Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
Driving Molycorp’s Conyeyor Decline at QuestaBy D. R. Shoemaker, H. W. Judges
A 16.5-kt/d underground molybdenum mine is being developed at Questa in northern New Mexico by Molycorp Inc., a wholly-owned subsidiary of Union Oil Company of California. The new $200-million undergr
Jan 6, 1980
-
Development Of A Methodology That Integrates Environmental And Social Variables In The Investment Decision Process For Mining ProjectsBy J. A. Botín
In modern mining, the core of mine planning and design is the block model, a simplified representation wherein the ore deposit is divided in a number of virtual rock cubes, each characterized by techn
Feb 27, 2013
-
Factors Influencing Use Of Mineral Admixtures For The Past Decade In The Western US - Preprint 09-081By G. Hoffman
Sustainable development has brought social, environmental and energy efficiency concerns together with management and governance of natural resources. Cement manufacturing, an energy- and natural reso
Jan 1, 2009
-
The Application Of Bulk Emulsion Explosives In Tunneling And Drift RoundsBy David A. Smith
A new generation of reliable, stable, and easy to use bulk emulsions allowing application in tunneling and drift rounds has been developed. This new product group of bulk emulsions has been especially
Jan 1, 1987
-
A Virtual Planning Method for Spatial Pose and Performance Fusion Advancement of Mining and Transportation Equipment in Complex Geological Environment - Mining, Metallurgy & Exploration (2023)By JIACHENG XIE, Juanli Li, Wenyong Du, Tao Cui, Mengyao Dong, Pengfei Huo
The operation of intelligent coal mining in complex geological environment is still unable to realize automation. In order to realize the autonomous cutting of fully mechanized mining equipment and im
Nov 22, 2022
-
bauma Exhibitors Display Their Products to Largest Crowd EverThe title of “the world’s biggest volume-produced hydraulic breaker,” that was held for more than a decade by the Atlas HB 7,000, changed hands with the launch of Atlas Copco’s HB 10,000 at bauma 2007
Jan 1, 2007
-
Pump And Cyclone Design/Optimization To Maximize Grinding Circuit EfficiencyThe design/optimization of the pump and cyclones to maximize grinding circuit efficiency first requires a concise understanding of, and clearly defined specifications for, desired grinding circuit per
Jan 1, 2011
-
Selective Recovery of Manganese from Low‐Grade Ferruginous Manganese Ores Through SO2 Leaching (Mining, Metallurgy & Exploration)By V. K. Reddy Kallam, NEHA PANDEY, Sunil Kumar Tripathy, ARIJIT BISWAS
The study investigates SO2 leaching of low-grade ferruginous manganese ores to selectively recover manganese as MnSO4 and produce battery-grade electrolytic manganese dioxide (EMD). The effects of lea
Apr 20, 2022
-
Use Of The Multiple Accounts Analysis Process For Sustainability OptimizationBy S. Shaw
There is an increasing requirement for mines to meet a certain minimum criteria for sustainability within the context of the physical environment, ecosystem and socio-economic system in which they are
Jan 1, 2004
-
Electrical Accidents In The Mining Industry, 1990-1999 (a667b09a-202f-425d-9b08-95e0dee3b098)By J. C. Cawley
This National Institute for Occupational Safety and Health study was conducted to focus future research on the most significant electrical problems in the mining industry. Data from 1,926 mine electr
Jan 1, 2002
-
WEMCO/LEEDS Flotation Column DevelopmentBy John B. Sabey, Vernon R. Degner
The industrial coal processing trend toward greater fines production, due to mining techniques and customer requirements for reduced ash and sulphur content in the fine coal product, is the basis for
Jan 1, 1988
-
Assessing the contribution of underground in-situ coal gasification (UICG) within a sustainable development frameworkBy Z. Hyder, M. Karmis
Underground or In-situ Coal Gasification (UCG or UICG), though not a new concept, is now attracting considerable global attention as a viable process to provide a "clean" and economic fuel from coal.
Jan 1, 2011
-
Phased Approach to Stormwater Tunnel RehabilitationBy Todd Wanless
This paper addresses the challenges experienced by the designer and three government agencies during implementation of major improvements for the Turkey Creek Tunnel in Kansas City, Kansas. The tunnel
Jan 1, 2008
-
Computer Modeling For Improved Production Of Mechanical ExcavatorsBy L. Ozdemir, M. Cigla
This paper presents and discusses some of the computer models developed and currently used at the Earth Mechanics Institute (EMI) of the Colorado School of Mines (CSM). These include the performance m
Jan 1, 2000
-
Open-Air Sprays for Capturing and Controlling Airborne Float Coal Dust on Longwall Faces (045123de-356a-4cdc-8bb8-804d526a0d95)By M. R. Shahan, C. E. Seaman, Mischler S. E., T. W. Beck
"Float dust deposits in coal mine return airways pose a risk in the event of a methane ignition. Controlling airborne dust prior to deposition in the return would make current rock dusting practices m
Jan 1, 2018
-
Technology News - GE Supplies Electrical Systems for Bucyrus DraglinesGE Industrial Systems has received a multimillion dollar contract from Bucyrus International to supply complete electrical systems for three new draglines. These machines will be installed at Coal Ind
Jan 1, 2000
-
Rapid Excavation Using Trackless TechniqueBy S. P. Lewis, R. L. Sundeen
Most of us are aware of the ever increasing use of underground space. At the Advisory Conference on tunneling in Washington, D. C. in June of 1970, the demand for construction oriented tunneling durin
Jan 1, 1974
-
Discover mining?s history at Arizona Mining and Mineral MuseumWhile SME is hosting its Annual Meeting at the Phoenix Convention Center, Feb. 28 to March 3, one of the finest collections of mining history will be on display just 15 blocks away at the Arizona Mini
Jan 1, 2010
-
Expanding The Limitations Of The MFire Simulation ModelIn 2002 the authors updated the MFire model developed by the US Bureau of Mines. MineFire, developed by Mine Ventilation Services, Inc. (MVS), uses the MFire model to perform mine fire simulations on
Jan 1, 2011
-
Dust Control for Coal Handling : Design Considerations and SolutionsBy Henning E. Soderberg, Robert Brien, O&apos
Coal may be the answer to US energy problems, but it also has its drawbacks. If it is crushed, screened, dumped, or moved, the environmental engineer is faced with a dust problem. To control coal d
Jan 10, 1981