Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Axial Pile Displacement Evaluations From Seismic Piezocone Data And Back-Analysis Of Load TestsBy Fawad S. Niazi
Ever since the use of the cone penetration test (CPT) in geotechnical practice, attempts have been made to correlate CPT parameters with pile capacity components of unit end bearing (qb) and unit shaf
Jan 1, 2011
-
Analyzing the Load-Transfer Behavior (T-Z Curve) for Instrumented Test Piles Driven in Clayey SoilBy Murad Y. Abu-Farsakh
This paper presents the analyses of load-transfer (t-z) behavior of twelve prestressed concrete (PSC) instrumented test piles that were driven in different locations of Louisiana. The load transfer me
Jan 1, 2018
-
Vessel Collision Design - Risk Analysis And Deep Foundation Issues For Bridges Over Navigable WaterwaysBy Michael A. Knott
Large lateral forces on bridge foundations due to extreme events such as vessel collisions, earthquakes, and wave forces on storm surges during hurricane events are often the controlling design condit
Jan 1, 2013
-
A Critical Appraisal Of Is-Code Provisions For Pile Design ? SynopsisBy N. Som
The pile capacity in cohesive and granular soils depends on a number of parameters. The values of these parameters as recommended by Indian Standard Code of Practice vary over wide ranges. A designer
Jan 1, 1996
-
Application Of Bu-Type Steel Sheet Pile On Construction Of Ports ? PrefaceBy Zhou Lu-Jian
The Port of Shekou is situated at Shenzhen Bay on the east bank of Lingding Ocean. Its coastline is about 6 km long and the water depth near the shore is Favourable. Across the bay is the ' New T
Jan 1, 1991
-
The Analysis And Computation Of Soil-Pile (Wall) Interaction For Deep Excavation Of High-Rise BuildingBy Lu Peiyan
A computation model of soil-pile (wall) interaction under lateral loading is presented in this paper. The model has been applied to some engineering projects, and the comparison between computation re
Jan 1, 1991
-
Caisson Design And Construction Challenges On The New Tiger Stadium Project - SummaryBy Fritz J. Klingler
From site demolition, to design, to construction, Detroit's new Tiger Stadium project is required to be completed within a short 2 ½ years from award of the design-build contract. Such extreme sc
Jan 1, 1999
-
Installation Of Augered Cast-In-Place Piles (3e8ab035-87ca-4b14-9759-c57d4f787aa0)By Tracy Brettmann
Equipment ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2004
-
The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff WallBy Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers
Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM
Jan 1, 2019
-
Seismic Hazards Evaluation and Lateral Pile Design in Diatomaceous EarthBy Arash Khosravifar, Matt Steffan
An expansion of the City of Klamath Falls Wastewater Treatment plant required geotechnical seismic hazard evaluations and deep foundation design. The site is located on the shore of Lake Ewauna and is
Jan 1, 2018
-
Fundex - Deep Foundation Institute Tensile Pile Test Seminar - September 9 & 10, 1993 - IntroductionAfter the Loma Prieta Earthquake, which caused major damage to viaducts in the Bay Area, the California Department of Transportation set up a test programme for foundation piles. Funderingstechnieken
Jan 1, 1993
-
Getting Paid In Hard Times - I. Formation Of The ContractBy Dennis J. Riley
A. This outline addresses what a sub-contractor, or a subsub-contractor should do to get paid in the event the general contractor or building owner files for bankruptcy. B. Negotiating payment ter
Jan 1, 1991
-
Hydraulic Impact Pile Hammers ? BackgroundBy Patrick Bermingham
The advancement of hydraulic impact hammers has followed the general advancement of hydraulics. The construction industry has been revolutionized by the application of hydraulics in excavators, cranes
Jan 1, 1987
-
Single Pile Settlement Prediction And Analysis For Driven PilesBy David R. Beadman
The Fleming method is widely used for the analysis and prediction of single pile behaviour under maintained loading. The method does not distinguish between bored and driven piles. Driven piling avoid
Jan 1, 2006
-
Deep Vibrocompactation By Stone Columns And Liquefaction InvestigationBy P. Ventura
Reliability of the liquefaction analysis is based on data plotted as by piezocone, as by deep vibrocompactation monitored tests. The negative porewater pressure, re lated to hydrostatic value, recorde
Jan 1, 1989
-
Soil Damping In Saturated Sandy Soils For Determining Capacity Of Piles By Wave Equation AnalysisBy Mark R. Svinkin
This paper deals with application of the wave equation analysis to determine capacities of piles driven in saturated sandy soils. It shows that pile capacity in sandy soils changes with time after the
Jan 1, 1995
-
Recent Advances In Large Diameter Diaphragm Wall ShaftsBy Benoit Virollet
Over the last 10 years the diameter of unbraced, unlined and unanchored circular shafts has grown dramatically in many parts of the world. This progress has taken place through improvements in: constr
Jan 1, 2006
-
Overview Of Design Methods Of Axially Loaded Piles In EuropeBy Flor De Cock
The paper reflects part of the work from the European Regional Technical Committee on Piles (ERTC3) during its mandate between 1994 and 1999, and, in particular, describes the findings from an Intern
Jan 1, 2002
-
Instrumented Load Tests On Closed-And Open-Ended PilesBy Junhwan Lee
Pipe piles can be either closed- or open-ended piles. Pile load capacity for a closed-ended pile consists of the shaft and base resistances, while, for an open-ended pile, it consists of shaft, soil p
Jan 1, 2003
-
Ground Support And Its ToolboxBy G. Sauer
"More Skill is needed to avoid rather than to handle heavy ground loads." This finding, from a tunneling engineer of the nineteenth century, is still relevant today with all advanced sequential excava
Jan 1, 2003