Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Increasing Net Present Value by a Third at an Operating Sublevel Cave Mine Using Draw Strategy Optimisation

    By A D. Campbell, G R. Power

    The objective of the draw strategy in a caving mine is to maximise economic return by minimising waste dilution3 and maximising ore recovery4. The draw strategy must also include suitable controls for

    May 9, 2016

  • AUSIMM
    Human Resources Management at Grey River Gold Mining Limited

    Grey River Gold Mining Limited (GRGML) has constructed and largely completed the commissioning of an alluvial gold dredge designed to recover gold from a low grade gold deposit in the Grey River Valle

    Jan 1, 1989

  • AUSIMM
    Australian Rock Bolt Steel Chemistry and Stress Corrosion Cracking

    It's long been suspected that there has been an increase in the incidence of premature failure of rock bolts in underground coal mines over the past ten years. As far back as 2002 a study found a

    Nov 25, 2010

  • AUSIMM
    Continuous Improvement - How Changes in Metallurgy can have a Substantive Impact on Environmental Impact and Closure - Lessons Learnt from Environmental Auditing

    By G McMillan, P Mulvey

    "Geochemical characterisation is done based upon the geology and metallurgical batch testing prior to commencement of the operation of the plant.  Tailings repository design is based upon geochem

    Jul 15, 2013

  • AUSIMM
    Presidential Address. Some Applications of Geology to Mining and Metallurgy

    Professor Skeats said: I wish at the ,outset to express my appreciation of the h0!-l0ur conferred on me by my election as President of this Institute for the ensuing year. The selection of a geologist

    Jan 1, 1924

  • AUSIMM
    Caving-induced Subsidence Behaviour of Lift 1 at the Palabora Block Cave Mine

    By D P. Sainsbury, B L. Sainsbury, A Vakili, H-D Paetzold, P Lourens

    The cave propagation behaviour of a jointed rock mass is strongly governed by the unique nature of joints and discontinuities, together with the intact strength of rock bridges that make up the rock f

    May 9, 2016

  • AUSIMM
    An Application of Statistics to the Chemical Recognition of Nickel Gossans in the Yilgarn Block, Western Australia

    Principal component analysis of the variation of Cu, Ni, Zn, Pb, Mn, and Cr in a control group of 96 samples of surface ironstone from the Yilgarn Block, Western Australia, was used to derive a simple

    Jan 1, 1974

  • AUSIMM
    The Ebor Volcano - A Miocene-Age Central-Type Intraplate Volcanic-Intrusive Complex, North Eastern NSW, Australia

    By C A. Feebrey, R A. Duncan

    The Ebor Volcano in north eastern New South Wales is an eroded example of a central-type intraplate volcanic-intrusive complex. It is of Miocene age (19 - 20 Ma) and has similarities to other central-

    Jan 1, 1995

  • AUSIMM
    A Generalisation of GyÆs Model for the Fundamental Sampling Error

    Many sampling standards arrive at a value for the prescribed sample mass by assuming a specific relation between the sample mass and the relative standard deviation of the fundamental error and assign

    Jan 1, 2005

  • AUSIMM
    Geological Structure and Ore Occurrence at Norseman, Western Australia

    The Phoenix mine on the Mararoa Reef at Norseman, Western Australia, provides an outstanding: AUstralian instance of the recurrence of payable ore beneath the bottom of an abandoned mine, and an inter

    Jan 1, 1950

  • AUSIMM
    Re-Forging and Heat Treatment of Jackbits

    By Larkin F, Farrer E, McGhie R. R

    The Electrolytic Zinc Company of Australasia Limited commenced productive operations during February, 1936, at the- Rosebery and Hercules mines, which are situated near Rosebery, Tasmania. At this tim

    Jan 1, 1939

  • AUSIMM
    Comparative evaluation of manual sampling and Outotec MSA 2/50 metallurgical slurry sampler

    By J Loimi, P Minkkinen, T Korpela

    The head loss caused by metallurgical sampling for slurry streams can be reduced by metallurgical sampler design. When the process volumetric flow rate is reduced by vertical static cutters before the

    May 9, 2017

  • AUSIMM
    Presidential Address (d1c8711c-24f7-4067-8feb-50759fcd4917)

    In presenting this address I am conscious of the honour that has been paid me in my election to this important office, and I am very aware that I follow, in the position of President, many distinguish

    Jan 1, 1963

  • AUSIMM
    Study on Influence that Styrene-Phosphoric has on the Surface Property of Rutile Minerals

    Study on Influence that Styrene-Phosphoric has on the Surface Property of Rutile Minerals

    Sep 13, 2010

  • AUSIMM
    An Environmental Evaluation of the Geochemical Properties of Kaiata Mudstone and Brunner Coal Measures, Cypress and Stockton Mines, West Coast, NZ

    By D Craw, P Lindsay, B Peake

    The geochemical properties of Kaiata Mudstone and Brunner Coal Measures are evaluated in order to determine their suitability for placement at the proposed Cypress and existing Stockton mines. Correct

    Jan 1, 2004

  • AUSIMM
    Driving the 1,480 Ft Level at the South Mine, Broken Hill

    A drive, 3,500 ft long, was planned to explore mineralization exposed by diamond drilling. A rate of advance of 150 ft per fortnight, approximately double previous Broken Hill rates, was required. Sub

    Jan 1, 1965

  • AUSIMM
    Arsenic Mobility During Vegetation of Gold Mine Tailings

    By D Craw, C Smith, C Rufaut

    Oceana Gold (NZ) LtdÆs, Macraes Gold Operation currently has two tailings impoundments, the larger of which covers approximately 75 ha. When an impoundment is temporarily out of use, the surface dries

    Jan 1, 2004

  • AUSIMM
    Geology and Alteration Mineralogy of the Karangahake Adularia-Sericite Epithermal Deposit, Hauraki Goldfield, New Zealand

    By M Stevens, M P. Simpson, J L. Mauk

    The Karangahake deposit was the second largest producer of gold-silver bullion in the Hauraki Goldfield, New Zealand. New mapping of a 2 + 3 km (6 km2) area demonstrates that hydrothermal alteration s

    Jan 1, 2005

  • AUSIMM
    Environmental Management of a Traditional Coal Mining Site

    By R Byrnes, P Hensley

    The outstanding environmental management initiatives undertaken by Novacoal at its Western Main Site near Lithgow in

    Jan 1, 1995

  • AUSIMM
    The Monowai Mine û A Mechanised Mini-Mine in a Forest Park

    A summary of a proposal to develop a 20 000 tpa underground gold operation in a Forest Park. The environmental constraints are severe and affected the mine development planning and choice of mining me

    Jan 1, 1986