Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    The H. B. Concentrator

    By H. J. Chalmers

    THE H.B. MINE and concentrator are located in the Nelson Mining Division of British Columbia, on the north side of the Sheep Creek valley about seven miles southeast of the town of Salmo. It is an ope

    Jan 1, 1957

  • CIM
    Bridging the Gap Strategy to Execution

    PERSPECTIVE ?Natural resources exploration, extraction and beneficiation is complex and challenging: ?Input costs rising, complexity increasing, rising stakeholder management needs, regulatory compl

    May 1, 2013

  • CIM
    Traitement des eaux contaminées - Mine Restigouche, Nouveau-Brunswick

    Plan de l?exposé ?? Présentation du site de la mine Restigouche et du mandat confié à Genivar ??Dénoyage de la mine ??Processus d?enlèvement des boues au fond de la fosse ??Utilisation de Géotubes

    Feb 1, 2008

  • CIM
    Increasing Sag Mill Capacity at the Copper Mountain Mine through the Addition of a Pre-Crushing Circuit

    By Dave Rose, David G. Meadows, Mike Westendorf

    "Copper Mountain’s concentrator was commissioned in May 2011. The circuit consists of a 34’ x 20’ EGL SAG mill, a Raptor 900 pebble crusher and two 24’ x 39’6” ball mills. Each mill is equipped with a

    Jan 1, 2016

  • CIM
    Environmental monitoring at mine sites — Future directions

    By K. Himbeault, D. Campbell, N. C. Garisto, D. A. Orava, A. Rosaasen

    "The level of scientific knowledge about the effects of contaminants is increasing and changes in environmental monitoring are likely to allow for the assessment of environment effects particularly to

    Jan 1, 2000

  • CIM
    Development of an Iron Ore Concentrate Fines Recovery Process from Copper Tailings

    By Lutz Markworth, Fernando Parra, Wolfram Jaspers

    "The worldwide demand of iron ore and the depletion of the high-purity deposits make it necessary to recover ores in increasingly fine size fractions or low Fe content in the feed material. Impurities

    Jan 1, 2008

  • CIM
    Noise -Its Effect and Control in Mining Operations

    By A Walker

    The presence of high noise levels in many industries, together with the fact that countries are becoming increasingly concerned with the health of its citizens, has contributed to the importance of th

    Jan 1, 1963

  • CIM
    An Integrated Approach to Managing Asset Revamp Shutdown Projects

    By M. Santaluce

    "The revamp of critical process assets that require a significant plant outage (shutdown) presents a unique and demanding set of challenges for plant operators. They are executed in a more complex Bro

    Jan 1, 2015

  • CIM
    Development of AERO® MX3048 Promoter for MMG Sepon Concentrator, South Central Laos

    By Tony Moore, Peter Riccio

    "MMG (Minerals and Metals Group) operates the LXML Sepon’s mineral processing facility located 40 kilometers north of the town of Sepon, in the Savannakhet Province, Lao PDR. The Sepon copper plant pr

    Jan 1, 2011

  • CIM
    Review of 2004 JORC Code and Comparison with National Instrument 43-101

    By Patrick R. Stephenson

    The current version of the JORC Code was issued in 2004 and since that date the Australian Securities Exchange, in collaboration with JORC, has issued a number of companies? updates to provide guidanc

    May 1, 2010

  • CIM
    The Performance of Mesh, Shotcrete and Membranes for Surface Ground Support

    By E. C. Morton

    The Western Australian School of Mines (WASM) has developed a facility for the static testing of large scale ground support elements. The samples are loaded using a mechanical screw feed jack. Instrum

    May 1, 2009

  • CIM
    Structural Control of Mineral Deposits in Southeastern Manitoba

    By C. H. Stockwell

    "The Precambrian rocks of southeastern Manitoba contain a great variety of mineral deposits, including gold, chromium, copper, nickel, lithium, tin, beryllium, tungsten, and molybdenum. Although consi

    Jan 1, 1954

  • CIM
    Building stakeholder trust through a credible ESG strategy and implementation plan

    By Morgan Schauerte, Laura Raimondi, Mariel Palomeque

    Executives in the mining industry are facing dramatically changing market expectations on reporting and transparency regarding the environmental and social impacts of projects, supply chains and produ

    Jan 1, 2023

  • CIM
    Optimization of Water Supply and Reutilization in Base Metal Processing in Dry Regions

    By Raymond Philippe

    Background ?Hatch Water has worked with most major mining companies in Chile on water supply and optimization projects ?Many(copper) mining projects are located in Northern Chile, which hosts the

    May 1, 2009

  • CIM
    An Instrumented Laboratory Cell for Gold Cyanidation Modelling

    By M. Kane, B. Bissonnette, D. Hodouin

    "A laboratory cell has been designed for a careful investigation of gold ore cyanidation using mathematical modelling of the process kinetics. The cell is a stirred vessel with continuous monitoring a

    Jan 1, 1990

  • CIM
    Novel Dewatering Aids for Mineral Concentrates and Coal

    By M. Kerr, Petra Lampinen, Jinming Zhang, Petra Brodin, C. Hull, Nils-Johan Bolin, R. Asmatulu

    "According to Darcy’s equation, the rate of dewatering varies as inverse square of the surface area of the particles to be dewatered and is proportional to the pressure drop across a filter cake. Thus

    Jan 1, 2005

  • CIM
    Comparison of the Material Properties of In situ and Laboratory Prepared Cemented Paste Backfill

    By Kim Le Roux

    Cemented paste backfill (CPB) is a relatively new material that is increasingly being used in open stope mining across the world. The advantages offered by this high density tailings backfill include:

    May 1, 2002

  • CIM
    Stope Stability Monitoring at the Goldex Mine

    By Patrick Frenette

    The Goldex Mine is an underground gold mine using a unique mining method where a single very large stope is being created. In order to maintain stability of the walls and roof of the stope which is 45

    May 1, 2011

  • CIM
    The Impact of Commissioning and Start-Up Performance on a Mining/Metallurgical Project

    By Jan E. Nesset, Phillip J. Mackey

    "Studies have shown that there is a correlation between commissioning and start-up time, i.e. time to reach full plant design capacity, and the degree of innovation and technical/engineering uncertain

    Jan 1, 2003

  • CIM
    McKenzie Red Lake Gold Mines, Limited

    By The Staff

    THE property of McKenzie Red Lake Gold Mines, Limited, consists of eleven claims located on McKenzie island in Red lake. The mine is about 4,Y:l miles by water from the Howey townsite on the same lake

    Jan 1, 1938