Search Documents

  • IMPC
    Flotability of Free Gold at Kemess

    By Daniela Venter, Stephen Chryssoulis, Ken Stowe

    "A sampling campaign was conducted at Kemess in order to identify and assess the chemical and physical factors, which control free gold flotation kinetics in the rougher and cleaner circuits. The rati

    Jan 1, 2003

  • IMPC
    Acidic Medium Flotation Separation of Chromite from Olivine and Serpentine (ABSTRACT PAGE)

    By G. Demi, G. Belardi, N. Shehu, S. Cico

    The physico-chemical interaction between minerals such as olivine, chromite and serpentine and the ions most commonly present in solution, like Ca and Mg and flotation reagents such as EDTA and oleic

    Jan 1, 2003

  • AIME
    Capillarity – Permeability - Capillary Desaturation in Unconsolidated Beads

    By John C. Calhoun, Frank T. Bethel

    The application of a method for analyzing pressure build-up curves to determine the effective permeability in the Spraberry is presented. Sixteen upper Spraberry wells of the Driver area arc analyzed

    Jan 1, 1953

  • AUSIMM
    How Are We Going to Produce Our Future Resource Professionals?

    The closure of the only professional mining school in New Zealand will mean that the minerals industry will have to explore other options to fill their mining professional positions. Globally mining i

    Jan 1, 1997

  • SAIMM
    Information As An Alternative To Mineral Rights Taxation

    A new system for granting access to mineral rights is proposed in the recently released White Paper, ?A Minerals and Mining Policy for South Africa?. Official policy states that ?Government?s long-ter

    Jan 1, 1999

  • SAIMM
    A new evaluation method of JRC and its size effect

    By T. Saito, S. Murata

    An original concept of JRC-diagram that can evaluate JRC and its size-effect by using a fractal model was proposed. In order to confirm the applicability of the JRC-diagram, first, JRC of the tensile

    Jan 1, 2003

  • SME-ICGCM
    The Influence of Rock Mass Quality in Controlled Blasting (87c67f30-2368-4c33-b1ba-1ff98b35a5ef)

    By Paul Singh

    Blasting is an integral part of mining activity and is an inherently destructive process. The quality of the rock mass in which an excavation is being driven has a strong influence on the level of dyn

    Jan 1, 2007

  • NIOSH
    OFR-17(2)-77 Conceptual Design Of An Automated Longwall Mining System - Phase II - State Of The Art Survey

    To develop a conceptual design for an automated longwall mining system, one should know what has been done, what is being done today and what is being planned for tomorrow. The bibliography referenced

    Jan 1, 1975

  • AIME
    Meetings of the Institute (3c77d317-50eb-430f-86dc-aac670f7405a)

    LIST OF THE MEETINGS OF THE INSTITUTE AND THEIR LOCALITIES FROM ITS ORGANIZATION Transactions Number Place Date Vol Page 1 Wilkes-Barre, Pa May, ?71 1 3 2 Bethlehem, Pa August, ?71 1 10 3 Troy,

    Jan 1, 1923

  • TMS
    Operation And Improvements On Peirce-Smith Converters At The Tamano Smelter

    By S. Tanaka

    The Tamano Smelter of Hibi Kyodo Smelting Co. Ltd. was commissioned in 1972. Since start up, the anode production capacity has increased from 101,000 tpy to 290,000 tpy, as a result of the applicatio

    Jan 1, 2005

  • ISEE
    Evolution of Single Shot Drawbell Blasting at New Afton Mine

    By Mike Lovitt

    New Gold Inc. had commissioned Orica to assist with the design of the drawbell blasting at New Afton Underground copper/gold block cave at Kamloops, British Columbia, Canada. Orica have had much succe

    Jan 1, 2013

  • AUSIMM
    Kinetic Behaviour of Solid/Solid Separation of Ultrafine Particles in Aqueous Suspension

    Kinetic Behaviour of Solid/Solid Separation of Ultrafine Particles in Aqueous Suspension

    Sep 13, 2010

  • SAIMM
    Second Reply To R. Altindag ?Brittleness And Drillability? - In The Journal Of SAIMM, Vol 103. No. 8. Pp. 525

    By H. G. Denkhaus

    Please allow me the temerity to reply to your reply to my contribution as follows: A fracture is brittle if plastic deformation is absent or, conversely a fracture is ductile if plastic deformation

    Jan 1, 2003

  • SME
    Passive Mine Blast Attenuators Constructed Of Rock Rubble For Protecting Ventilation Seals - Preprint 09-057

    By M. J. Sapko

    The design requirements for mine ventilation seals have undergone a radical transformation in recent years, and these revisions have greatly increased the cost of the seal designs and their constructi

    Jan 1, 2009

  • AIME
    Meetings of the Institute (bc3e049d-678b-48f0-b02e-f4c2c3637b9b)

    LIST OF THE MEETINGS OF THE INSTITUTE AND THEIR LOCALITIES FROM ITS ORGANIZATION Transactions Number Place Date Vol Page 1 Wilkes-Barre, Pa May, ?71 1 3 2 Bethlehem, Pa August, ?71 1 10 3 Troy,

    Jan 1, 1923

  • AUSIMM
    A Case Study in Optimising Fragmentation

    By R Crookes

    Mine to Mill optimisation is not a recently developed concept. It is one which is finally gaining greater acceptance in the Australian Mining Industry, possibly as a consequence of the downturn in mar

    Jan 1, 2000

  • ISEE
    Desensitization and Malfunction of Cap-Sensitive Explosives and Delay Detonators

    By Michael S. Wieland

    Charge malfunction problems result from rather universal damage mechanisms and are widespread throughout surface and underground delay blasting. Recent refinements in instrumentation technology reveal

    Jan 1, 1994

  • SME
    Minerals Planning Policies in Europe

    By S. Solar, G. Tiess, K. Nielsen, H. Wagner

    The paper summarises the results of a recent study of minerals planning policies of the Member States of the EU. The study has shown that contrary to the public opinion the production of industrial mi

    Jan 1, 2005

  • SME
    Optimizing Rebar Resin Annulus

    By P. Todd, K. Dever, P. S. Mills, A. A. Campoli

    Resin bolt performance is dependent on the size of the resin annulus, the difference between the hole and bolt radii. The vast majority of the millions of resin roof bolts installed each year in the

    Jan 1, 2000

  • CIM
    CANMET-MMSL Alternative Binder Technology

    By Kristie Tarr

    Portland cement is primarily used to solidify backfill in underground mine workings and it represents a major cost in mining operations. CANMET-MMSL has invented an alternative binder technology that

    Oct 1, 2010