Search Documents

  • SAIMM
    Environmental Assessment Of Base Metal Processing: A Nickel Refining Case Study

    By P. Forbes

    Mining and metallurgical processing companies that have adopted the principles of good environmental management often find it difficult to carry out an environmental assessment that yields meaningful

    Jan 1, 2000

  • IMPC
    Microorganisms in Flotation and Flocculation of Minerals ? An Overview

    By A. Vilinska

    Microorganisms have a tremendous influence on their environment through the transfer of energy, charge, and materials across a complex biotic mineral-solution interface. Recent developments in biotech

    Jan 1, 2014

  • AUSIMM
    Influence of Shot Design Parameters on Fragmetation

    By Smith N. S, Rholl S. A, Otterness R. E

    The Bureau of Mines is conducting research to develop blast designs for the control of fragmentation and rock displacement and the reduction of overall mining costs. This Bureau experiment, a progra

    Jan 1, 1990

  • NIOSH
    RI 8347 Titania From Intermediates Prepared by Soda-Smelting Ilmenite

    By A. E. Raddatz

    The Federal Bureau of Mines, as part of its goal to minimize undesirable environmental impacts associated with mineral processing, has investigated a soda-smelting technique for processing ilmenite in

    Jan 1, 1979

  • SME
    Non-destructive Approach for Shotcrete Lining Strength Monitoring

    By Vishwajeet Ahuja, Benoit Jones

    "INTRODUCTION Shotcrete lining forms an integral part of conventional tunneling and is widely applied for underground excavations. Early strength gain of the shotcrete is a crucial aspect for ground s

    Jan 1, 2016

  • CIM
    Back Caving Mechanism and Preventive Measures for Deep Open Stopes ? Case Studies

    By Jerry Ran

    Stope back caving in a mine using open stope mining interrupts the planned mining sequence and causes oversize muck and dilution with adverse economic implications. As many underground mines are minin

    May 1, 2004

  • NIOSH
    OFR-122(1)-80 Alumina Process Feasibility Study And Preliminary Pilot Plant Design - Task 3 Report: Preliminary Design Of 25 Ton Per Day Pilot Plant - Volume I - Process Technology And Costs

    By K. B. Bengtson

    This task report provides the process technology, preliminary design, capital and operating costs for a 25 TPD pilot plant to produce cell-grade alumina using a clay/hydrochloric acid extraction - HCI

    Jan 1, 1979

  • SME
    Review of Organic Binders for Iron Ore Concentrate Agglomeration

    By S. K. Kawatra, J. A. Halt

    "Low-grade iron ores are finely ground and processed to recover iron-bearing minerals. However, the iron-rich powder is too fine to be used directly in blast furnaces and most direct reduction furnace

    Jan 1, 2015

  • NIOSH
    Fourth-Quarter 1988 National Economic Activity And First-Quarter 1989 Outlook - Fourth-Quarter 1988

    By Joan Weinberg

    Real gross national produce (GNP) grew at a seasonally adjusted annual rate of 2.0% in the fourth quarter (table 1). The restrained quarterly growth rate was the slowest in 2 years, and was substantia

    Jan 1, 1989

  • CIM
    Developing Breakthrough Solutions to Complex Metallurgical Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate process plants requiring high throughputs presents unique metallurgical environmental and sustainability challenges that ne

    Jan 1, 2015

  • CIM
    Introduction -Papers on Cemented Backfill

    By J. R. Emery, D. F. Coates

    "FOUR PAPERS ON CEMENTED BACKFILL were given at the Annual General Meeting of The Canadian Institute of Mining and Metallurgy in 1970:Weaver, W. S., and Luka, R., ""Laboratory Studies of Cement-Stabil

    Jan 1, 1970

  • NIOSH
    RI 8350 Corrosion Studies in Brines of the Salton Sea Geothermal Field

    Toward the goal of maximizing minerals and metals recovery from domestic resources, the Bureau of Mines, U.S. Department of the Interior, has conducted in situ corrosion studies at the Salton Sea Know

    Jan 1, 1979

  • NIOSH
    OFR-91-76 Design, Fabrication, And Testing Of A System To Demonstrate The Effectiveness Of Respirable Dust Control On Longwall Shearers By The Use Of Water Piped Through The Shearer Drum ? I. Introduction

    This report is in fulfillment of Contract H0230031 awarded to Bituminous Coal Research, Inc., on May 23, 1973. The scope of work to be performed under this contract was divided into four phases: Phase

    Jan 1, 1976

  • SME
    Rock Mechanics Of The Davis Detector Cavern ? Introduction

    By W. G. Pariseau

    This contribution describes rock mechanics features of the Davis Cavern at the former Homestake Mine in Lead, South Dakota, U.S.A. The mine is located in the northern Black Hills of South Dakota. In

    Jan 1, 2012

  • DFI
    Use Of The Observational Method (Best Way Out) To Allow Driven Pile Installation In Chalk - Introduction:

    By Paul Morrison

    The paper describes the design process, trial testing and contract pile installation of 772 pre­cast concrete piles at a site in Surrey, South East England. Recommendations on how to improve the desig

    Jan 1, 2000

  • SME
    Old Mines ? New Regulations: The re-opening of the Gordonsville, Elmwood, and Cumberland Mines under new DPM regulations

    By A. Adu-Acheampong

    The Mid-Tennessee Zinc (MTZ) mines, comprised of the Gordonsville, Elmwood, and Cumberland sites, last operated 4 years ago and are undergoing rehabilitation to begin production in 2008. The mines uti

    Jan 1, 2009

  • IMPC
    Process And Productivity Improvement Of An Iron Ore Washing Plant By Column Flotation

    By T. V. Vijaya Kumar

    Most of the iron ore washing plants set up in India consist of sizing of the ore by dry / wet screening, washing and classification by screw classifiers followed by multi-stage hydrocycloning of screw

    Sep 1, 2012

  • DFI
    Geotechnical Investigation For Fashion Island Boulevard Bridge Earthquake Repair State Bridge No. 35C-160 San Mateo, California

    By Lawrence P. Goldfarb

    This paper presents the results of the geotechnical investigation for the repair of the Fashion Island Boulevard Bridge, Bridge No. 350160, in San Mateo, California. The concrete, precast girder bridg

    Jan 1, 1993

  • NIOSH
    RI 8759 Alumina Miniplant Operations - Overall Mass Balance for Clay-HCI Acid Leaching

    By Dwight L. Sawyer

    To provide technology that can help decrease the dependence of the U.S. aluminum industry on imported bauxite, the main ore of aluminum, the Bureau of Mines is investigating the extraction of aluminum

    Jan 1, 1983

  • SME
    Tailings Dam Performance From USCOLD Incident Survey Data (3f33a05f-8713-4bcd-8e50-5c9208622bdd)

    By C. Strachan

    This paper presents an evaluation of tailings dam incidents from the 1994 USCOLD Tailings Dam Committee report. Comparisons are also made with water storage dam incidents from USCOLD reports and rece

    Jan 1, 1999