Search Documents

  • AUSIMM
    Calculation of Metal, Coke and Gas Temperature Distributions in the Cupola Furnace

    Calculations of the temperatures of metal, coke, and gas at any level in the cupola furn~ce can be carried out by means of heat balances, using data obtained from experiments with an 18 in. experiment

    Jan 1, 1963

  • AIME
    Who's Who in Mineral Engineering - The 1979 Directory of the Society of Mining Engineers of AIME

    Who's Who in Mineral Engineering - The 1979 Directory of the Society of Mining Engineers of AIME

    Jan 7, 1979

  • AUSIMM
    Removing the Overburden? Proposals to Amend the Resource Management Act 1991

    By M Cooper

    Since its enactment in 1991, the Resource Management Act (RMA) has generated both praise and criticism. The major criticism is in relation to the costs the Act poses to industry and the time it takes

    Jan 1, 1998

  • DFI
    Hybrid Design Approach for Anchored Retaining Walls in Complex Geology

    By Christopher J. Ramsey, Don W. Dotson

    "An existing four lane section of US 27 was widened to eight lanes. The project lies in the rugged Valley and Ridge Province of the Appalachian mountains starting at the Tennessee River in Chattanooga

    Jan 1, 2015

  • SAIMM
    Managing The Geotechnical And Mining Issues Surrounding The Extraction Of Small Pillars At Shallow Depths At Xstrata Coal South Africa ? Synopsis

    By S. Z. Pethö

    Pillar extraction at shallow depths with small pillars that were not originally intended for secondary extraction can provide a huge benefit to the coal mining industry in those areas where a signific

    Jan 1, 2012

  • DFI
    Installation Parameters, Pile Performance and Importance of Testing

    By Maurice Bottiau

    "Abstract When addressing the performance of deep foundations, many parameters play a role, from adequate soil investigation to performance monitoring and testing. The correct understanding of pile co

    Jan 1, 2014

  • AUSIMM
    Diamond Drill, Calyx and Hand Boring by the Victorian Mines Department

    Very few of those occupied in pursuits other than mining have any conception of the extent of boring operations that have been carried out on the gold and coal fields of Victoria, or of the valuable a

    Jan 1, 1901

  • SME-ICGCM
    Global Trends in Coal Mine Horizontal Stress Measurements

    By Christopher Mark

    Knowledge of in situ stresses is fundamental to many studies in earth sciences, and coal mine ground control is no exception. During the past 20 years, it has become clear that horizontal stress is

    Jan 1, 2008

  • ISEE
    Thermodynamic Work Principal Overture — Not Just Rock n’Roll

    By Michael Wieland

    The resolving capacity of the thermodynamic work-principal model has been seriously refined over its twelve year history, so a review of the innovations, wrong turns and their rectification is warrant

    Jan 1, 2009

  • SME-ICGCM
    State-Of-The-Art Room-And-Pillar Retreat Mining In The Kittanning Coalbed (6805422e-8080-42ac-9a3a-30ed4eeda62f)

    By Alan A. Campoli

    The U.S Bureau of Mines is conducting research to develop improved guidelines for selecting the type and pattern of roof support in different geologic environments (Mucho, et al., 1995). As a part of

    Jan 1, 1996

  • SAIMM
    PlanIt–OPTIM: An optimal mine planning system for large underground mining corporations

    By F. Terblanche, M. Holton, A. Kruger

    The paper presents an optimal mine planning system designed to simultaneously optimize all the underground mines of large South African gold and platinum mining corporations. The system, code name

    Jan 1, 2003

  • SME
    An Algorithm For Analyticalsolutions And Analysis Of Mineral Processing Circuits

    By A. Noble

    Traditional simulations of mineral processing circuits are solved by straightforward numerical techniques which require iteration to accommodate recirculating loads. Depending on the complexity of the

    Jan 1, 2012

  • NIOSH
    OFR-71-75 Wedge Longwall Cutterhead Development - Phase I ? Executive Summary

    Longwall minim; is a highly mechanized, high productivity mining method that is finding increasing applications in coal. Although the method would be highly advantageous in certain hard rock mining ap

    Jan 1, 1974

  • DFI
    Vertical Earth Reinforcement Technique - Test Wall 1998 DFI Annual Conference And Meeting

    By Peter J. Nicholson

    A new method of constructing retaining walls, in-situ, prior to excavation has been developed. This "Vertical Earth Reinforcement Technique" VERT, has been demonstrated at a full scale test wall at th

    Jan 1, 1998

  • SME
    Geotechnical Considerations No. 7 Subway Line Extension Project in New York City

    By P. K. Das, S. K. Singh, C. C. Chang, E. C. Wang, R. B. Roberts

    As part of the New York City’s redevelopment of the far west side of mid-town Manhattan, this project will add 1.5 miles of twin bored tunnel to No. 7 Subway Line. The proposed alignment extending fro

    Jan 1, 2005

  • SME
    Mineralogical Overview Of The Behavior Of Gold In Conventional Copper Electrorefinery Anode Slimes Processing Circuits

    By T. T. Chen

    The behavior of gold in a conventional copper electrorefinery anode slimes treatment process is expounded on in this study. In the raw anode slimes generated in a copper electrorefinery, gold occurs m

    Jan 1, 2008

  • AUSIMM
    The Prevention of Silicosis by Metallic Aluminum

    By Robson W. D, Irwin D. A

    In November, 1932, an investigation of silicosis was undertaken at the, McIntyre Porcupine Mine, Schumacher, Ont., atfer a discussion of the problem with Sir Frederick Banting and his, staff. As a res

    Jan 1, 1945

  • SAIMM
    Fundamental Analysis Of The Interaction Between Overburden Behaviour And Snook Stability In Coalmines

    By J. N. Van der Merwe

    In the process of pillar extraction, pillars are seldom if ever extracted completely. The pillar remnants, or snooks, play an important role in the extraction process. At the working face, they need t

    Jan 1, 2005

  • DFI
    Instrumented Driven Steel Tube Piles At Canary Wharf, London

    By A. R. Gaba

    Phase I of the Canary Wharf development in London's docklands involves the construction of six fifteen storey buildings located predominantly over water of the West India Docks. The buildings are

    Jan 1, 1989

  • NIOSH
    OFR-118-77 Development Of A Radiochemical Method For Analyzing Radon Gas In Uranium Mine Atmospheres

    By L. Stein

    A simplified radiochemical method has been developed for quantitatively analyzing; radon gas in underground uranium mines. In this method, a measured volume of air is drawn by a pump through a drying

    Jan 1, 1977