Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Kisoro-Kabale iron ore project in south-western Uganda – unlocking a new high-grade iron ore region for exploration and development

    By B Vietnieks, N Widmer, L White, E Tata, J Natukunda, D C. Ilouga, J P. Tyler

    The Republic of Uganda aims to exploit its’ significant, un-developed iron ore resources to supply the required raw material for developing its’ iron and steel industry across all the stages of the su

    Sep 18, 2023

  • AUSIMM
    Pilot Scale Testing of Australian Coals for Nox Emmisions

    The pilot scale testing of Australian coals for their NO, emissions was carried out at the ACTC to investigate the influence of coal properties, furnace conditions and different NO,, control strate

    Jan 1, 1991

  • AUSIMM
    High Temperature Interactivity of Iron Ores in the Cohesive Zone of the Blast Furnace

    By X L. Liu, W Huang, J M. Zhu, S L. Wu

    The shape, position and thickness of the cohesive zone have a great influence on the operational performance of the blast furnace. Many researchers have found that the high temperature properties of i

    Jul 13, 2015

  • AUSIMM
    The Brukunga Pyrite Mine ù A Field Laboratory for Acid Rock Drainage Studies

    By R C. Cox

    The Brukunga pyrite mine was operated from 1955 to 1972 to supply feedstock for sulfuric acid production in the South Australian fertilizer industry. Iron sulfide ore, mined by Nairne Pyrite Ltd, was

    Jan 1, 2003

  • AUSIMM
    A Statistical Approach for Deriving Project Design Rainfall

    By R Millar

    A frequent challenge in mine water management and mine design is estimation of precipitation and extreme rainfall given a short record of site meteorological data. For remote mine projects, typically

    Nov 26, 2013

  • AUSIMM
    Supervisory Control of Bass Strait Oil and Gas Production

    Esso-BHP have installed a Production Supervisory Control System that is presently controlling the offshore oil and gas facilities on the Barracouta and Marlin platforms from an onshore master station

    Jan 1, 1970

  • AUSIMM
    Directional Blasting Rock Cutting Technology

    By W Z. Liu, Q Q. Shi, H T. Yang, X L. Zhang

    In order to improve the cutting blasting effect of dimension stone mining, the water coupling directional cutting blasting technology was put forward. Based on the test apparatus and special charge co

    Aug 24, 2015

  • AUSIMM
    Can We Live Up to the Capacity Expectations WeÆre Predicting for Our Iron Ore Export Corridors?

    By P McGavin, R von Varendorff

    With the economic trend towards reduced capital spend, more stakeholders are focusing on improved operational efficiency and productivity. Advancements in achieving the optimum dollar-per-tonnage will

    Aug 12, 2013

  • AUSIMM
    Results from a Preliminary Investigation of Particulate Emission During the Sintering of Iron Ore

    By J Manuel, A Trudu

    Regulations on the emission of particulates from sinter plant stacks are becoming increasingly stringent and reducing these emissions by improving gas cleaning systems is a significant cost to the sin

    Jan 1, 2002

  • AUSIMM
    Passivation effect of immobilised ferric (hydroxy-)xanthate upon calcium/magnesium precipitates on the pyrite depression in alkaline conditions

    By T Suwa, S Ishida, J Xue, S Fuchida, H Shimada, Y Aoki, C Tokoro

    Pyrite depression with prolonged pre-conditioning treatment in high salinity water has attracted much of researchers’ interest in recent years considering the increased utilisation of multiple stage f

    Aug 24, 2022

  • AUSIMM
    New Ore Types from the Cauê Banded Iron Formation, Quadrilátero Ferrífero, Minas Gerais, Brazil – Responses to the Growing Demand

    By L Q. Amorim

    The mining district of the Quadrilátero Ferrífero (QF) in southeastern Brazil contributes to 70 per cent of the Brazilian iron ore production, which reached 370 Mt in 2010. Traditionally, four iron or

    Jul 11, 2011

  • AUSIMM
    Integrated Drill and Shovel Performance Monitoring Towards Blast Optimization

    By Scoble M, Peck J

    This paper reviews the instrumentation and monitoring of blasthole drills and electric mining shovels at a surface coal mine in western Canada. The drill monitoring component involved the developmen

    Jan 1, 1990

  • AUSIMM
    Benchmarking - Making Best Practice Common Practice

    By S Williams

    The primary objective of most mining projects is to maximise the value delivered to the companyÆs shareholders. Achieving best practice performance and maintaining competitive advantage through low-co

    Jan 1, 2009

  • AUSIMM
    The Decision of Stationarity in Modern Resource Estimation

    By B J. Wilde

    Evaluating the resources and reserves in a mineral deposit requires many interdependent subjective decisions. The decision of stationarity is arguably the most important. This decision includes: the

    Sep 26, 2011

  • AUSIMM
    Sirosmelt Investigation - An Example of Process Evalutaion Techniques

    By Nilmani M, Malone J, Taylor RN, Floyd JM, Gray NB, Fountain CR

    CSIRO staff and University of Melbourne staff and students collaborated in an intense programme of investigation on the CSIRO 50 kg Sirosmelt pilot plant.In two days of operation copper matte converti

    Jan 1, 1985

  • AUSIMM
    The Impact of Facility Construction and Scale on the Characteristics of Experimental Coal Dust Explosions

    By G Collecutt, T O’Beirne, D Humphreys, J Greenwood

    Much of our knowledge of the behaviour of underground coal dust explosions has been derived from less than full-scale experimental explosions in facilities as small as 0.25 m diameter pipes. Although

    Aug 31, 2015

  • AUSIMM
    Discovery Performance for Gold and Base Metals in the Pacific/South-East Asia – 2005–2014

    By R C. Schodde

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Over the last decade (2005–2014), a total of 439 significant deposits of gold and base meta

    Mar 18, 2015

  • AUSIMM
    Evaluation of the Ernest Henry Cu-Au Deposit Mineral Resources

    By A J. Ryan

    The Ernest Henry copper-gold Mineral Resource is the major asset heldby Ernest Henry Mining Pty Ltd, comprising A$6.4 billion of containedmetal. The case history presented below describing the evoluti

    Jan 1, 1998

  • AUSIMM
    Application of Fine Mesh Screens for Dust Suppression in Mine Transport Roadways

    By Todd S, Lam K, Hewitt A

    A series of field experiments investigated the perfonnance of fine mesh curtain screens which were used to suppress coal dust in a transport roadway of a New South Wales colliery. Four types of screen

    Jan 1, 1991

  • AUSIMM
    Removal of Bismuth from Copper by Vacuum Refining

    By Pollard DM, Willis GM

    The removal of bismuth from liquid copper in a vacuum furnace was studied over a range of pressures. The rate determining step changes from diffusion in the gas at pressures above 0.2 Torr to appr

    Jan 1, 1980