Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The effect of FeO/SiO2 ratio on the feasibility of utilising iron silicate slags as supplementary cementitious materials
By R A. Anand, N N. Viswanathan, M M. Pande
Slags are the most voluminous solid by-products generated in pyrometallurgical operations, and, as such, finding an application for these oxidic materials is pertinent to maintaining resource efficien
Jun 19, 2024
-
Implications of the Carbon Price and Developing a Carbon Strategy
By P Holt, M Allen
On the first of July, 2012, the Australian GovernmentÆs Clean Energy Act commenced. From this point, a price of $23/t of CO2-e will apply to facilities that trip the liability threshold. This first pa
Nov 20, 2012
-
Impacts of thrust faulting at Goonyella Riverside Mine
By H S. Pescini
A material aim when feeding ore blends into a processing facility is to reduce the variability of the properties of the feed material and to maximise the output, or throughput. At the Mining Geology c
Mar 22, 2022
-
The Floatability Characterisation Test Rig as a Pilot Plant for Flotation Testing ù An OperatorÆs Viewpoint
By J-P Franzidis, M Esvelt, E V. Manla
The Floatability Characterisation Test Rig (FCTR) is a self-contained, highly instrumented, mobile pilot plant that is able to treat up to 2 tph solids. It consists of a bank of six 130 L WEMCO« Smart
Jan 1, 2003
-
Advances in Flotation Process Control at Porgera Gold Mine Using JK FrothCam Imaging Technology
The Porgera gold mine has made significant progress with the successful installation of a JK FrothCam image analysis system. The system is used to measure and control froth velocity on the scavenger c
Jan 1, 2003
-
Dynamic Simulation as a Test Bed for Emerging Technologies
The adoption of new technologies is accompanied by risks that the stakeholders will wish to understand and minimise. The process of developing a dynamic simulation and the plant it will be used in pro
Sep 26, 2011
-
Hy3 (Hy-cube) project – Hyundai Steel’s carbon neutral strategy
By H Kim, M J. Sun
In order to reduce carbon emissions from the steelmaking process and achieve carbon neutrality, global steel companies are establishing their own medium to long-term strategies and implementation plan
Jun 19, 2024
-
Fimiston Open Pit
By Neill A, O&apos
The City of Kalgoorlie/Boulder is situated approximately 600 kilometres to the east of Perth (Fig. 1), and is the major regional centre of the Eastern Goldfields, supporting a population of approxim
Jan 1, 1991
-
Unmanned Aerial Robots for Remotely Operated and Autonomous Surveying in Inaccessible Underground Mine Voids
By A Grace, C Sennersten, T Taylor, A Davie, R Lyu, D Pentecost, C A. Lindley, J Craig, L De Macedo Camargo
Many underground mine void spaces are not suitable for human entry due to unprotected roofs, instability or having an unknown safety state (eg if they are many decades old). Investigations of these vo
Nov 4, 2015
-
A Multiple Blasthole Fragmentation Model – Its Concept, Formulation, Capability and Field Comparison Examples
By R Yang
This paper presents a fragmentation model for large production blasts in an open pit or underground environment. The paper shows that the particle velocity is directly related to pressure, strain, and
Aug 24, 2015
-
The MRMR Rock Mass Rating Classification System in Mining Practice
By D H. Laubscher
The in situ rock mass rating system û IRMR - leading to the mining rock mass rating system - MRMR - for jointed rock masses has been used (and abused) in mining operations around the world for the pas
Jan 1, 2000
-
Lihir Gold Five Years On ù Maximising Throughput and Capital Utilisation
During the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future
Jan 1, 2003
-
Procuring Control and Intelligent Traffic Systems for Major New Build Projects – Avoiding Pitfalls and Maximising Value
By G M. Taylor
The application of high technology to monitor and control fire life safety, critical functionality in tunnels and underground spaces generally has progressed at an ever accelerating rate over the past
Sep 17, 2014
-
The Role of the Mines Rescue Station in Ignitions, Explosions and Fires at Mines
The Southern Mines Rescue Station (S.M.R.S.) has been established for 55 years and in the past 15 years has had only 4 major call-outs. Whilst the mines rescue training program has continued to exp
Jan 1, 1981
-
Sensitivity of Air Volume Outputs to Changes in Resistance of Side Branches in a Mine Ventilation Network
By Kolarczyk M
When controlling the ventilation process in a deep mine some knowledge of the sensitivity of the air volume output to changes in the resistances of network side branches is of great advantage.Sen
Jan 1, 1988
-
Visualisation of calculated thermodynamic properties by integration of FactSage™ with SEM-EDS element maps
By S Mitra, D O’Dea, N Barrett, T Honeyands, E Copland
This work describes a novel mapping technique that allows the direct overlay of calculated local phase equilibria on micrographs of the physical system. The technique demonstrated integrates FactSage™
Jun 19, 2024
-
Adjusting Initiation Direction to Domains of Rock Mass Discontinuities in Aitik Open Pit Mine
By N Johansson, D Johansson, A Beyglou, H Schunnesson
As demand for optimisation of mining processes increases, more attention is drawn to blast performance and fragmentation improvement. Fractures and discontinuities are among the most influential facto
Aug 24, 2015
-
Interacting with the Daily Operations and the Need to Plan for Future Rehabilitation
Mine site rehabilitation is the repair of the disturbance caused by mining on the immediate mining area and also on the surrounding environment. The long-term objectives of rehabilitation can vary fro
Jan 1, 2007
-
A Case for Change - Defining Mine Sealing and Understanding Flammable Mixtures During Sealing
By A Mackay
As a result of the explosion in the 512 panel at the Moura No 2 mine in 1994 the role of the ventilation officer (VO) to submit sealing plans (on behalf of the operator/underground mine manager) has b
Jul 1, 2013
-
Characterisation of respirable dust generated from full scale laboratory concrete cutting tests with conical picks at three stages of wear
By S Slouka
Airborne rock dust poses serious long-term health complications to workers in the underground mining and civil environment where rock excavation is utilised. During drilling, airborne rock particles a
Oct 12, 2022