Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Expanded Rock Blast Modeling Capabilities of DMC_Blast, Including Buffer BlastingBy Dale S. Preece, J Paul Tidman, Stephen H. Chung
"A discrete element computer program named DMC-BLAST (Distinct Motion code) has been under. development since 1987 for modeling rock blasting (Preece & Taylor, 1989). This program employsexplicit time
Jan 1, 1997
-
Chalcocite Oxidation and its Influence on Fine Copper Recovery at the Ok Tedi Concentrator Papua New GuineaBy Grano S. R, Lauder D. W
Investigations on the oxidation behaviour of chalcocite and its rejuvenation by hydrogen sulphide ion have been undertaken. Chalcocite oxidation was measured using X-ray photoelectron spectroscopy (
Jan 1, 1997
-
World Nuclear Energy in Relation to AustraliaÆs UraniumIn the last 40 years nuclear energy has taken its place as a major source of electricity worldwide. It now produces 17 per cent of the world's electricity and could conceivably produce a higher
Jan 1, 1997
-
Soil-Cement Pile Foundations For A Large Storage Tank And Retaining Wall - Case History - SummaryBy Roy A. Bell
A 200-foot diameter, 72-foot high petroleum storage tank was built in a hillside ravine where a portion of the site contained soft clay fill. Soil-cement piles, 40 inches in diameter and up to 38 feet
Jan 1, 1997
-
Hilltop Interceptor Contract G Storage and Conveyance Tunnel Cleveland, OhioBy Thomas Sisley, Jozef Zurawski, Richard Switalski
Hilltop Interceptor Contract G is one of the segments of the wastewater control system in the greater Cleveland area. The tunnel is a relief interceptor constructed by the Northeast Ohio Regional Sew
Jan 1, 1997
-
Jameson Cell Developments at Philex Mining CorporationBy Murphy A. S, Budod A
The Philex concentrator represents the first time Jameson Cells have been used in a cleaner scavenger application or in large scale flotation in roughing and scavenging. This necessitated a major ch
Jan 1, 1997
-
Rock Tunnels Recently Completed In ChicagoBy Joseph Irons, David Westfall
Three rock tunnel sewer systems are underway in the Chicago Area. (Figure 1) The three are designed to act independently and to be later connected to the future tunnels of the master plan. The tunnel
Jan 1, 1997
-
A Comparison of Open Circuit versus Closed Circuit SAG Milling at the Williams MineBy David Evans, David Barnes, Robert Raponi
"The Williams Mine processes, on average, 6,450 t/d of gold bearing ore using two parallel grinding circuits, leaching and C.1.P., carbon stripping, electrowinning and refining. At present, each grind
Jan 1, 1997
-
Reply To N.M. Vegter ?Discussion On The Kinetics Of The Elution Of Gold From Activated Carbon? - In The Journal Of SAIMM, Vol. 97. 1997. Pp. 197?200By M. J. Nicol
Mr Vegter has analysed, in some depth, the approximations made in the treatment of the kinetic data presented in the original by ourselves (ref.1) and has come to the conclusion that ?under the experi
Jan 1, 1997
-
TARP — The Des Plaines Tunnel System (North Leg) A Case HistoryBy Robert Rautenberg, Paul McDermott
This paper will discuss the construction of 15.9 km (9.88 mi) of tunnels on a project in Chicago, Illinois. The tunnels were driven utilizing two rock and four soft ground TBMs ranging in sizes from 7
Jan 1, 1997
-
Review of Autoclave Technology ApplicationsBy Linda Dufour
"Autoclaves have been in commercial use in the mining industry since the early 1950's the initial applications included tin, uranium, cobalt, nickel and copper extraction under both acidic and alkalin
Jan 1, 1997
-
Mill Project Development at El Limon, NicaraguaBy Steve Hubbard, Brad Marchant, Rolando Cuadra
"Triton Mining Corporation acquired the rights to Mina El Limon in Nicaragua in 1993 by international bid. The bid included the gold operations at Limon and an exploration concession of approximately
Jan 1, 1997
-
Kelian Case StudyBy Barlow S
The Kelian Gold mine project won two excellence awards from the Victorian Division of the Institution of Engineers, Australia. It was a challenging project, fast tracked in a remote and inhospitabl
Jan 1, 1997
-
Stress Analysis and Design of Tunnel LiningsBy Ching L. Wu, Joseph Penzien
An analytical procedure is presented for evaluating the stresses in linings of bored tunnels caused by kinematic soil-lining interaction. Three cases of interaction as produced by the following condi
Jan 1, 1997
-
Development And Large-Scale Testing Of Innovative Tunnel Support SystemsBy Robert M. Semple, Harvey W. Parker
INTRODUCTION Two promising innovative tunnel support systems are being developed by the Civil Engineering Department of the University of Illinois. One of these is a lining which can be placed by a
Jan 1, 1997
-
Flotation Process Response of Ok Tedi Flourine Bearing MineralsBy Manlapig EV, Mackinnon IDR, Laudr DW
Orebodies at Ok Tedi contain a number of different fluorine bearing minerals. Some of these minerals report to concentrate and are responsible for the presence of the penalty element, fluorine, wit
Jan 1, 1997
-
Chemical Consolidation In A Mixed Face TunnelBy Terence G. McCusker, E. Roy Anderson
A four-mile length of interceptor sewer tunnel in Manhattan has finished sizes ranging from 10'6" to 14'6" horseshoe. Mixed face conditions were anticipated in three areas and encountered in
Jan 1, 1997
-
The Rainfall Simulator for Hydrolic and Erosion Experiments on Mines, with an Example of its Application at Ranger Uranium Mine, Northern Territory, AustraliaBy F Hancock
A rainfall simulator was developed to assist with hydrogeomorphic research into the stability of engineered landforms associated with rehabilitated uranium mines in the Top End of Australia. It can be
Jan 1, 1997
-
Seismic Exploration Applied To Underground Excavation ProblemsBy R. W. Mossman, George E. Heim
Seismic exploration techniques offer the engineer and geologist a way of obtaining detailed information on the physical parameters and geometry of the rocks where extensive underground excavation or t
Jan 1, 1997
-
Materials Handling-A Vital Link In Rapid ExcavationBy A. T. Yu
Two key components make up the core of a rapid excavation operation. They are: the breaking up of the rock and its removal. Owing to the complexity inherent in mechanical rock-breaking and the relativ
Jan 1, 1997