Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Leaching and Recovery of Copper during the Cyanidation of Copper Containing Gold Ores

    In the leaching and recovery of gold from copper containing gold ores using cyanidation, some copper minerals also dissolve which can have a detrimental effect on the process efficiency and economics.

    Jan 1, 2005

  • CIM
    A Method to Downscale Joint Surface Roughness and to Create Replica Series using 3D Printed Molds

    By A. Hartikainen, M. Rinne, F. Johansson, R. Yorke, L K. T. Uotinen, E. Korpi, J. Antikainen

    "In order to determine the in-situ shear strength of rock joints, large scale testing is required. However, this is both expensive and difficult to execute. One possible method to overcome this may be

    Jan 1, 2015

  • CIM
    The Equator Principles and Beyond

    By Tim Bekhuys

    Equator Principles ? Applies to projects > $10 million ? Voluntary agreement between 58+ EPFIs ? Categorized projects based on environmental risk, consequences ? Requirements for EA, EMP, use of s

    May 1, 2008

  • CIM
    Stir casting production of aluminium-silicon carbide particle composites: Importance of adequate mixing of particulates and melt

    By M. Bozorgtabar

    Metal Matrix Composites (MMC) have a ductile matrix containing ceramic particles, Due to their improved wear properties, Al?SiC composites have economical applications in many industrial uses where we

    Jan 1, 2005

  • CIM
    Bond Is Back!

    By Mark Sherman

    One of the main functions of a process technology and engineering services provider is to select grinding equipment that will meet the client?s throughput rate target. Prudent risk mitigation strategi

    Jan 1, 2012

  • CIM
    3D Inversion of Transient AMT Data

    Introduction ?MT involves the measurement of naturally occurring magnetic and electric field oscillations. ?The ratio of E/H (wave impedance) is measured as a function of frequency to give resistivi

    May 1, 2008

  • CIM
    Queen?s Drill to Mill

    By José Cáceres

    Mine To Mill? ? Carlisle(1954) ?The economic of a fund resource with particular reference to mining?. ? Steine(1978) ?Coarser grind may mean lower metal recovery but higher profit?. ? Metalica (199

    May 1, 2006

  • CIM
    Optimisation and Continuous Improvement of Antamina Comminution Circuit (f8192cd7-9bd8-4215-8434-d5a9df56e042)

    By Edward Rybinski, Serkan Dikmen, Walter Valery, Jorge Ghersi, Roberto Valle, Alex Jankovic, Javier Linares, Frank Davila

    Compañía Minera Antamina is a polymetallic mining complex that produces copper and zinc concentrates as primary products and molybdenum and lead/bismuth/silver concentrates as by-products. In 2007, Me

    Jan 1, 2012

  • CIM
    Review on Separation and Treatment of Thorium Resources

    By Zhigao Xu, Ruan Chi, Zhenyue Zhang, Yaoyang Ruan, Zhengyan He

    Thorium is frequently the main radioactive element in rare earth ores and is a resource that can potentially substitute for uranium. Thorium must be separated from rare earths in order to obtain produ

    Jan 1, 2014

  • CIM
    Mined Material Management Perspectives

    By Harvey McLeod

    M3 -Technology HOWEVER:In practice we have limitations ?Clients: aggressive or cost based; inexperienced ?Consultants: ?expanding market w/training limitations ?Prescriptive designs ?Lack of

    May 1, 2010

  • CIM
    Wet High Intensity Magnetic Separators at Sidbec-Normines

    By A. Lemay, G. Morin, C. Desmeules

    "Incorporated in 1976, Sidbec Normines was mandated to exploit a deposit of specular hematite at Fire Lake. A combined effort of three companies, Sidbec, which holds 50. 1 % of the actions, British St

    Jan 1, 1981

  • CIM
    Grinding Circuit Design for Similco Mines (c92aaacb-9754-4479-979f-50ce395c95a4)

    By Ken Major, Anita Marks, Craig Sams

    In 2007 Copper Mountain Mining determined that there were sufficient resources to consider reopening the Similco Mine near Princeton, BC. The mill facility that had been built by Newmont Mining in 197

    Jan 1, 2012

  • CIM
    What?s in a Goal? Strategies for Carbon Management in Mining

    ?Introduction to the Delphi Group ?Why is carbon important to your organization ?Key elements of a carbon management strategy ?Inventory ?Risk & opportunity scan ?Mitigation options and financial

    May 1, 2009

  • CIM
    Polynuclear aromatic hydrocarbons in Canadian underground mines

    By J. P. Mogan, E. D. Dainty

    Polynuclear aromatic hydrocarbon (PAH) levels were measured in underground mines in the vicinity of diesel vehicles equipped with several types of emission control hardware. In general, the emission c

    Jan 1, 1994

  • CIM
    Synthesis of Sulphur-Free Metallic Iron from Iron Oxide Using High-Sulphur Carbonaceous Materials as Reducing Agents

    By James Ransford Dankwah

    High sulphur carbonaceous materials like petroleum coke and rubber tyre are unsuitable as reductants in ironmaking because part of the sulphur is transferred to the reduced metal. Globally, while larg

    Jan 1, 2014

  • CIM
    Simply Empowering: Innovative Software Tools for the Miner

    By J. H. Curran

    Agenda ? Challenges of developed world mining ? Software aids for creative and practical engineering ? Rocscience software philosophy ? Rocscience suite of geomechanics programs ? Case study ? d

    Apr 1, 2005

  • CIM
    Substantiation of Coal Extraction Selective Technique Implementation in Flat Seams with Thickness of 0.5-0.8 M

    By A Smirnov

    The problem of thin and very thin coal seam extraction is examined in a long perspective of Ukraine?s fuel and energy industry development. The technical and economic benefits of the coal seam selecti

    Aug 1, 2013

  • CIM
    Estimation of Coal Quality Using Indicator Kriging Applied to Data Obtained By Borehole Geophysical Logging

    By Tiago Webber

    Mineral resources estimation comprises basically two stages: (i) data collection, analysis and validation, and (ii) the estimate of the grades and tones of the deposit. The most applied method for sam

    Oct 1, 2009

  • CIM
    Wear & Design Improvements in Discharge Cones for Large SAG/AG Mills (a95ef7ab-6071-475c-8b9c-363d74a295c8)

    By Craig Faulkner

    Discharge cones for large Semi Autogenous Grinding (SAG) and Autogenous Grinding (AG) mills are subjected to high wear as significant volumes of ground ore and slurry exit the mill. With the larger di

    Jan 1, 2012

  • CIM
    Recent electric furnace developments at Falconbridge (Sudbury Operations)

    By J. Chao, C. Tan, N. Stubina

    "Since J978, Falconbridge Limited has operated two electric furnaces at its nickel-copper smelter in Sudbury. As part of its S02 Abatement Program, the smelter has undergone many changes over the last

    Jan 1, 1994