Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Geostatistical Modeling of McMurray Oil Sands Deposits

    By Oy Leuangthong

    The McMurray formation in the Athabasca oil sands deposits of Northern Alberta is part of the world?s second largest proven crude oil reserves. The formation is characterized by stratigraphic layers t

    May 1, 2004

  • CIM
    The Millennium Iron Range Project

    By Robert Martin

    New Millennium ?a new project for an experienced mine building team ?Owns 100% of KeMag(Harris Lake) property ?Owns 80% of LabMag(Howells River) property -20% owned by Naskapi Nations of Kawawachika

    May 1, 2007

  • CIM
    Reflectance Spectroscopy with X-Ray Fluorescence for Rapid Slurry Analysis

    By Olli Haavisto, Juha Timperi

    "Accurate on-line assays of mineral slurries are the basis for effective operation of flotation circuits. Typically the elemental content measurements are obtained by an X-ray fluorescence (XRF) analy

    Jan 1, 2016

  • CIM
    An Economical Vertical Transport System to Hoist 3 Mt of Ore per Annum from 1640 m

    By Wendy L. Naysmith

    This paper deals with the various options considered and factors that influenced the final selection of the headframe, shaft layout and hoisting systems required at the Impala No 16 Shaft in order to

    Oct 1, 2010

  • CIM
    The Pinehouse Limestone Project

    By Doug Smith, Gary Taylor, Paul Ogryzlo

    "Uranium mining and processing typically requires large quantities of high-grade reactive quicklime for the neutralization and clean-up of contaminated mine water and mill process waste streams. Curre

    Jan 1, 2003

  • CIM
    Dragline monitoring, control, and navigation

    By J. Hansen

    "ABSTRACTThe paper addresses the application of automated monitoring, control, and navigation to improve dragline performance. SummaryImproving dragline performance in the Canadian coal mines is criti

    Jan 1, 2000

  • CIM
    The integration of condition monitoring into the maintenance process (16e8fde4-e738-4229-a500-8c29dcc904ed)

    By M. W. Lewis, J. Werner

    Fluctuating metal prices, declining head grade, and increased operational costs are forcing many open pit mining companies to look to their balance sheets for significant cost reductions in order to r

    Jan 1, 2005

  • CIM
    Comparative Study on Flotation Performance of Stockpiled and Fresh Ore Samples

    By C. Pelley, S. Kelebek, T. Katsabanis, B. Nanthakumar

    "As part of a larger investigation on generation of fines from mining activities and their effect on downstream operations, ore samples from Onaping area stockpiles of Falconbridge Ltd were studied. B

    Jan 1, 2006

  • CIM
    Dust Control and Ventilation at Ontario Mines

    By C. S. Gibson

    "MOST of the mines in the Province of Ontario in Canada are multi-level operations in steeply dipping veins; yet there is an appreciable number whose de-posits are relatively flat-lying, ranging up to

    Jan 1, 1960

  • CIM
    Leaching Behaviour and Metal Fixation Within Cemented Paste Backfill Materials

    By E. Fried

    Cemented paste backfill (CPB) is an innovative tailings management method that consists in returning considerable amounts of mine tailings into the underground mine openings. The filled stopes thus pa

    May 1, 2007

  • CIM
    Subaqueous Deposition of Acid Generating Tailings into an Acidic Lake Environment: Pilot Column Test Results

    By Linda C. M. Elliot, Liangxue Liu

    "The deposition of tailings under water is considered to be one of the most environmentally promising and potentially cost effective methods to reduce or eliminate acid mine drainage from tailings. On

    Jan 1, 1997

  • CIM
    Origins of Electrorerefining: Birth of the Technology and the World's First Commercial Electrorefinery

    By A. E. Wraith, J. Protheroe Jones, P. J. Mackey

    The world’s first copper electrorefinery started production in 1869 at Burry Port in South Wales. Built within the Pembrey Copper Works which had commenced smelting operations in 1849, the new refiner

    Jan 1, 2019

  • CIM
    Stereolithography, a Rapid Prototyping Technique for Orebody Modeling and Mine Design

    By Christopher P. O?Connor

    Stereolithography is a well known rapid prototyping technique in the manufacturing sector. Essentially it is a three dimensional printing process that produces plastic prototype parts from standard CA

    May 1, 2002

  • CIM
    Tensile Strength Anisotropy of Barre Granite

    By F. Dai

    Granitic rocks usually exhibit strongly anisotropy due to pre-existing microcracks induced by geologic loadings. The understanding of the rock anisotropy in mechanical properties such as tensile stren

    May 1, 2009

  • CIM
    How much is TOO much? A statistical look at bench flotation data and re-circulating chemical concentrations

    By Thomas R. Larson

    "Many concentrators use re-circulating “plant” water for dilution in their flotation circuits. However, if crusher dust suppressants, ball mill grinding aids, or even agitator bearing grease are intro

    Jan 1, 2002

  • CIM
    Rock Strength Characterization for Excavations in Brittle Failing Rock

    By B. H. Kim

    It is hypothesized that the standard approach adopted to characterize the ground and to determine the rock strength properties at depth are flawed and generally tend to underestimate the rock strength

    May 1, 2009

  • CIM
    Uranium in Non-Ferrous Metals

    By R Thomson

    The use of uranium metal in non-ferrous metallurgical practice is dis-cussed with reference to its alloying behaviour and chemical activity. It is suggested that the more promising applications are in

    Jan 1, 1963

  • CIM
    Design, Construction and Performance of PKC Dams on Northern Terrain

    By James W. Cassie

    The Snap Lake Diamond Project is located approximately 220 km northeast of Yellowknife, NT, Canada at an approximate latitude of 63?35?. The project location is within the zone of continuous permafros

    May 1, 2003

  • CIM
    Constancia Project Process Plant Design and Start Up

    By David Stephenson, Hugo Granados, Steven Klohn

    "HudBay’s Constancia project is a copper molybdenum concentrator located in southern Peru. In 2010 Ausenco was contracted to perform a feasibility study optimization review which resulted in an improv

    Jan 1, 2016

  • CIM
    Average Relative Error in Geochemical Determinations: Clarification, Calculation, and a Plea for Consistency (31b12265-3348-4f2c-b091-f58cbc224f80)

    "The measurement of error in assays collected as part of a mineral exploration program or mining operation historically has been undertaken in a variety of ways. Different parameters have been used to

    Jan 1, 2007