    Optimal Subsurface Investigation Approach for Overhead Transmission Structures

    By Haijian Shi, Drew Pizzo

    This article focuses on the appropriate application of subsurface investigation methods for transmission structures, which are typically designed to resist lateral rather than vertical loads. Currentl

    Jan 1, 2018

  • SME
    Optimal Synthesis Of An Industrial Fluorspar Beneficiation Plant Using A Jumping Gene Adaptation Of Genetic Algorithm

    By C. Guria

    A modeling, simulation and optimization study of a complex industrial fluorspar beneficiation plant (Kadipani, Gujarat, India) with fourteen/ten flotation banks is carried out to find an optimum/near-

    Jan 1, 2009

  • AUSIMM
    Optimisation Challenges in Underground Mine Planning and Design

    Underground mine planning is characterised by a series of designs, starting with prefeasibility and culminating in operational. Information on the mineralisation and geotechnical conditions is availab

    Dec 6, 2010

  • CIM
    Optimisation des systèmes pelles–camions en utilisant la théorie des files d’attente

    By D. Komljenovic, J. Paraszczak

    "This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels

    Jan 1, 2004

  • AUSIMM
    Optimisation Improvements in Whittle using Stope Optimisation Software

    Mining One (M1) is often challenged with the task of evaluating deposits considering open cut and/or underground (UG) mining methods. In many near surface deposits a combination of both methods result

    Dec 6, 2010

  • AUSIMM
    Optimisation of a Semi-autogenous Grinding Mill through Trajectory and Power Modelling

    By P Toor

    Mill filling is an important operational parameter in a SAG mill circuit and by its control and optimisation it can produce significant improvements in production capacity and energy efficiency. Howev

    Sep 7, 2015

  • SAIMM
    Optimisation Of Anglo Platinum?s ACP Acid Plant Catalytic Converter

    By M. K. Sichone

    Anglo Platinum?s Waterval smelting complex based in South Africa operates the Anglo Converting Process (ACP) that produces SO2 offgas. This SO2 offgas is treated in a double-contact, double-absorption

    Jan 1, 2009

  • AUSIMM
    Optimisation of Blasting in a Large Open Pit Mine

    By Miles M. J, Sandy D. A

    It has long been known that drilling and blasting operations have a direct influence over productivity and costs of subsequent operations. If mine management is to effectively optimise blasting oper

    Jan 1, 1990

  • SAIMM
    Optimisation of Circuits for Pressure Leaching of Sulfide Ores and Concentrates

    By Fadeela Saloojee, Frank K. Crundwell

    "Pressure leaching is an option for copper recovery from chalcopyrite. Leaching takes place at high temperatures and pressures in the presence of an oxidising agent. This work shows how the performanc

    Jan 1, 2015

  • CIM
    Optimisation of Coke Breeze Addition in Iron Ore Pellets

    By G. Paquet, E. Godin

    "Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as

    Jan 1, 1986

  • IIMP
    Optimisation of Crushing and Grinding Circuits Using Steady-State Simulation

    By C. A. Brown

    "Steady-state simulation has been used for over 20 years to optimise the operation of crushing and grinding circuits. Throughout that period continuing comminution research has been the basis for impr

    Sep 12, 2005

  • AUSIMM
    Optimisation of Cut-off Grades During Design of Underground Mines

    The theory of declining optimimum cut-off grades is more than 25 years old, but for a number of reasons it is still not widely used in industry. A lack of faith in the veracity of estimated grades i

    Jan 1, 1991

  • AUSIMM
    Optimisation of Electrowinning Operations at Girilambone Copper Mine

    By Braaksma M, Dudley K

    The Girilambone Copper Mine is located in central New South Wales and has been operational since May 1993. Girilambone is operated by the Girilambone Copper Company (GCC) which is a joint venture b

    Jan 1, 1996

  • CIM
    Optimisation of Flotation Pulp Selectivity Utilising Nodal Analysis

    By Kym Runge, Emmy Manlapig

    "The objective of an industrial flotation circuit is to separate valuable minerals from non-valuable minerals utilising differences in their flotation recovery rate. Regrinding and reagent addition ar

    Jan 1, 2004

  • AUSIMM
    Optimisation of Length of Retreat Longwall Faces

    By Misra A

    After review of the status of research on optirnisation of retreat longwall faces it is argued that an acceptable optimisation model must be based upon realistic cost data that take into account not o

    Jan 1, 1995

  • AUSIMM
    Optimisation of Rock Disintegration Based on Acoustic Background of Drilling Machine

    By J Fut=

    The rotary drilling of rocks is widespread technology in mining and in tunnelling. The paper describes the results of research by aim to find relationships between optimal drilling and sound signal of

    Jan 1, 2003

  • SAIMM
    Optimisation Of SiMn Production At Transalloys

    By J. Griesel, P. H. F. Bouwer, K. Bisaka

    Transalloys produces 160 000 tons of SiMn per annum from five AC submerged-arc furnaces. The lime-ore melt from two AC open-arc furnaces is contacted with SiMn to produce 50 000 tons of medium carbon

    Jan 1, 2004

  • SME
    Optimisation Of Single-Layer Cover Made Of Desulphurized Tailings: Application To The Doyon Mine

    By I. Demers

    Doyon mine, Quebec, Canada evaluates the possibility of desulphurizing their tailings to produce material to be used in as cover over the acid generating tailings disposal site. Laboratory tests were

    Jan 1, 2008

  • SAIMM
    Optimisation Of Specific Power Consumption In The Production Of Ferro Alloys Through Rationalisation Of Charge Distribution

    By S. Ranganathan

    Production of ferro-chromium in the submerged-arc furnace is highly energy-intensive. Several process rates have been attempted to reduce the specific energy consumption in the production of this allo

    Jan 1, 2007

  • AUSIMM
    Optimisation of Spray Collers for Cooling Deep Coal Mines

    By Hagen G, Uhlig H

    In the Federal Republic of Germany the thermal environment in underground coal mines has deteriorated progressively over the past years. The number and capacity of refrigeration plants have increa