Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Computer Simulation of an Agitation Mill Abrasion Process for Waste Printed Circuit Boards

    By K. Torigoe, S. Owad, C. Tokoro, Y Tsunazawa

    The mechanism of an abrasion process to recover metal values by removing components from printed circuit boards (PCBs) is modeled using a discrete element method (DEM) simulation. To simulate the abra

    Jan 1, 2011

  • CIM
    Green Mining Initiative Mines Vertes

    By Louise Laverdure

    Outline ?Background ?Issues and considerations ?Why do we need to innovate ?Green Mining Initiative ?Footprint reduction ?Innovation in waste management ?Ecosystem risk management ?Mine clo

    May 1, 2011

  • CIM
    The Implementation of Machine Guidance Technology at Highland Valley Copper

    By D. Mark Richards

    Highland Valley Copper is a large open pit copper mine in the southern interior of British Columbia. Machine guidance technology using the Global Positioning System (GPS), was first implemented at the

    May 1, 2001

  • CIM
    Copper Production Trends and Developments a Review of Industry Trends Over the Past Decade

    By A. E. M. Warner, A. Vahed, P. J. Mackey

    In the decade 2002 to 2012 some 6.7 million tonnes of new copper concentrate production capacity was brought on line, corresponding to 2 million tonnes of contained copper. This increase in concentrat

    Jan 1, 2014

  • CIM
    Development Trend of Underground Rock Support

    By C. C. Li

    Traditionally, strong and stiff devices, such as fully encapsulated rebar bolts and concrete lining and arches, are preferred for underground rock support. The attention is paid to the strength of the

    Jan 1, 2015

  • CIM
    Early Evaluation of Ground Conditions Ahead of Tunnel Face by Inclination Monitoring During Excavation

    By K. Sakai, M. Miyaue, T. Aoki, T. Tani, S. Tanaka, N. Kudo

    In the planning stage of a tunnel, due to limited technology in the geological survey and the financial restriction, tunnel supports are often designed from unsatisfactory information, and the tunnel

    Jan 1, 2015

  • CIM
    Good International Practices Made Better IFC Raises the Bar on Environmental Health & Safety for the Mining Sector

    By Audrey Wagenaar

    Introduction ?? Rising public pressures are being placed on companies worldwide to protect the environment and the health and safety of their workers and local communities. ?? International bodies

    May 1, 2008

  • CIM
    The 425 Project - Dealing with SO2

    By Éric Côté

    Introduction The 425 Main Ore Zone ? Block of ore partially mined in the late sixties; ? Area was sealed off for over 30 years due to SO2 emissions from oxidizing fill material; 425 Project goal

    Feb 1, 2008

  • CIM
    Checklist for economic evaluations of mineral projects

    By L. D. Smith

    "The economic evaluation of a mineral project requires a great deal of diverse information to be brought together in one place. The greatest concern is that there will be an error by omission, so it i

    Jan 1, 1994

  • CIM
    Sequential Acid Leaching of Nickel Laterites with Iron Precipitation

    By J. D. Gillaspie, D. T. White

    "Sulphuric acid atmospheric leaching of nickel saprolite / garnierite ores was proposed in the early twentieth century, prior to the development of the pressure acid leaching process for limonite ores

    Jan 1, 2016

  • CIM
    Cu-Ni-PGE Mineralization within the Copper Cliff Offset Dike, Copper Cliff North Mine, Sudbury, Ontario: Evidence for Multiple Stages of Emplacement

    By J. H. Rickard, D. H. Watkinson

    "Abstract - Detailed petrographic and quantitative (electron microprobe, SEM-EDS) mineralchemical analyses of sulfide ore from the 100 orebody at the Copper Cliff North mine, Copper Cliff, Ontario, re

    Jan 1, 2001

  • CIM
    Reliability of diesel powered load-haul-dump machines in an underground Quebec mine

    By J. F. Perreault, J. Paraszczak

    "The profitability of an underground mine depends to a great extent on the production cost.Random equipment failures and their consequences have significant influence on the total operating cost of a

    Jan 1, 1994

  • CIM
    Settling Properties of Copper Electrorefining Anode Slimes

    By T. Kalliomäki, A. T. Aji, M. Lundström, J. Aromaa

    The settling properties of anode slime in copper electrorefining have crucial effect on copper cathode quality. Anode slime settling is affected by electrolyte composition and temperature, electrolyte

    Jan 1, 2019

  • CIM
    Materials management at Brenda Mines Ltd.

    By G. Sperlins

    "IntroductionBrenda Mines Ltd. is a low-grade open-pit mining and milling operation located near Peachland, B.C. Brought into production in late 1969, the plant treats an average of 30,000 tons per da

    Jan 1, 1982

  • CIM
    CANMET - university programs in mining innovation

    By R. Sage, N. Rillette, M. D. Everell, G. Herget

    "CANMET has been operating as a Government Technology Centre for two years. Many of CANMET's programs involve long-term research and require special expertise, often available at Canadian univers

    Jan 1, 1990

  • CIM
    Bibliography of Canadian contributions in the field of rock mechanics

    By P. E. Weidmark

    "PART 1-Published PapersAllcott, G.A., and Archibald, D.E.; ""Description of pillar behaviour at Heath Steele Mines""; Can Min Metall Bull; 74:834:80-87; 1981.Baar, C.A.; Discussion of Theme 1: ""Phys

    Jan 1, 1982

  • CIM
    Tires, their importance and cost in the mine

    By Don McColman

    "Tires, although not always the largest single cost item in open-pit mining operations, will place in the top three, along with explosives and fuel. How this high-cost supply is controlled is dependen

    Jan 1, 1986

  • CIM
    Slon Magnetic Separator: A New Approach for Recovering and Concentrating Iron Ore Fines

    By Stephen B. Hearn

    The SLon Vertical Ring and Pulsating High Gradient Magnetic Separator was developed to overcome multiple disadvantages associated with traditional horizontal type Wet High Intensity Magnetic Separator

    May 1, 2007

  • CIM
    A Numerical Study of the Stresses In Backfilled Stopes Overlying a Sill Mat

    By M. A. Sobhi, L. Li

    With the continuous reduction of mineral resources at shallow depth, more and more mines have to go deeper beneath the earth's surface to reach the ore zones. This increase in mine depth leads to a na

    Jan 1, 2015

  • CIM
    Productivity improvements for dragline operations using controlled blasting in a single- and multiple-seam opencast coal operation at Rietspruit, South Africa

    By W. A. Crosby, W. K. Smith, K. L. McDonald

    "IntroductionThis paper describes how the introduction of two blasting techniques and the resuItant development of new dragline digging methods have increased the productivity of single- and double-se

    Jan 1, 1983