Kinematic Load Tests On A Model Pile In ClayBy Michael J. Brown
Load testing is important for controlling the quality of piled foundations. The Statnamic test is an alternative to existing testing methods with a load duration that lies between that for static and
Jan 1, 2002
-
2 Recent Technological Developments In Deep Foundations Without Soil Excavation - Recent Technological Developments In Deep Foundations Without Soil Excavation - Brief Review Of Papers To Session 2By Bengt H. Fellenius
Session 2, Deep Foundation without Soil Excavation, has attracted no fewer than 22 papers dealing with subjects from soil improvement by grouting, injection, and deep mixing techniques through vibrofl
Jan 1, 1994
-
Disconnected Piled Raft Foundations Performance (DCPRF) With CushionBy Saeed Salehi Malekshah
In hybrid foundation system or piled raft foundation (PRF), the raft has adequate bearing capacity and piles are usually required to ensure overall stability of foundation and also to act as settlemen
Jan 1, 2011
-
Retrofitting Drainage Systems with Pressed-in Sheet Piles in Very Hard Soil in Southern CaliforniaBy Takefumi Takuma, Masashi Nagano, Christopher DellAringa
Multiple agencies in Southern California are retrofitting and upgrading their levees to catch up with ever-advancing urbanization affecting the requirements for existing channels and levees in this se
Jan 1, 2018
-
Design And Construction Of The Rion Antirion Brdoge FoundationsBy Alain Pecker
The choice of a design concept for a bridge foundation is guided by various factors; several of these factors are indeed of technical origin, like the environmental conditions in a broad sense, but ot
Jan 1, 2005
-
-
Applicability of Wet Grab Sampling to Quality Assurance of Deep Mixing MethodBy Masaki Kitazume
"Abstract The wet type and dry type of deep mixing methods have been developed and widely applied for on-land and marine constructions in Japan. The quality assurance (QA) of the methods has been usua
Jan 1, 2014
-
Problems Encountered For Deep Caissons For The Second Bassein Creek Bridge At Mumbai, IndiaBy Deepak B. Deshpande
This paper enumerates various difficulties encountered in the design and construction of deep caisson foundations for the Second Bassein Creek Bridge constructed over a creek with very difficult site
Jan 1, 2002
-
Underpinning The Existing No. 1 Subway Line At The World Trade CenterBy Richard Crockford
The World Trade Center (WTC) is located on the west side of Manhattan in New York City, approximately 0.5 miles north of Wall Street, and is owned and operated by the Port Authority of New York and Ne
Jan 1, 2008
-
Load In A Drilled Foundation. Where Did It Go And When Did It Get There?By Walter E. Vanderpool
Three drilled foundations for an elevated water-tank were instrumented, tested and monitored during construction and the first two years in service. One shaft was load tested by the Osterberg method.
Jan 1, 2004
-
Case Studies In Mission Bay, San Francisco: Deep Foundations In Challenging Soil ConditionsBy Lori A. Simpson
Mission Bay is a 300-acre reclaimed site in San Francisco, California, that is currently being redeveloped. Plans include new neighborhoods, parks, a new University of California, San Francisco, rese
Jan 1, 2006
-
Ground Improvement for the Distressed Earth Bund Using Stone Column - A Case StudyBy M. Kumaran, A. Vetriselvan, A. Purantharan
"This paper presents a case history of evaluating the stability of a distressed earth bund and rectification measures carried out. A 5.45 km long, 7m high earth bund for drinking water storage was con
Jan 1, 2017
-
Application Of Augered, Cast-In-Place Displacement (ACIPD) Piles In New York CityBy Willie M. NeSmith
Conventional augered, cast-in-place (ACIP) piles were introduced into the New York City area as a result of the damage to existing structures caused by pile driving operations. ACIP piles are often sp
Jan 1, 2004
-
Experimental Evidences From A Pile Load Test On A Driven Composite PileBy A. Garassino
A pile design was performed for a thermal power station in Egypt and more than 4000 piles were to be driven. Technical economical reasons suggested the choice of driven composite LACOR piles designe
Jan 1, 1991
-
1 Recent Technological Developments In Deep Foundations With Soil Excavation - Deep Foundations With Soil Excavation: Bored Piles, Root Piles, CFA Piles, Slurry Trench Walls - Allocation Of papersBy J. Hartikainen
19 papers were allocated to this session by the paper classification committee, 8 related to bored piles, 5 to continuous flight auger piles (CFA piles), 3 to slurry trenches, 2 to both bored piles an
Jan 1, 1994
-
Installation Of Augerpiles In Low Headroom And Restricted Access ConditionsBy Jim Steding
L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th
Jan 1, 2003
-
Appropriate Field Measurements For Testing Capacity-Prediction Methods For Piles Installed By Vibration - IntroductionBy Michael W. Neill, O&apos
The engineering profession generally does not accept vibro-driven piles as bearing piles unless their capacities can be verified by restriking with an impact hammer, which significantly reduces the ec
Jan 1, 1989
-
Foundation Design and Construction Challenges with Marsh Deposits in a High Seismic Risk ZoneBy M. Reza Saberi, T. Ted Miyake
Driven piles are a common tool in any engineer’s toolbox for supporting large structures over very soft ground, especially in high seismic risk zones. Challenges include achieving sufficient vertical
Jan 1, 2018
-
High-Capacity Rock Anchors Provide Uplift Resistance For Concrete-Filled Steel Pipe Piles - A Case StudyBy James Weaver
During the past 16 years, the authors have successfully used high-capacity rock anchors installed inside open-ended pipe piles, driven to bedrock, to provide uplift and overturning resistance for vari
Jan 1, 2011
-
Steel Pile Foundations For Transmission Line Towers, As Used In Western Europe. - 1. Introduction.By Alexander J. Verstraeten
The design and construction of foundations for power transmission line towers present some special problems. This paper describes a system of design and construction for these foundations that was dev
Jan 1, 1987