Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    æShot to ShovelÆ ù Understanding the Impact of Muckpile Conditions and Operator Proficiency on Instantaneous Shovel Productivity

    By J Battista, J Grace, I Brunton

    The need to better understand and develop strategies to improve instantaneous shovel productivity at the Cadia Hill Open Pit Mine (CHM) instigated the development of the æShot to ShovelÆ project. This

    Jan 1, 2004

  • AUSIMM
    Rio Tinto’s strategic assurance response to the Brumadinho tailings dam failure

    By J Lapwood, S Pal, M Pascoe

    The devastating failure of Dam I at the Corrego do Feijao iron ore mine near Brumadinho in Brazil on 25th January 2019 left at least 270 people dead or missing. In the immediate aftermath of this even

    Jul 1, 2021

  • AUSIMM
    The interaction between slag and MgO refractory at conditions relevant to nickel laterite ore smelting

    By A D. Pradana, D R. Pradana, Y H. Putra, Z Zulhan, T Hidayat

    The high temperature processing of nickel laterite ore is currently dominated by the Rotary Kiln- Electric Furnace (RKEF) technology. The ratio of SiO2/MgO (S/M) in the ore is one of the critical para

    Aug 21, 2024

  • AUSIMM
    Characterising the Reasons for the Difference in Performance of Two Ore Blends in Early Processing at OZáMinerals Prominent Hill Operation

    By D J. Bradshaw, E M. Wightman, C L. Evans, B Triffett

    During the commissioning phase of Prominent Hill, periods of reduced recovery were experienced with higher-grade ore blends. This was unexpected and as part of the process to identify the cause, surve

    Oct 29, 2012

  • AUSIMM
    The Effect of Drilling and Blasting Performance on Fragmentation in a Quarry and Time for Loading, Secondary Breakage and Crushing

    By J Seccatore, T Marin, M Cardu, G De Tomi, F Galvão, A Rezende, E Melo

    Small-scale mining operations are characterised by a large variety of equipment availability and a high level of operational flexibility. Mine planning is usually scarce or absent in small quarries in

    Aug 24, 2015

  • AUSIMM
    The Merlin Zone – Rhenium Quality Assurance

    By D A. Sketchley

    The Merlin Zone, a 2008 high-grade Mo-Re discovery, is a part of the Mount Dore Deposit in the Eastern Succession of the Mount Isa Inlier in Queensland, Australia. Hosted by carbonaceous metapelites a

    Aug 22, 2011

  • AUSIMM
    Evaluation of the impact of modifying froth launders in an industrial flotation bank using novel flotation models

    By A Yáñez, P Vallejos, R Grau, J Yianatos

    In flotation cells, especially in large flotation units, froth management is a crucial variable that should be considered during the design phase or optimised to improve the performance of existing fl

    Aug 24, 2022

  • AUSIMM
    Maximising resource utilisation in South Africa – the BIF story

    By A Singh, C Da Corte

    Banded Iron Formations or more commonly known as BIF are sedimentary rock formations with alternating silica-rich layers and iron-rich layers that are typically composed of iron oxides (hematite and m

    Nov 8, 2021

  • AUSIMM
    Tropicana - Unravelling the complexity of a +6 Million Ounce Gold Deposit Hosted in Granulite Facies Metamorphic Rocks

    By J Savage, A Crawford, M Doyle, N McNaughton, T G. Blenkinsop

    Area selection criteria for gold exploration have historically highlighted the low prospectivity of high-metamorphic grade terranes relative to regions with lower metamorphic grades. The Tropicana gol

    Sep 26, 2013

  • AUSIMM
    Rwanda and the Africa Mining Vision

    By I H. Wilson

    After decades of turmoil, Rwanda launched its Vision 2020 in 2000 aimed at reconstructing government and addressing poverty. Implementation focused on the agricultural sector, infrastructure and educa

    Jul 16, 2014

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    The Perseverance Gold Copper Deposit – A New Peak Mines Challenge

    By B Taylor

    The Perseverance deposit is the most southerly known economic copper/gold deposit within the Cobar gold field. The deposit is situated approximately 12 km to the south-southeast of Cobar and is essent

    Aug 22, 2011

  • AUSIMM
    Estimation of Flyrock Travel Distances: A Probabilistic Approach

    By M F. L Gibson

    The issue of flyrock is very important in the operation of all mineral extraction sites that use blasting. Unlike the other environmental effects of blasting, ground vibrations and air overpressure, f

    Jan 1, 2001

  • AUSIMM
    A Dynamic Sediment Simulation to Predict the Variability of Suspended Solids Concentrations over Life-of-Mine for Application to a Risk-based Environmental Assessment

    By M Ind, B Usher

    Environmental regulators are increasingly adopting risk-based approaches to protect aquatic ecosystems. The Australian and New Zealand Environment and Conservation Council (ANZECC) and the Agriculture

    Jul 16, 2014

  • AUSIMM
    Brave New World Autonomous Mining Systems

    By M Lynch, B White

    The historic city of Charters Towers in North Queensland is underlain by an extensive labyrinth of old mine workings in a large number of flat lying, subparallel, main and cross-cutting cross reefs ex

    Sep 26, 2013

  • AUSIMM
    A new sampler for grain and other free-flowing particulates

    By G J. Lyman

    Sampling of grain for mycotoxins is challenging in that some mycotoxins, such as Ochratoxin A (OTA), have very low permitted levels and the kernels carrying the mycotoxin may be highly localised withi

    May 9, 2017

  • AUSIMM
    A Phased Approach to Test Programs to Meet Feasibility Study Requirements

    By E Williams

    The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re

    Oct 5, 2011

  • AUSIMM
    Future skills and workforce evolution – training and skills development for mining operation engineer and drill and blast engineer in surface mineral mine PT Indo Muro Kencan

    By H Utama, R Heryadi

    PT Indo Muro Kencana (PT IMK) is a surface gold and silver mine located in Mt. Muro area, Central Kalimantan province, Indonesia. The mining operations of multiple open pits using combination of excav

    Sep 1, 2024

  • AUSIMM
    Automated Mineralogy for Ore Characterisation and Plant Optimisation

    By Y Gu, R Fandrich

    Traditionally, characterisation of the mineralogy and textures of ore and rock samples were based on observations of hand specimens and thin sections using an optical microscope. The extent of the dat

    Jan 1, 2007

  • AUSIMM
    Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater Effects

    By S France

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an

    Mar 8, 2011