. B. Johnson, G. Kjerbol, L. J. Holloway

    The Mount Baker Ridge Tunnel is a major improvement of Interstate Route 90 in the State of Washington. The total length of planned underground construction is about 3,400 feet (1,040 m) of which 1,332

    Jan 1, 1983

  • SME
    Past, present, and future of Texas industrial minerals

    By Brent A. Elliott, J. Richard Kyle

    This article reviews the production trends of industrial minerals since 2000 for Texas, the leading U.S. producing state of industrial minerals with a total value of $5.2 billion in 2017, equivalent t

  • SME
    Trace Elements In Sulfide Ores From Selected Deposits In The Southeastern United States

    By Jean E. Tilden

    An investigation of several trace elements distributed among sulfide minerals from deposits located in the southeastern United States was conducted. The deposits investigated are distributed within bo

    Jan 1, 1972

  • SME
    Dust Control In High-Productivity Coal Mines: Observations And Strategies In High-Quartz Sections

    By L. Xu

    Since the establishment of the standard dust concentration of 2 mg/m3, a strong effort has been made by mining engineers and researchers to provide better dust control equipment and procedures for und

    Jan 1, 1990

  • SME
    SVCW Gravity Pipeline—Ground Movements During Construction - RETC2023

    By Nik Sokol, Eric Sekulski, Leo Weiman-Benitez, Jon Hurt, Shrinidhi Vijayakumar, Phaidra Campbell

    The Silicon Valley Clean Water (SVCW) Gravity Pipeline (GP) is the first Progressive Design Build (PDB) tunnel completed in North America. As part of the Regional Environmental Sewer Conveyance Upgrad

    Jun 13, 2023

  • SME
    Determination Of Friction Factor For Kentucky's Coal Mines

    A knowledge of airway friction factor (K-factor) is necessary to designing mine ventilation systems for least cost and optimum effectiveness. The friction factor used must be accurate and reliable to

    Jan 1, 1991

  • SME
    Investigations Of Rock Mass Properties For The Foundation Of A Nuclear Power Plant At Forsmark, Sweden

    By Håkan Stille, Kjeld Boye-Møller, Lars Lundström

    BACKGROUND Forsmark Power Station is a nuclear power plant under construction at the Baltic abt 120 km north of Stockholm. Investigations on the Site were started in 1969. Areas were reserved for a

    Jan 1, 1979