Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
A Preliminary Evaluations of a Through-The-Earth (TTE) Communications System at An Underground Coal Mine in Eastern Kentucky
By C. J. Weiss
"A commercially available Through-the-Earth (TTE) communications system was evaluated at an underground coal mine in eastern Kentucky. This field study was conducted as part of a larger multi-site eva
Jan 1, 2015
-
Transparency, Deep Sea Mining, and Good Governance
By Jeff Ardron
Unlike the first predicted deep-sea mining (DSM) boom 35 years, the public response to the re-emergent possibility of DSM is this time round is not entirely optimistic, with serious economic, social,
Sep 1, 2014
-
TBM Excavability: Prediction and Machine–Rock Interaction
By Z. T. Bieniawski, José Miguel Galera, Benjamín Celada
TBM case histories from over 400 tunnel sections are analyzed presenting a comprehensive application of the Rock Mass Excavability (RME) index (Bieniawski et al.2006). The paper introduces two new adj
Jan 1, 2007
-
Laboratory Evaluation Of Shield Dust Entrainment In High Velocity Airstreams (913d8715-0740-44d1-b301-b965be654afd)
In conjunction with steady increases in production levels, longwall operators have applied greater quantities of ventilating air and spray water in an effort to control respirable dust and/or methane.
Jan 1, 2001
-
Analysis Of Sampling And Slurry Flow Using Multi-Physics Modeling - Preprint 09-058
By D. McBride
Representative samples are required from process streams in order to accurately measure chemical and physical characteristics. This information can then be used by process operators and metallurgists
Jan 1, 2009
-
Tunnel Induced Settlement and Impact Analysis Automation and 3D Visualization - RETC2021
By Camilo Quintero, Frank Cesario, John Kinnear, Brian Boye
In this paper, an innovative approach was adopted to automatically calculate the effects of tunnel induced settlement on buildings and utilities. The approach resulted in increased output quality, con
Jun 13, 2021
-
Embrace the Unknown; How to Incorporate Uncertainty in Mine Planning
By C. Roos
"Mining companies have included quantifying uncertainty, or at least risk, as a requirement of project justification for many years. However, many times this process lags behind the traditional mine p
Jan 8, 2017
-
Michael Karmis: An Interview With the 2002 SME President
Your thoughts on the current status of the global minerals industries? The global economic, technological, social and political changes of the last two decades of the 20th century resulted in the e
Jan 1, 2002
-
Direct And Indirect Determination Of Shear Strength Of Rock Mass
By B. Ladanyi
An adequate knowledge of the overall behavior of a rock mass at a given site is fundamental to the satisfactory design of a rock slope. The be- havior is controlled by a variety of factors, in- cludi
Jan 1, 1980
-
James R. Arnold: An Interview With the 2007 SME President
How did you get into mining; were you from a mining town or mining family? Not at all. I grew up in northwest Kansas. I liked to hunt and fish, so I thought it would be fun to work for a company
Jan 1, 2007
-
Evaluation of devices to enhance miner self-escape in smoke-filled entries - SME Transactions 2011
By C. J. Slaughter, S. P. Harteis, L. L. Chasko, D. W. Alexander
The Department of Health and Human Services (HHS), National Institute for Occupational Safety and Health (NIOSH), Office of Mine Safety and Health Research (OMSHR), with the assistance of cooperating
Jan 1, 2011
-
Full Scale Coal Preparation Research On High Sulfur Iowa Coal
By Richard A. Grieve
A 63.5 metric tons per hour (70 TPH) demonstration coal preparation plant was constructed on the Iowa State University campus, Ames, Iowa, as a part of the Iowa Coal Project funded by the state of Io
Jan 1, 1978
-
Phosphorus Removal By Dispersed Air Oxidation (332720b9-266e-400e-993e-e74e27b94cac)
By John Hanna
Recently. researchers at The University of Alabama have developed a two-step method for the treatment of phosphorus sludge that includes bulk removal of phosphorus by physical separation techniques fo
Jan 1, 1992
-
Why The Resource Curse Is A Concern
By Graham A. Davis
?The ideas of economists and political philosophers, both when they are right and when they are wrong, are more powerful than is commonly understood. Indeed, the world is ruled by little else. Practic
Jan 1, 2008
-
Effect of Media Density to Slurry Density Ratio on Fine Grinding
By B. Hines
Grinding efficiency in a vertical stirred mill is affected by a wide range of process and mill configuration variables. Of these, the media fill, size, and intrinsic density have a significant effect
Feb 23, 2014
-
Acclimatization: Adapting Conventional Tunnel Lining Techniques to Overstress Rock Conditions - RETC2023
By Ross Goodman, Jean-Luc des Rivières
The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges which, continuing to develop over time, hampered excavation completion and impacted the cast-in-place final lining
Jun 13, 2023
-
The Niblack CU-AU-ZN-AG Volcanogenic Massive Sulfide Deposit, Alaska
By B. McNulty
The Niblack polymetallic volcanogenic massive sulfide deposits are located on Prince of Wales Island in southeast Alaska, approximately 50 km southwest of Ketchikan. The property hosts a number of pol
Jan 1, 2012
-
A case study exploring field-level risk assessments as a leading safety indicator - SME Transactions 2018
By R. Heiser, J. Vendetti, B. P. Connor, E. J. Haas
Health and safety indicators help mine sites predict the likelihood of an event, advance initiatives to control risks, and track progress. Although useful to encourage individuals within the mining co
Jan 1, 2018
-
A case study exploring field-level risk assessments as a leading safety indicator - SME Transactions 2017
By R. Heiser, J. Vendetti, B. P. Connor, E. J. Haas
Health and safety indicators help mine sites predict the likelihood of an event, advance initiatives to control risks, and track progress. Although useful to encourage individuals within the mining co
Jan 1, 2017
-
Value Engineering for the Shoreline Consolidation Sewer: An Example of Collaboration Between Owner, Engineer, and Contractor - NAT2024
By Colin Irwin, Adrian Naranjo-Castillo, Christopher Petta, Eric Zarobila
The Shoreline Consolidation Sewer is a CSO control project in Cleveland, Ohio that requires the installation of 5,000 feet of 72-inch inside diameter pipe using microtunneling methods. After award, th
Jun 23, 2024