Mexicana de Cobre smelter expansion projectBy J. M. Velazquez, J. H. Meza Viveros
This paper describes some of the parameters and technologies used at the Mexicana de Cobre smelter, and discusses the principal design parameters and new technologies that are being implemented in a s
Jan 1, 1999
-
Forecasters Beware ! Copper’s Present and FutureBy William J. McCutheon
This paper presents some personal observations obtained during the course of visits to Europe, Africa, Latin America and the United States to talk with senior decision-makers in the copper industry ab
Jan 1, 1986
-
Geotechnical Design Of Large Openings At DepthBy Evert Hoek
Two types of failure have to be considered in designing large openings: (a) Structurally controlled failure caused by discontinuity intersections, (b) Stress induced instability which occurs whe
Jan 1, 1981
-
Carbon Sampling in Gold CircuitsBy Tom Bruington
This paper discusses the accuracy of determining the quantities of gold and silver on activated carbon in various stages of process for typical precious metals flowsheets. Accurate plant performance e
Jan 1, 1991
-
Investigations Of Rock Mass Properties For The Foundation Of A Nuclear Power Plant At Forsmark, SwedenBy Håkan Stille, Kjeld Boye-Møller, Lars Lundström
BACKGROUND Forsmark Power Station is a nuclear power plant under construction at the Baltic abt 120 km north of Stockholm. Investigations on the Site were started in 1969. Areas were reserved for a
Jan 1, 1979
-
A Hydrothermal Bentonite - Sampling ProtocolBy Haydn H. Murray
A hydrothermal bentonite located in the high Sierras in Nevada is being mined and processed for use as a natural dietary supplement. Because hydrothermal clay deposits are normally zoned and not unifo
Jan 1, 2005
-
Pressure Oxidation Pretreatment of Refractory GoldBy D. Robert Weir, Roman M. G. S. Berezowsky
Pressure oxidation of gold containing concentrates and ores is an effective pre- treatment for liberating refractory gold. This is particularly true when an appreciable portion of the gold is associat
Jan 1, 1984
-
Tunnel Excavation At The Bad Creek ProjectBy Thomas H. Holley
This presentation will describe the underground excavation at the Bad Creek Pump Storage project. It consists of approximately 3,650 m of various size tunnels ranging from 4.2 m to 9.0 m finished diam
Jan 1, 1987
-
A Helical Inducer Hydrotransport System For Tunneling And Boring OperationsBy Leslie S. Rubin, John C. Roberge, Mackenzie Burnett
A self regulating helical inducer has been developed and tested for dry injection of coarse or fine solids into a hydraulic pipeline. This centrifugal pumping device has also been modified and tested
Jan 1, 1983
-
The KUJ 2000 Ventilation SystemBy Lennart Mukka
LKAB has been mining iron ore in northern Sweden for about 100 years and now enters the next century with a major new investment in Kiruna. The under- ground projects involve construction of a new mai
Jan 1, 1995
-
Meraaker Hydro-Tunneling the “Norwegian Way”By Odd G. Askilsrud, Steinar Johannessen
New powerplants, tunnels and dams are currently under construction at Meraaker to triple the annual power production of a nearly 100 year old power scheme. A total of 44 km tunnels with cross sections
Jan 1, 1993
-
Wanjiazhai Yellow River Diversion–Hard Rock TBM Challenging SoilBy Jihong Xue, Jialin Wang, Della Valle Nicola
Experience of Hard Rock TBM excavating soil in Wanjiazhai Yellow River Diversion Project tells us that selection of Hard Rock TBM to excavate soil in case that rock dominates overall length of tunnel,
Jan 1, 2003
-
Advances in Mill-Lining Technology (SME Annual Meeting, Feb. 14-17, 1994)By R. Svensson
Mill linings play an important role in all comminution processes with tumbling mills. The selection of the lining profile and the lining material has a great impact on overall grinding cost and mill t
Jan 1, 1995
-
Challenges in HydrometallurgyBy K. N. Han, M. C. Fuerstenau
Challenges in five major areas of hydrometallurgy are presented and discussed. These are: leaching low-grade oxide and sulfide ores; oxidative leaching of sulfide concentrates; processing refractory o
Jan 1, 1989
-
Study On The Separation Of Silicate Minerals From Quartz With Collector MixtureBy Zhengbin Cheng, Wenguang Lu, Baoqi Sun, Jiaying Tang
This paper studied the flotation separation of feldspar, zircon and kyanite from quartz with a mixture of cationic and anionic collectors. Tests show that collector mixture has specially good effec
Jan 1, 1995
-
Phelps Dodge Chino Smelter Effluent Metal RecoveryBy E. H. Partelpoeg, B. G. Belew
In 1990, the Chino Smelter completed the construction of a plant designed to recover metal values and water from smelter scrubber effluent. Equipment was installed to maximize effluent recycling and m
Jan 1, 1992
-
Construction Of Section E-ld Greenbelt Route Tunnels, Washington, DCBy Charles E. Mergentime, J. Marshall Dean
Mergentime/Loram's extension of the Washington, DC Metro Subway System includes construction of dual 1,770-foot tunnels in soft ground, a crossover structure, a fan structure and pumping station,
Jan 1, 1985
-
Progress in Computer Applications for Process Modeling, Simulation, and Control ? IntroductionBy H. R. Cooper
Refinements and increased sophistication in modeling and simulation, and introduction of advanced techniques in automatic control made feasible with digital processor handling of data, represent the m
Jan 1, 1989
-
Aggregate Reserves Planning & ValueBy A. Pincomb
After determining minable acreage, tons are calculated by multiplying minable acreage by average thickness and by a volume-tonnage conversion factor. Converting from tons in the ground to tons sold a
Jan 1, 2003
-
Large-Diameter Shaft Drilling: A Versatile Tool For Advanced MiningBy D. R. Zeni
Today's mine development requires the safe, expedient and economical construction of vertical shafts for both ventilation and access. This construction must be accomplished within diverse ground
Jan 1, 1996