Search Documents

  • NIOSH
    OFR-29-72 Exploration Of Illumination Concepts For Underground Coal Mines

    By Rupert O. Yantz

    This report, authorized under contract Number H0111403 Amendment Number One, entitled, "Exploration of Illumination Concepts for Underground Coal Mines", contains the results of an investigation of me

    Jan 1, 1972

  • NIOSH
    OFR-28(1)-76 Survey Of Underground Hydraulic Coal Mining Technology - Volume 1 - Phase II Report ? Summary

    By William C. Cooley

    This report includes a review of all relevant data on underground hydraulic coal mining technology collected during Phases I and II of the contract. Data collection and analysis procedures are discuss

    Jan 1, 1975

  • ISEE
    Shaft Sinking: Drill and Blast & Vertical Shaft Sinking Machines

    By Sam Ammermann, William Heasley

    "The mining industry is on an ever accelerating path to complete mechanization. As companiesutilize more sophisticated and efficient methods of blasting, a more thorough look should begiven to the pro

    Jan 1, 2016

  • AUSIMM
    Validation Test of Ground Control for a Vertical Rise

    Entry of personnel under a vertical raise bored hole is not standard practice in Australia. Where access is required below a rise, mining operations must be confident that they understand the capacity

    Nov 25, 2010

  • DFI
    Installation Of Augered Cast-In-Place Piles - Equipment (f7778f75-6023-4133-8cd3-e733645bdcdf)

    ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane

    Jan 1, 1997

  • NIOSH
    OFR-60-73 Plastic Liners Extended With Sand And Other Fillers For Use In Coal Mines ? 1. Introduction

    By J. L. Schwendeman

    This is the final report of work done under contract H0210060 for the U. S. Department of the Interior, Bureau of Mines. This program was to show the feasibility of using plastic liners containing san

    Jan 1, 1972

  • IOM3
    Comparative analysis of toppling behaviour at Chuquicamata open-pit mine, Chile

    By P. Varona, L. Lorig, M. Board, E. Chacon

    Geomechanical factors at the mine are important and will become even more relevant as the pit expands and deepens. To address these demands a team was assembled to collect geomechanical information an

    Apr 1, 1996

  • AUSIMM
    The-Application of Optimal Control to Open-Pit Planning

    Preliminary work being undertaken on the optimisation of decision strategies for an open-pit metalliferous deposit is presented. The Optimal Control method has been selected rather than the easier to

    Jan 1, 1984

  • NIOSH
    Rock Mass Classification In German Hard-Coal Mining: Standards And Application

    By Nikolaos Polysos, Holger Witthaus

    INTRODUCTION The classification system for German coal mining is the result of approximately 100 years of experience in roadway development and longwall mining. It is also based on different resear

    Jan 5, 2007

  • SAIMM
    A Comparison Of The Reheat Cracking Susceptibility Of A Service Exposed High Temperature Alloy Steel With That Of New Material

    By R. Loots

    High temperature creep resistant alloys are used in power plants as steam pipes and headers where they have to withstand super heated steam temperatures of up to 600ºC for the lifetime of the plant. F

    Jan 1, 2004

  • CIM
    New technology for hoist conveyance monitoring and analysis (ce4cfab2-0d27-4d96-82b0-9facfbf66b01)

    By M. J. Beus

    Many mines in Canada, the United States and South Africa are reaching the hoisting limit. Very little payload will be possible without compromising safety due to the excessive weight. It has been sugg

    Jan 1, 2002

  • SME-ICGCM
    The Extraction of Main Heading Pillars with a Longwall at Nre Wongawilli Colliery

    By Ry Stone

    To maintain longwall continuity, NRE Wongawilli Colliery extracted the approximately 20-year-old Thompson Mains and in doing so, 20 roadways were holed into during longwall retreat. The orientation of

    Jan 1, 2012

  • NIOSH
    RI 3440 Reclamation Of Stripped Coal Land (562de5e2-d1ec-435f-b520-6a08692e4239)

    By Albert L. Toenges

    A phase in strip mining of bituminous coal is the overturning of the surface of the land. The purpose of this report is to acquaint the operators and others interested in stripping with the work that

    Jan 1, 1939

  • NIOSH
    OFR-5-73 A Numerical Model For The Study Of Particle Interactions In Relation To Hydraulic Transport ? I. Introduction

    By Andrew K. C. Wong

    Hydraulic transport has been considered as one of the most economical methods in transferring granular materials over relatively long distances. In the natural world, it is used to transport basic mat

    Jan 1, 1972

  • NIOSH
    RI 7045 Talc And Asbestos At Dadeville, Ala.

    By Thornton L. Neathery

    Geologic investigation of a mineralized zone in eastern Alabama indicates that large quantities of talc and soapstone are scattered over a wide area close to the surface. Laboratory experiments show t

    Jan 1, 1967

  • NIOSH
    OFR-11-79 Exploratory Studies Of Flame And Explosion Quenching

    By R. A. Strehlow

    This is the final report for U.S. Bureau of Mines contract HO-122122, which was in effect from June 30, 1972 through January 4, 1976. The work resulted in the design and construction of a large labora

    Jan 1, 1977

  • NIOSH
    OFR-199-83 Determination Of Velocity Measurement Correction Factors And Guidelines

    The investigation summarized in this report addressed two primary issues: the determination and use of correction factors, and the development of guidelines for velocity measurement site selection. Ot

    Jan 1, 1983

  • SME
    Profitable copper production from low-grade waste ores (9ed38e1e-baf5-48ca-b79e-12daf9fc8dca)

    By P. I. James, M. R. Baker

    Este artículo analiza la nueva producción de cobre a partir de "minerales de desecho" de baja ley usando la tecnología de Blue Planet Strategies DEMET™ (Dynamic Electrode Mining Effluent Treatment, po

    Jan 1, 2014

  • IOM3
    Discount rates and risk assessment in mineral project evaluations; Risk assessment in reserve estimation and open-pit planning; Inclusion of risk assessment in open-pit design and scheduling: contributed remarks

    By H. K. Taylor, B. Denby, L. D. Smith

    Contributions by H.K. Taylor and G.A. Davis discuss the three papers published in Transactions IMM A, vols. 103 and 104, with responses by Smith and Dowd

    Dec 1, 1995

  • CIM
    Manufacturing Processes Modelling and the Business of 21st Century Manufacturing

    By N. L. Richards

    In manufacturing for the 21st century, the first company to market often leads the pack in product development and sales. In this respect, manufacturing processes play an important role in transformin

    Jan 1, 2010