Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    ROES® – Automated Rock Extraction

    By I Gipps

    A vision of what the future mine involves all aspects of mining, ie orebody access, ore stoping, material transport, processing and waste material disposal. This paper examines one aspect of the futur

    Nov 22, 2011

  • AUSIMM
    Optimisation of Ok Tedi's Medium-Term Production Schedules Using the Life of Business Optimisation System (LOBOS)

    By D Horacek, I K. Sheppard

    Ok Tedi is in a period of transition. By 2008 mill feed will consist of higher levels of high-grade but metallurgically challenging skarn ores. Additionally, the Taranaki pit will start production in

    Jan 1, 2007

  • AUSIMM
    From errors to uncertainty – a clarification for proper use by the Theory of Sampling

    By F F. Pitard

    Observation from attending many conferences around the world reveals that many people are constantly shifting from the word ‘error’ to the word ‘uncertainty’ without a clear vision of what the subtle

    May 9, 2017

  • AUSIMM
    Yilgarn Star ù Just in Time Methodology ù Planning and Scheduling Implications

    By G Haywood

    This paper presents the evolution of the planning, scheduling and mining practices at the Yilgarn Star underground. The paper will concentrate on the principals of æjust in timeÆ and the impact of suc

    Jan 1, 2002

  • AUSIMM
    The Challenge of Waterproofing Cross Passages in Segmentally Lined Tunnel Boring Machine Tunnels

    By E P. O’Dwyer

    Segment and gasket lining in tunnel boring machine (TBM) tunnels; and sheet membrane lining systems in driven tunnels are robust waterproofing systems each with a proven history of performance in Aust

    Sep 17, 2014

  • AUSIMM
    Be Open to Closure - It Can Save You Money

    By J Heyes

    Historically mining engineers haven't spent enough time planning waste dumps, but waste movement costs often outweigh ore haulage costs. There is a real incentive to plan waste dumps right the fi

    Jan 1, 2009

  • AUSIMM
    KEYNOTE: Back to the Future – Still on the Dark Side

    By P D. Munro

    "This is a reprise of the paper ‘Back to the Future – Why Change Doesn’t Necessarily Mean Progress’ presented to the Tenth Mill Operators’ Conference in 2009. It was observed that the ‘boom and

    Oct 10, 2016

  • AUSIMM
    The influence of roadway configurations on VCD and bulkhead design

    By M Salu

    Ventilation control devices (VCD’s) and bulkheads are critical controls used for managing risk in underground coalmines. Following the Moura No. 2 mine explosion in 1994, the Queensland Mines Departme

    Oct 12, 2022

  • AUSIMM
    Improvement of the copper flash smelting furnace (FSF) and the slag cleaning furnace (SCF) process by advice-based control of silica and coke addition

    By A Specht, A Müller, V Montenegro, S Winkler, E Klaffenbach, A Schmidt

    In the process of primary copper smelting in flash smelting furnace (FSF), the ratio of iron to silica (Fe/SiO2 mass ratio) primarily determines the slag viscosity and magnetite formation. Viscous sla

    Aug 21, 2024

  • AUSIMM
    Utilising mine planning to deliver closure landforms through productive movement

    By M Bettison, R Wright, N Taylor

    The primary mine planning focus during early study phases of future mining projects is Life of Asset ore production and grade quality, this will always be the situation. While waste schedule optimisat

    Jul 25, 2018

  • AUSIMM
    Design and operation of large drum scrubbers

    By G S. Beros, K M. Edwards

    Over the past 20 years drum scrubbers have become a widely adopted technology within iron ore beneficiation plants. Generally, the drum scrubbers in use are considered high-capacity machines capable o

    Sep 18, 2023

  • AUSIMM
    Minimising the Total Cost of Horizontal Development with Burn Cut Blast Rounds

    The total cost of horizontal development can be minimised by optimising the cost of each of the component operations (eg drilling, blasting, etc). Component costs should not be minimised. To optimise

    Jan 1, 1998

  • AUSIMM
    Neutralisation and Partial Sulfate Removal of Acid Leachate in a Heavy Minerals Processing Plant With Limestone and Lime

    By B, G Strobos, J P. Maree, N Smit

    In mining and processing operations where minerals, high in pyrite and low in calcite/dolomite are processed, acid is generated, which needs to be neutralised. Ticor at Empangeni in South Africa (SA)

    Jan 1, 2003

  • AUSIMM
    How Leadership Can Create an Enduring Safety Culture

    By J Ross

    The foundation of effective leadership is communication. You can have all the leadership theories, models and training you want, but in the end it is all about leaders talking to, listening to and und

    Mar 21, 2011

  • AUSIMM
    Unlocking value chain optimisation with a digital mining system

    By S Gulati, N Sarkar, T Vink, S Battersby, L Okada

    This paper examines a successful project implemented by BHP Mitsubishi Alliance (BMA) and the Polymathian team at Deswik, aimed at enhancing short-term scheduling processes to reduce vessel turn times

    Sep 1, 2024

  • AUSIMM
    Developing the Foundation Communication Infrastructure to Support Remote and Automated Mining Initiatives in Underground Mines

    By D Kent, R Paine

    "Automated mining systems are increasingly being seen as a key requirement for a productive mining operation in the future. The importance of an integrated communication network infrastructure to supp

    Mar 24, 2014

  • AUSIMM
    Predictive Site-Wide Water Quality Modelling as a Tool for Mine Planning and Permitting - A Recent Canadian Example

    By A Fitzpatrick

    An integrated and dynamic water balance and water quality model for a proposed base metal mine has been created using the GoldSimÖ software package. The model was initially developed to address the wa

    Jul 10, 2012

  • AUSIMM
    Application of Simulation Technology to the Design of Coal Clearance Systems

    Longwall mining operations have been in place in Australia since the early 1960s. This mining method is currently used to extract the bulk of coal obtained from underground mines in Australia (CSIRO,

    Sep 26, 2011

  • AUSIMM
    The Benefits of Using SmartEar™at Pueblo Viejo

    By D Shuen, R Sales, D La Rosa

    Semi-autogenous grinding (SAG) mill control is complex and depends on many dynamic process variables. Good control strategies ensure that a mill is operating as close to optimal as possible, resulting

    Sep 1, 2014

  • AUSIMM
    Underground Space and Urban Planning in Australia - Are They Compatible?

    This paper discusses the potential role of underground space and tunnelling in urban planning in Australia. The paper gives examples of the infrastructure and commercial applications of underground sp

    Jan 1, 1999