Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME
    A Review Of Tunneling Difficulties In Carbonate Sedimentary Rocks

    By D. P. Richards

    Tunneling in carbonate sedimentary rocks such as lime stones and dolomites can be difficult when solution channels or voids are anticipated. Addressing the risk aspects associated with these formation

  • SME
    Selective Copper Recovery with HCl Leaching from Copper Oxalate Material Mining, Metallurgy and Exploration (d35b21fb-0dcb-4cd4-94b9-4575e3b19bb0)

    By Hasan Nizamoğlu, Z. Abidin Sarı, Aslıhan Demiraslan, M. Deniz Turan, Tolga Depci

    In this study, recovery of copper from solid material (obtained by leaching of chalcopyrite with oxalic acid in the presence of hydrogen peroxide) with a copper oxalate structure was carried out selec

  • SME
    Taconite Mining – Concerns and Challenges

    By William R. Yernberg

    The combined 75th Annual Minnesota Section of SME meeting and 63rd Annual University of Minnesota Mining Symposium was held April 9 and 10, 2002, in Duluth, MN. This year’s theme was “Keys to the Fut

    Jan 1, 2002

  • SME
    Drilled Shaft Construction At Crownpoint, New Mexico

    By Hassell E. Hunter

    The Wyoming Mineral-Conoco Crownpoint Project represents the first time that big hole drilling has been exclusively used to develop totally a privately financed mine below a depth of 1000 feet. Thr

    Jan 1, 1983

  • SME
    Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration - Springer

    By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer

    Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph

  • SME
    Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration

    By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer

    Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph

  • SME
    An Innovation Of Practical Underground Stope Design Optimization And Cut-Off Grade Calculation

    An incremental analysis based stope design optimization method was developed at Exodus, an underground project located 30 miles north of Carlin, Nevada. Traditional underground stope design methods, b

    Jan 1, 2012

  • SME
    Terrorism and the Mining Industry

    By A. Dale Wunderlich

    Since Sept. 11, 2001, the author has been asked by several mining companies and mining publications to share some of his insights on how the terrorist attacks on the World Trade Center (WTC) and Penta

    Jan 1, 2002

  • SME
    Transformation Mechanisms Of Self Reducing – Fluxing Dried Greenballs Into Pig Iron Nuggets

    By B. Anameric, S. Kawatra

    Pig iron nuggets, which have similar chemical and physical properties with blast furnace pig iron, were produced by a single step heat treatment of self reducing – fluxing dried greenballs. During thi

    Jan 1, 2007

  • SME
    History of the Getchell Gold Mine

    By Robert C. Horton

    The Getchell Mine is located on the east flank of the Osgood Mountain Range in the Potosi Mining District, Humboldt County, NV. Mining in the area first began in 1883 for copper, lead and silver in s

    Jan 1, 1999

  • SME
    A Mathematical Programming Model For Open Pit Short-Term Production Scheduling

    In this paper, a mixed integer linear programming (MILP) model for the short-term scheduling of open pit mines is formulated. The proposed model aims at sequencing the blocks extraction over multiple

    Jan 1, 2011

  • SME
    The Effectiveness Of Task-Based Noise-Exposure Assessment Methods For Monitoring Miner Noise Hazards

    By C. Bise, A. Seal

    Excessive noise has long been a hazard in the coal-mining industry. Studies conducted during both the mid-1970s and the mid-1990s consistently show that hearing hearing loss within the mining industr

    Jan 1, 2001

  • SME
    Barrick?s Zaldivar Mine Gets A Dome Cover Over Its Stockpile

    The Barrick Zaldivar mine is an openpit, heap-leach copper mine in Region II of northern Chile at an elevation of 3,300 m (10,826 ft), approximately 1,400 km (870 miles) north of Santiago and 175 km (

    Jan 1, 2009

  • SME
    Metals And Minerals Mining - Past And Future Trends

    By R. Mier

    The metals and minerals mining industry has evolved dramatically from the earliest objects ever made out of native copper circa 9,000 BC to the modern developments we see today. To better appreciate p

    Feb 27, 2013

  • SME
    New Bulkhead Design For Controlling Increased Hydrostatic And Dynamic Hydraulic Pressures

    By George Watson, Gu Quanzhong, S. Gerard Sawyer

    Bulkheads, also known as hydraulic seals, are used to seal abandoned workings and protect adjacent active mines from explosion and control unwanted inflows of water from poorly sealed shafts, water-be

    Jan 1, 2005

  • SME
    Pond Rehabilitation And Establishment Of A Site-Based Environmental Educational Curriculum At Cleveland-Cliffs Michigan Operations

    By A. Koski

    A pond rehabilitation and environmental education project were proposed by Cleveland-Cliffs Michigan Operations (CCMO) and approved by the Michigan Department of Environmental Quality (MDEQ) and the U

    Jan 1, 2007

  • SME
    North American Tunneling 2010 Conference Highlights

    Even though the economy of the United States remains in recession ? or not, depending on which economist you listen to ? muicipalities still need improved transportation, water and wastewater transit

    Jan 1, 2010

  • SME
    Probable Cost Estimating and Risk Management

    By John Reilly

    Costs of complex/underground projects have been consistently underestimated and delivery on time and on budget has been problematic. This has been attributed, to inadequate cost estimates and unidenti

    Jan 1, 2008

  • SME
    8 M Diameter 7 KM Long Beles Tailrace Tunnel (Ethiopia) Bored And Lined In Basaltic Formations In Less Than 12 Months

    By Antonio Raschillà

    On the 2nd of June 2007 SELI S.p.A. started the excavation of Beles Tailrace Tunnel (Ethiopia). The new 8,07 m diameter DS Universal TBM utilized for the tunnel excavation was manufactured by SELI S.p

  • SME
    More Than 110,000 Attend ConExpo in Las Vegas

    By Steve Kral

    More than 111,350 mining and construction industry professionals from throughout the world gathered in Las Vegas, NV, March 19-23 for ConExpo-Con/Agg 2002 and IFPE 2002. The triennial event is the We

    Jan 1, 2002