Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design And Construction Of The Noranda Converter At The Borne SmelterBy Michel Boisvert
Noranda Metallurgy is presently completing construction of the new Noranda Converter (NCV) at its Home Smelter in Rouyn-Noranda. This capital investment of CDN$56M is the continuation of the Emissions
Jan 1, 1998
-
Microstructure Prediction in Thermo-mechanical Processing by Multi-Scale SimulationBy Qiang Yu
This paper reports on a research project supported by NSF, which aims at developing a multi-scale methodology for systematic microstructure prediction in thermo-mechanical processing of metals. This m
Jan 1, 2003
-
The Leaching Behavior of Platinum Powder In Iodide Solutions With OxygenBy Xinghui Meng
The leaching behavior of platinum powder in .iodide solutions under oxygen pressure in an autoclave was investigated. Ammonium salts were added to the leaching solution at neutral pH as a key lixivian
Jan 1, 1996
-
Preparation of SCR Catalyst Carrier by APCVD and Sol-Gel TechnologiesBy Mei Yang, Wei Gao, Jian Yang, Qingcai Liu, Wenchang Xi
"TiO2 has been loaded on cordierite porous ceramic to prepare the SCR catalyst carrier by using both APCVD and sol-gel technology. In APCVD method, TiC14 and O 2 were used as reaction precursor. TiC14
Jan 1, 2011
-
Zero Liquid Discharge Industrial Wastewater Treatment: Case Studies From 1976 To 1996By J. Bostjancic
As wastewater discharge regulations become more stringent, power plants, manufacturing plants and other industrial sites are looking for ways to reduce makeup water requirements and to recycle and reu
Jan 1, 1996
-
The Consteel Process for Continuous Feeding-Preheating-Melting and Refining Steel in the Electric FurnaceBy John A. Vallomy
"The CONSTEEL Process introduces a new concept in electric steelmaking by continuously feeding-preheating-melting and refining ferrous scrap or direct reduced iron. The process uses the furnace off-ga
Jan 1, 1988
-
Processing and Properties of cast and Extruded Zinc-Aluminum Alloy Matrix - SiC CompositesBy M. M. Kim
Zn-27% Al was pressure infiltrated into a column of 20 micron diameter abrasive grade SiC particles to give billets with particle loading of 50 voli.une %. Some billets were heated to a temperature wh
Jan 1, 1990
-
Study On Enhanced Reduction Of Liquid Lead Slag With Coal ParticlesBy Jing Zhan, Tian-zu Yang, Wei-feng Li, Li-Hua Jiang, Shi-yan Xu, Jian-yang Huang, Chuan-fu Zhang, Yan-qing Fan
The amount and activity of coal, reduction temperature and other parameters of the process of bottom-blown reduction of liquid high lead slag were investigated in laboratory. Methods to strengthen the
Jan 1, 2015
-
Post Combustion and Ore Reduction in Iron Bath SmeltingBy Ken-ichiro Uemura
"The DIOS process has been developed for eight years since 1988. The research project was started with the element studies carried out by each of the five integrated steel making companies in Japan, t
Jan 1, 1996
-
Microstructural Control and Magnetic Properties of Nd-Fe-B Permanent MagnetsBy Toshiro Kuji, Masakazu Fujita, Tetsuji Saito
"The magnetic properties of the magnetic materials were deeply dependent on the microstructures. In this study, the novel technique to produce the desired microstructures in a controlled manner was pr
Jan 1, 1998
-
Dimensioning, Scale-up and Operating Considerations for Six Electrode Electric Furnaces Part I: Current and Heat Flow in the SlagBy R. Hurman Eric
The electrode in a slag-resistance electric furnace is the central factor in the design and operation of the furnace by its role of conveying the smelting power, i.e. heat needed for the operation. Th
Jan 1, 1995
-
New Developments In The Processing Of The Non Ferrous Metal Fraction Of Car ScrapBy W. L. Dalmijn
The processing of scrap and scrap cars starts with size reduction by a hammermill, or shredder. After the liberation the magnetic fraction is removed. The remaining non¬magnetic fraction mixed with ot
Jan 1, 1995
-
Cyanide Heap Biological DetoxificationBy Patrick Clark
As part of the Mine Waste Technology Program (MWTP), a large-scale column test using bacteria and a sulfide ore was conducted at McClelland Laboratories, Inc., in Sparks, Nevada. Four technology prov
Jan 1, 1998
-
Trends in Refractory TechnologyBy J. E. Allen
The trend in refractory technology for the copper and nickel industries has been to higher quality raw materials and improved processing technology. These changes have been dictated by the changes in
Jan 1, 1994
-
Soil Remediation Via Environmentally Processed Asphalt? (EPA) ?By Stephen M. Testa
Several methodologies are available for the remediation of contaminated soils including bioremediation, vapor extraction, chemical fixation, incineration and direct disposal. A proven innovative and c
Jan 1, 1994
-
Understanding of Hazardous Waste Incineration Through CFD SimulationRotary kiln incinerators are widely used in the incineration of various types of hazardous wastes. However, the complex transport processes within the incinerator are not well understood. Due to large
Jan 1, 2002
-
Hydrometallurgical Detoxification and Metal Recovery from Fly AshBy G. Gao
Flyash from municipal solid waste (MSW) incinerators is frequently classified as a characteristic hazardous waste due to its lead and cadmium content. Extensive investigation has therefore been carrie
Jan 1, 1991
-
Integrated Nickel Production in Outokumpu OyBy P. Koskinen
Outokumpu Oy has 30 years' experience in nickel production. It is mainly based on the technology developed within the company. The production chain starts from the mines reaching to the high-grad
Jan 1, 1988
-
In-Situ Analysis of the Effect of Other Oxides for the Reduction Process of Wustite by Carbon in TEMBy Nobuhiro Ishikawa
The in-situ observation of the effect of impurities on the reduction process of iron oxides by C in TEM was carried out. A few wt% of CaO or AbO, was used as impurities in FeO was prepared. Some preci
Jan 1, 2008
-
New Developments for the Copper Isasmelt ProcessMount Isa Mines Limited (MIM) and the Commonwealth Scientific and Industrial Research Organization (CSIRO) have, over the past 15 years, jointly developed the Isasmelt process. This process is based o
Jan 1, 1993