Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Wall Reinforcement in Open Pit Mining

    Stressed steel cables, similar to those used in pre-stressed concrete, have been used for rock mass reinforcement, in civil engineering, for many years. This type of reinforcement has been attempt

    Jan 1, 1986

  • AUSIMM
    Characterizing Multiple Operating Points in Mine Ventilation Systems

    By Mutmansky J. M, Hartman H. L

    Multiple operating points for mine fans are a problem that fan and mining engineers must constantly be aware of in mine/fan systems. In a single-fan system, unstable conditions can be avoided by r

    Jan 1, 1988

  • AUSIMM
    CO<sub>2</sub> Geosequestration ù The Challenges of Capturing and Storing CO<sub>2</sub> From the Process Industries

    By B Hooper

    Deep cuts in CO2 emissions will be required to stabilise and, in the long term, decrease CO2 concentrations in the atmosphere. Technologies for capturing CO2 from major stationary sources (power stati

    Jan 1, 2004

  • AUSIMM
    Criteria for the Engineering and Construction by TBM of a Tunnel Under the Torre Annunziata (Italy) Built Up Area

    By Turco E, Pelizza S, Vona A

    Within the project against pollution in the Gulf of Naples (Italy) it was envisaged to build a sewage collection tunnel whose tunnelling section is about 30 m2 and whose length is over 4 km. The fo

    Jan 1, 1987

  • AUSIMM
    Bubble Flow Pattern Detection in the Water Model of a Metal Treatment Unit.

    By Zhao JC, Chen JJJ

    A water/air model was developed to simulate the refining of molten aluminium by the sparging of gas through an impeller. The optimal gas dispersion depends upon selecting the correct gas rate for a g

    Jan 1, 1995

  • AUSIMM
    EastLink Tunnel - Permanent Concrete Lining and Waterproofing Design

    By E Taylor, F Lebbing

    The $2.5 billion EastLink project is a 39 km tollway and includes twin three-lane, 1.5 km long, undrained driven tunnels with cross passages every 120 m. The hard rock tunnels are being built to avoid

    Jan 1, 2008

  • AUSIMM
    Two Approaches to Truck and Shovel Mining at Leigh Creek

    By Swift D. G

    For some time the Electricity Trust of South Australia (ETSA) has been investigating the application of new mining methods and equipment to minimise the cost impact of the steadily increasing depth

    Jan 1, 1989

  • AUSIMM
    The Peak Hill High Sulphidation Gold Deposit, NSW (b7de7a3e-9b00-482f-8de6-d6281ddb9569)

    By Corbett GJ, Leach TM

    ABSTRAC&apos;T&apos; Although hosted within an Ordovician magmatic arc, the Peak Hill high sulphidation system displays features typical of younger Pacific Rim high sulphidation epithermal gold depos

    Jan 1, 1995

  • AUSIMM
    A Mineralogical Approach to Auriferous Arsenopyrite

    By Graham J

    The successful processing of arsenopyritic ores is difficult and will be facilitated by a better understanding of the mineralogy of gold within arsenopyrite and the type of arsenopyrite in which gol

    Jan 1, 1992

  • AUSIMM
    Water Management in the Fitzroy Basin ù Issues for the Mining Sector

    By E P. Donohue

    Changes to water industry practice are required as a consequence of the Council of Australian Governments water reform agenda which binds all states and territories to a range of measures intended to

    Jan 1, 2003

  • AUSIMM
    Specific Gravity and its Relationship to Chemical Composition in Iron Ore

    By Reid T. W

    This paper describes the results of investigations into the relationship between specific gravity and chemical composition in the Cockatoo Island orebody, In the early investigations the samples w

    Jan 1, 1976

  • AUSIMM
    Cobaltite in the Broken Hill Lode (03939c9c-b588-4802-a8a6-05e63bc11f8d)

    The detailed work done by Stillwell and Edwards on the occurrence of cobaltite and safilorite-Iollingite at the South Mine, followed by its presentation as a paper to the Institute, calls for, a few n

    Jan 1, 1944

  • AUSIMM
    The Recovery of Copper from Lead Blast Furnace Bullion

    Copper entering a lead ,smelter in concentrate or from other sources is recoVered as matte and speiss which contain appreciable quantities of lead. The matte and speiss are usually sold to copper smel

    Jan 1, 1951

  • AUSIMM
    Use of Pre-injection and Spiling in Front of Hard Rock TBM Excavation

    Hard rock TBMs are very often open machine layouts, with just a part roof shield over the front of the machine. The whole system is designed for fast face advance and the economy of the project often

    Jan 1, 1999

  • AUSIMM
    The Continuing Evolution of Gas Drainage in Australia

    By E Yurakov, D J. Ashelford, M I. Slate

    The push for increasing coal production rates continues to place increasing demands on mine management to safely and effectively control seam gas. Gas drainage strategies applied vary in both effectiv

    Jan 1, 2005

  • AUSIMM
    An electrochemical and spectroscopic study of the leaching mechanisms of enargite and chalcopyrite in sulfuric acid

    By Y L. Ma, M Chen, W Bruckard

    With the extensive exploitation and gradual depletion of high-grade copper reserves, the mining industry is paying more and more attention to the hydrometallurgical extraction of copper from lowgrade

    Aug 24, 2022

  • AUSIMM
    Mining at Depth - the Major Issues

    By Lloyd F, Arnold D. A, Hagan T. O

    This paper investigates the problems that are encountered in mining at extreme depths. It looks into the rock mechanic aspects, especially the high stress levels that will occur, and the hazard of

    Jan 1, 1986

  • AUSIMM
    Long-Hole Drilling for Gas Emission Control at Appin Colliery NSW, Australia

    By Saghafi A, Kelly M, Williams R. J

    A two year program of research into the feasibility of long-hole drilling for improved gas emission control has been undertaken at Appin Colliery. State of the art equipment was employed involving

    Jan 1, 1988

  • AUSIMM
    Cut-and-Break, a 'New' Method of Rock Excavation

    By Seib W

    In cut-and-break rock excavation use is made of the fact that breaking rock in tension towards a free face requires a specific energy of excavation which is small in comparison with that required for

    Jan 1, 1992

  • AUSIMM
    Construction and Commissioning of the Lebong Tandai Gold Mine and Treatment Plant

    By West RF, Pooley RH

    An underground mine, a treatment plant and supporting facilities have been constructed at Lebong Tandai in Sumatra, Indonesia by PT Lusang Mining. Throughput is initially 50,000 tonnes per annum

    Jan 1, 1986