Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Yield Pillar Application Under Strong Roof And Strong Floor Condition - A Case Study
By P. Tsang
The mechanisms and functions of yield pillar are analyzed by employing finite element method that takes time dependent and plastic failure of rock into consideration. The design criteria for different
Jan 1, 1989
-
High Horizontal Stress Effects On Longwall Gate Entry Stability
By Yajie Wang
High horizontal stress and its adverse effects on longwall gate entries have been witnessed in many US coal mines for the past years. It can cause cutter roofs and leads to roof falls either in the he
Jan 1, 1996
-
Beyond Coalbrook: Critical Review of Coal Strata Control Developments in South Africa
By J. Nielen van der Merwe
Rock engineering research and technology development in South Africa only received serious attention in reaction to the Coalbrook disaster in 1960. At the time, a number of gaps in knowledge of rock r
Jan 1, 2006
-
Pillar Strength and Design Methodology for Stone Mines
By Gabriel Esterhuizen
Underground stone mines in the United States make use of the room-and-pillar method of mining. A prerequisite for a safe working environment is that the pillars should adequately support the overburd
Jan 1, 2008
-
Insitu Performance of One Step Bolts to New Zealand Thick Coal Seam Mining Environments
By Richard Campbell
Effective strata control, utilising fully encapsulated resin grouted roof bolts is dependent on the installed quality of the reinforcement elements. Resin based grouts are the main form of rock bolt
Jan 1, 2006
-
Analysis of Cutting Bits and Cutting Drum Affecting Ground Control in Coal Mines
By A. Wahab Khair
Coal mining has evolved into extensive use of continuous mining machines for development and production. This has resulted in an increase in dependence on the versatile continuous miners. The present-
Jan 1, 2008
-
Mine Stability Mapping
By Collin L. Stewart
The high cost and limited flexibility of modern longwall systems has resulted in the need for mine engineers and geologists to predict possible adverse mining areas ahead of mining and to then design
Jan 1, 2006
-
A Study of Roof Caving in the Eastern U.S. Coalfields
Appropriate roof control is the most important requirement in underground coal mining and, in the case of longwall panels or second mining in room and pillar extractions, this can be simply expressed
Jan 1, 1986
-
Analytical Solutions of Hard Roof’s Bending Moment, Deflection, and Energy under Front Abutment Pressure before Periodic Weighting
By Yun Zhang, Haijun Jiang, Shenggen Cao, Chen Wang
The distribution of front abutment pressure is closely related to the force, deformation and energy distribution of hard roof before periodic weighting. So it is necessary to carry out research on the
Jan 1, 2015
-
Assessment and Mitigation of Subsidence Effects on a Tall Self-Supporting and Free-Standing Communication Tower
By Yi Luo
A longwall mining operation went under a tall, self-supporting and free-standing wireless communication transmission tower. In anticipation of that the ground subsidence process might affect the trans
Jan 1, 2008
-
A Retrospective Assessment of Longwall Roof Support with a Focus on Challenging Accepted Roof Support Concepts and Design Premises
By Thomas M. Barczak
The era of the shield-supported longwall face began in the United States a little over 25 years ago. The most fundamental development of the shield in the past 25 years has been an increase in size a
Jan 1, 2006
-
Quality Assurance in the Processing of Mining-Induced Subsidences and Research Work Into Mining Subsidence Engineering in the German Hard Coal Industry
By Peter Fischer
Between 45,000 and 50,000 claims for subsidence are submitted each year to the German hard coal industry. In order to improve the service to claimants a quality management was established in 2005. Thi
Jan 1, 2006
-
Direct Laboratory Tensile Testing Of Select Yielding Rock Bolt Systems
By John D. VandeKraats
Yielding rock bolt support systems have been developed to accommodate ground movement in shifting ground such as in coal operations; in creeping ground such as salt, trona, and potash; and in swelling
Jan 1, 1996
-
Rock Classification For Portal Design
By G. K. Rogers
The portal, which is the near-horizontal, surface point of entry to an underground excavation, can often be an exceedingly difficult area in terms of ground control. Surface and subsurface failures at
Jan 1, 1989
-
Investigating Abutment Load
By Ihsan Berk Tulu
In the Analysis of Retreat Mining Pillar Stability (ARMPS) program, the magnitude of the abutment loading adjacent to a gob area is calculated using an ?abutment angle? concept. The extent of the abut
Jan 1, 2012
-
Yield Pillar Behavior At Jim Walter No. 7 Mine Stress And Strata Measurements Of Yield And Abutment Pillars
By J. Brasfield
Jim Walter Resources, along with the Rock Mechanics Branch of British Coal and Strata Control Technology Pty. Ltd., is presently studying the yield-stable-yield pillar design in use at the Blue Creek
Jan 1, 1994
-
Influence Of Cutting Sequence On Development Of Cutters And Roof Falls In Underground Coal Mine (e70fc8d5-b1f5-424b-b360-729cb6e50081)
By Anil K. Ray
Roof falls are one of the greatest hazards in underground coal mines worldwide. Due to stringent safety measures and extensive support system development, roof falls have been reduced significantly bu
Jan 1, 2009
-
Underground Movement Of Rock Mass And Stress Distribution Due To Multiple Mining
By Victor V. Nazimko
Multiple mining generates gob-interaction displacements. They redistribute stress m strata and obey laws of irreversibility thermodynamics. An irreversible state causes inhomogeneity of the stress dis
Jan 1, 1996
-
The Uniaxial Compressive Strength Of Coal: Should It Be Used To Design Pillars?
By Christopher Mark
The Bureau of Mines has recently completed a comprehensive study of coal strength. More than 4000 individual test results from over 60 seams were extracted from the literature and combined in the most
Jan 1, 1996
-
Roof Control Analysis In North River Mine
By Mike Watts
Since the first longwall panel development started in the new mining, (Southern) area, a number of roof falls have occurred in L1 and L2 gate-entries. The longwall was delayed for a total of two month
Jan 1, 2000