Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Recent Projects - Emergency Bridge Blasting

    By Brent Blanchard

    As most veterans of our industry are aware, explosive demolition by its very nature is often a challenging proposition. Even under the best of circumstances, proper planning and care must be taken dur

    Jan 1, 2003

  • ISEE
    Drone Technology Utilization to Increase Safety and Support Analysis for Blasting Process

    By Ery Wardhana, Stefanus Jagad, Relinda Sanistya, Hasucita Tausi, Rido Situmorang

    The blasting process is one of the most high-risk activities in mining operations. Shotfirers and blasting crews face hazards from slope failure, toxic gas and fumes, or unstable ground condition ever

    Feb 6, 2023

  • ISEE
    Understanding Spontaneous Detonation of Ammonium Nitrate

    By Alastair Torrance, Gary Cavanough

    Approximately 1.5 million tonnes of ammonium nitrate are transported annually across Queensland, Australia—equivalent to nearly 100 truckloads per day. This is in the form of both AN prill and ammoniu

    Jan 26, 2026

  • ISEE
    Implementation of a Real Time Traceability System from Mine to Plant

    By R. Ticona, J. Alarcon

    In the continuous search to provide comprehensive solutions and identify opportunities to improve ore traceability, from the blastholes to mill feed, different ore traceability systems have been devel

    Jan 1, 2024

  • ISEE
    Blasting Versus Non-blasting Related Sounds in a House Near Surface Blasting

    By Braden Lusk

    A typical rural house surrounded by a surface coal mine was instrumented in 2008. Information regarding ground vibration, airblast, and sounds inside the house was collected. Previous publications hav

    Jan 1, 2011

  • ISEE
    Application of Differential Blasting for Value Chain Optimisation

    By Stephen Mansfield, Saran Sankar

    The Sentinel open pit copper mine, operated by First Quantum Minerals Ltd, is located in the North West province of Zambia. The Sentinel orebody is a sediment-hosted, structurally modified deposit in

    Jan 21, 2025

  • ISEE
    Time-retarded Chemistry Tweaks Shock/heave Ratio

    By Michael Wieland

    Work-principle computations for explosions underwater or in rock reveal the way the thermodynamic characteristics of surrounding material influence the resulting shock and heave. To reach total thermo

    Jan 1, 2008

  • ISEE
    Automatic 3D Fragmentation Analysis from Drone Imagery

    By Andreas Gaich

    A new 3D fragmentation analysis method for muck piles is presented. It works with aerial imagery from UAVs (drones) and handles entire muck piles with minimum user intervention.

    Feb 1, 2020

  • ISEE
    Efficient and Safe Pre-Split Blasting Through Mechanized Explosive Loading System

    By Jorge Cárdenas, Gustavo Huerta, Regina Rocha Oriundo, Miguel Angel Humpire, Johan Salas Flores

    Currently a critical activity for slopes stability and safety in mining is pre-split blasting to reduce damage from trim blast. Most common explosive used are based on packaged explosives, with 1 ½ in

    Feb 6, 2023

  • ISEE
    The Effect of Charge Mass and Delay Timing on Airblast Overpressure

    By Adrian Moore, Dominic Hooton, Alan Richards

    Significant factors affecting airblast overpressure (AOP) emissions include charge mass per delay, distance from the blast site, burden, stemming height, and delay timing, topographic shielding, and m

    Jan 21, 2025

  • ISEE
    Precision Delay Detonators: A Decade of Progress

    By M. Y. Wong

    Electronic detonators have been used on a trial basis for over a decade, and found more recent application in production blasting as well. The relative merits of these detonators and their applicabili

    Jan 1, 2004

  • ISEE
    Electronic Detonator Timing Approaches for Surface Quarries and Metals Mines

    By Tristan Worsey, Nathan Rouse, Evan Thibaud

    Electronic detonators allow for variability and accuracy with blast delay selection and timing sequence. However, a single published guideline for selection of electronic timing delays is not availabl

    Jan 21, 2025

  • ISEE
    Work Principle For Predicting Explosive Toxic Fumes

    By Michael S. Wieland

    The work-principle method was developed for theoretically resolving toxic fumes from non-ideal charge formulations. The whole description of a wanted process refers to macroscopic changes resulting fr

    Jan 1, 1998

  • ISEE
    Automation of Rock Fragmentation Analysis

    By Hairong Zeng, Matthew Baumann, Shahram Tafazoli, Edmond Chow

    Measurement of rock fragmentation has evolved from a completely subjective and manual process to a statistically objective and semi-automated process. However, ultimately, the vision is to achieve a s

    Jan 1, 2012

  • ISEE
    Modeling Blast-Induced Damage in Open Pit Mines with Numerical Models

    By Cristian Castro, Patricio Gomez, Jason Furtney, Augusto Lucarelli

    Understanding the effect of blast-induced damage on wall stability is critical to safe and economical operation of a large open pit mine. In this paper, a numerical modeling methodology is used to inv

  • ISEE
    Modeling Blast-Induced Damage in Open Pit Mines with Numerical Models

    By Cristian Castro, Patricio Gomez, Jason Furtney, Augusto Lucarelli

    Understanding the effect of blast-induced damage on wall stability is critical to safe and economical operation of a large open pit mine. In this paper, a numerical modeling methodology is used to inv

    Feb 1, 2020

  • ISEE
    A powder factor build-up model to quantify most common influencing factors at the Serra Sul mine

    By L. Chaves

    In rock blasting, due to numerous factors, both controllable and uncontrollable, the execution rarely meets the planning. The powder factor is an important KPI for blasting since it represents the amo

    Jan 1, 2024

  • ISEE
    An Explosive Delivery System implementation in the Steep Gullies at the Arapahoe Basin Ski Area

    By Mark Bosse

    This is a paper demonstrating the use of a fixed wire and trolley system to deliver 2 or 5 lb cast primers (with 2 meter cap/fuse assemblies) deep into avalanche terrain. This avalanche terrain is mi

    Feb 1, 2020

  • ISEE
    Detailed Planning Underscores Expansion of Vulcan's Chattanooga Quarry

    By R L. Mayville

    The author explains why the strategic location and important limestone reserves at Chattanooga Quarry led to a decision to extend operating life by continued benching down to lower levels. He discusse

    Jan 1, 1984

  • ISEE
    Maximizing Mining Recovery Through Advanced Blasting Techniques and Blast Movement Management

    By Aris Tambunan, Nella Lubis, Nurafrianti Saala, Komang Widhiayanto, Herry Saputra, Rudolf Sitorus

    Maximizing mining recovery rates and minimizing ore loss are pivotal objectives for economic efficiency and operational effectiveness. This study explores methods to address these imperatives by enhan

    Jan 21, 2025