Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Murrin Murrin Heap Leaching Project

    By N Meadows, M Rodriguez

    A 200 000 tpa heap leach demonstration plant was approved by the Murrin Murrin Joint Venture (MMJV) in December 2005 and engineering commenced in January 2006. The demonstration plant will utilise sto

    Jan 1, 2006

  • AUSIMM
    Misima Gold Mine – A Case Study in the Use of Historical Data for an Updated Mineral Resource Estimate

    By C Switzer, R Logan, S Konopa, P Stoker, R Lewis

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Misima gold mine, located on Misima Island within the Milne Bay Province of Papua New G

    Mar 18, 2015

  • AUSIMM
    An Investigation of Current Flotation Survey Sampling

    By D Laskovski, T Nguyen

    Flotation surveying can be an extremely powerful means of determining opportunities for circuit optimisation and benchmarking. The type of survey employed depends heavily on the nature of the informat

    Jul 29, 2014

  • AUSIMM
    On-site Process Mineralogy – Linking Departments and Disciplines with the Common Goal of Increasing Plant Performance

    By D Morgan, K Jones

    "In March 2015 Northparkes Mines (NPM) installed a process mineralogy facility on-site. The laboratory included a TESCAN TIMA scanning electron microscope (SEM) and was the first SEM facility to be co

    Oct 10, 2016

  • AUSIMM
    Control of Water Discharge From Mine Ventilation Shafts

    Problems caused by water discharge from surface mine ventilation shafts can be significant and are usually unforseen. The discharged water is often hyper-saline or acidic and can cause environmental d

    Jan 1, 2002

  • AUSIMM
    Moriarty was a Conglomerate – Experiences and Implications of Coal Mining under Massive Strata in the Newcastle Coalfield

    By M Creech

    During the 1990s, wider and more productive longwall panels were being introduced into the Newcastle Coalfield. The strata of the Newcastle Coalfield incorporate numerous massive sandstones and conglo

    Aug 18, 2014

  • AUSIMM
    An Integer Programming Model for Optimisation of a Heavy Media Coal Preparation Plant

    By J Zhou

    This paper discusses the implementation of a mixed integer linear programming model for a coal preparation plant. The plant considered consists of primary and secondary heavy media cyclones, hydrocycl

    Sep 26, 2011

  • AUSIMM
    An Investigation of the Corrosive Impact of Groundwater on Rock Bolts in Underground Coalmines

    By P Craig, A Crosky, P C. Hagan, E Elias, B Hebblewhite, S Saydam, D Vandermaat

    "Premature failure of rock bolts has been recorded at twelve underground coalmines over the past 15 years in Australia. Over the last four years, UNSW Australia has been conducting an Australian Resea

    Nov 5, 2014

  • AUSIMM
    A Multidisciplinary Approach to the Optimisation and Control of a Copper-zinc Grinding and Flotation Circuit

    By D Hatton, S Wilson, F Orrante, M Taghimohammadi, F van der Walt, N Arslan, M Westcott

    "Cayeli Bakir Isletmeleri is an underground copper-zinc mine in turkey. The ore is highly variable with feed grades ranging from 1–4 per cent copper and 1–10 per cent zinc. Due to this variability, or

    Oct 10, 2016

  • AUSIMM
    Measurement of Residual Shear Strength Using a Modified Direct Shear Apparatus

    By L Tatnell, R Mackay, A Tolooiyan

    The multi-reversal direct shear test (MRDS) method is commonly used to measure the residual shear strength of soils. However, when the standard direct shear (DS) apparatus is used, the MRDS method is

    Nov 5, 2014

  • AUSIMM
    A Logical Approach to Determination of Density and Porosity Values for Iron Ore Deposits

    The importance of the accurate determination and interpretation of the bulk density and porosity of a given iron ore deposit is very often disregarded or neglected. Large amounts of time and money are

    Jan 1, 2007

  • AUSIMM
    Building a Geometallurgical Model for the Canahuire Epithermal Au-Cu-Ag Deposit, Southern Peru - Past, Present and Future

    By M Dusci, A Trueman, S Poos, R Baumgartner, M Brittan

    The Canahuire epithermal Au-Cu-Ag deposit in southern Peru is a complex and challenging deposit for metallurgical studies. It has issues of gold locking in sulfides and non-sulfides, deleterious eleme

    Sep 29, 2013

  • AUSIMM
    A Comparison of Skip Loading Systems from an Operational, Maintenance, Safety and Capital Cost Estimate Perspective

    By A E. A Northcote

    The drive to maximise performance, reduce maintenance times, improve safety of operation and maintenance on mining equipment while keeping both operational and capital costs down has provided good nou

    Mar 21, 2011

  • AUSIMM
    Comparison of heat, noise and ore handling capacity of battery-electric versus diesel LHD

    By C McGuire

    As mobile equipment electrification in underground mining continues to gain popularity, control ofheat and humidity in the workplace is becoming a key driver in sizing of ventilation and mine aircooli

    Oct 12, 2022

  • AUSIMM
    Social Licence to Close?

    By J A. Braithwaite

    Social licence to operate is not a new concept for the mining industry, referring to stakeholder approval or acceptance for the activities and impacts of a project, company or industry. It is intangib

    Jun 28, 2016

  • AUSIMM
    Will Your Mine Require Cooling?

    By A S. Derrington

    In some parts of Australia, mine air cooling may not be needed until a depth of 1300 m below surface is reached. In other locations, it may be essential at a depth of only 300 m below surface. The rea

    Mar 24, 2014

  • AUSIMM
    The Negotiated Compressed Process (NCP) (An Alternative Approach to Contracting Practices)

    By Benson R. P

    Building a new tunnel to accommodate CN North America's needs or double stacked container traffic for the next 100 years represents new and unprecedented challenges. Innovative approaches to cont

    Jan 1, 1993

  • AUSIMM
    The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging Conditions

    By V Gumba, S Narendranathan, C Barker, R D. H Thomas, G P. Bungard

    This paper presents the positive outcomes on an EPCM project, which was undertaken in a challenging environment, whereby the design team had to generate a design with a number of stringent serviceabil

    Sep 18, 2012

  • AUSIMM
    Carbon distribution behaviour between molten iron and CaO-Al2O3-FeOSiO2- MgO slag at 1873 K

    By G H. Park, Y J. Jun, J H. Park

    The carbon solubility of the CaO-Al2O3-FeO-SiO2-MgO slag, the main system formed in the Ruhrstahl-Heraeus (RH) vacuum degasser, was measured at 1873 K to understand the effect of slag compositions on

    Jun 19, 2024

  • AUSIMM
    Dredger drop impact on slope stability – Hazelwood Mine

    By J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4

    ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du

    Jun 21, 2022