Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Requirements for Mine Ventilation Fans Delivered to Russia

    By M. Knot

    Fans delivered to the Russian Federation, and eventually to countries of the former U.S.S.R., for mine ventilation must meet the legislative requirements of local jurisdictions. This paper presents a

    Aug 1, 2013

  • CIM
    Siscoe Mine

    By W. F. James

    "The property of Siscoe Gold Mines, Limited, comprises about 1,600 acres, including Siscoe island and adjacent claims under water in Montigny lake, in Dubuisson and Vassan townships, Quebec.For many y

    Jan 1, 1954

  • CIM
    Optimizing Stope Design in a Deeper Mining Zone at the Musselwhite Mine

    By Ali Hashemi, Anna P. Perry

    The PQ Deeps (PQD) is a production zone located at Newmont’s Musselwhite Mine in northern Ontario. Development started for the PQD in late 2017, and the first stopes were mined starting in early 2021.

    Jan 1, 2023

  • CIM
    Isn't bigger always better? Applying Economic Profit to Exploration Management

    By Christopher A. Jacobs

    Project managers aim to maximise the NPV of their projects, but don't always appreciate the relationship between mine throughput, project value and the discount rate being used to evaluate their

    May 1, 2006

  • CIM
    Mining Methods at Torbrit Silver Mine

    By A. M. Cormie

    Introduction The purpose of this paper is to give a brief, general outline of mining practices at Torbrit Silver mine. The geology of the mine is touched on as it is felt that a rough picture of the

    Jan 1, 1951

  • CIM
    Enhanced Separation of Rare Earth Elements

    By A. Welty, T. Garn, K. Lyon, B. Jakovljevic, R. S. Herbst, M. Greenhalgh, Cytec Solvay Group

    "Industrial rare earth separation processes utilize PC88A, a phosphonic acid ligand, for solvent extraction separations. The separation factors of the individual rare earths, the equipment requirement

    Jan 1, 2016

  • CIM
    The Influence of Curvature on the Stability of Rock Slopes

    By Kevin Azocar, Jim Hazzard

    "Slope stability analysis is performed most commonly using limit equilibrium calculations or numerical models assuming a two-dimensional slice through an infinitely long slope surface. In areas such a

    Jan 1, 2015

  • CIM
    Nuclear Energy (3ed2a4ff-b203-4023-af85-5443ca203ded)

    By D. B. Nazzer

    "ANY DISCUSSION of energy today is incomplete without consideration of nuclear energy. In the Maritimes, with plentiful supplies of coal, with relatively easy availabilty of imported oil brought in to

    Jan 1, 1972

  • CIM
    Tunnelling in Squeezing Ground Conditions - Problems and Solutions

    By W. Schubert, N. Radoncic

    "The term “squeezing” is frequently used, although it is ill defined. Definitions like “large and long lasting displacements” raise the questions about the threshold values for the magnitude and durat

    Jan 1, 2015

  • CIM
    The Nordic Ventilation System – An Overview

    By Adrianus (Adrian) Halim, Tomas Bolsöy, Stina Klemo

    "This paper describes the ventilation system used in underground hard rock mines in Sweden and Finland, which is very different than the system used in other major mining countries such as Australia,

    Jan 1, 2019

  • CIM
    Collaboration Between NGOs and the Mining Industry In the Third World

    By Tony Breuer

    Can international development NGOs and the mining industry find common ground and work together in the Third World? The Canadian Hunger Foundation/PARTNERS in Rural Development (CHF-PARTNERS) has, ove

    May 1, 2001

  • CIM
    In-Situ Stress Measurement at Shallow Depth in the Vicinity of the Epicenter Before and after the 2011 Tohoku-Oki Earthquake

    By K. Sakaguchi, T. Yokoyama

    "In-situ rock stress measurement was carried out in the Kamaishi mine of Iwate Prefecture to quantify the variation of the shallow crustal stress field associated with the 2011 Tohoku-oki earthquake.

    Jan 1, 2015

  • CIM
    Thermal-Mechanical FEA Modeling of Furnace Hearth Refractory for Design and Campaign Life Improvement

    By K. Chomyn, R. Veenstra, P. Zangeneh, Hatch Ltd., C. Van der Woude, H. Ghorbani

    "The furnace is the heart of smelting operations, and therefore the performance, reliability, and campaign life of the furnace are critical considerations. Furnace refractory is exposed to high tempe

    Jan 1, 2016

  • CIM
    Keynote Address - Oil and Gas

    By W. L. Single

    "LET ME FIRST OF ALL thank you for sending this invitation to me to participate in this Annual Meeting of The Mining Society of Nova Scotia. As an engineer, although I don't get an opportunity to prac

    Jan 1, 1973

  • CIM
    Estimation of the in Situ Block Size in Jointed Rock Masses Using Three-Dimensional Block Simulations and Discontinuity Measurements

    By M. Pötsch, A. Kluckner, P. Söllner, W. Schubert

    "The in situ block size is a key parameter in the geomechanical characterization of rock masses. It describes the fracturing of the rock mass and thus is a measure for the degradation of the rock mass

    Jan 1, 2015

  • CIM
    Limestone in the Pulp and Paper Industry

    By H. J. Rowley

    THERE are many varieties of limestone, but for the general purposes of the pulp and paper industry, two classifications are sufficient: (1) High-calcium stone, which should be quite free from impuri

    Jan 1, 1939

  • CIM
    Increasing Paste and Hydraulic Backfilling Efficiency Through Instrumentation

    By B. D. Thompson

    Many mines adopt necessarily conservative backfilling strategies due to a lack of understanding of their backfill behaviour. In the past five years, extensive instrumentation campaigns have focused on

    Aug 1, 2013

  • CIM
    Application of Dynamic Modelling for Brownfield Process Simulation

    By Michel Ruel, Ali Soltanzadeh, Benjamin Légaré

    High fidelity commercial process simulation packages can be used at different stages of a greenfield project, from initial plant design to operator training in the later stages. However, there are sev

    Jan 1, 2016

  • CIM
    High Performance Synthetic Ropes for Mine Hoisting

    By Allan J. Guse

    The primary limiting factor for hoisting capacity from great depths is the self-weight of the typical steel wire ropes used for mine hoisting. Steel wire ropes possess properties making them very su

    May 1, 2013

  • CIM
    Mine Ventilation on Demand System at Nickel Rim South Mine; Testing Procedures, System Maintenance, and Results

    By E. McLaren, J. Sanftenberg, C. Cameron, H. Dello Sbarba

    "A Ventilation on Demand (VOD) system has been optimized and maintained at Glencore’s Nickel Rim South Mine (NRS) in Sudbury, Ontario, Canada for the past seven years. The system monitors and controls

    Jan 1, 2019