Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    National Instrument 43-101, Form 43-101F1 - Technical Report

    "The technical report form provides the headings to be used and content required when a completing a technical report to be filed in accordance with NI 43-101. The technical report is meant to be a su

    Jan 1, 2003

  • CIM
    Planning Radiological Risk Mitigation For Remediation Of Abandoned Uranium Mines

    By David Sanscartier, Elizaveta Petelina, Alexey Klyashtorin

    This paper provides an overview of the radiological risk mitigation approach applied by the Saskatchewan Research Council (SRC) for the remediation of 35 legacy uranium mine sites in northern Saskatch

    Jan 1, 2020

  • CIM
    Briquetting of Ulexite Fines

    By G. Ozbayoglu, Z. Ozdemir

    Turkey is the main boron minerals producing country in the world. The most important boron minerals are tincal, colemanite and ulexite. All mining, beneficiation and handling operations generate fines

    Jan 1, 2004

  • CIM
    The Rio Tinto's P155 Smelters Now Operating At 210 KA

    By V. Gaudreault

    Rio Tinto Alcan (RTA) has three smelters that use the Alcoa P155 technology: two in Canada (Grande-Baie and Laterrière, Saguenay, QC) and one in the United States (Sebree, Kentucky). The oldest RTA P1

    Jan 1, 2011

  • CIM
    Bent Ray Passive Tomographic Imaging of Seismic Velocity and Seismic Velocity Gradient in Zabrze Bielszowice Coal Mine for Seismic Hazard Assessment.

    By J. Dubinski

    Passive tomographic imaging is a technique that can be used for assessing seismic hazard in mines with high seismic activity induced by mining. The basic idea behind such an interpretation is the assu

    Aug 1, 2013

  • CIM
    Control of Explosive Zones in Longwall Gobs Through Nitrogen Injection

    By R. C. Gilmore

    Underground longwall coal mining sections may develop explosive mixtures of methane-air in the mined-out gobs. If the panel are operated as bleederless or sealed gobs, progressive sealing along the ga

    Aug 1, 2013

  • CIM
    Experimental and Numerical Modelling of Thermal Stimulation in Geothermal Core Studies

    By M. C. Villeneuve, P. A. Siratovich

    We present an integrated analysis of laboratory-based thermally induced fracturing and results of numerical models to give insight to the role of thermal shock fracture on geothermal reservoir rocks.

    Jan 1, 2015

  • CIM
    Design Methodology for Large Underground Powerplants

    By R. Plassart, F. Laigle

    "As a powerhouse, a transformer or a valve chamber, large underground caverns are a major element of hydropower plant. On the contrary to galleries and shafts which are linear and long underground str

    Jan 1, 2015

  • CIM
    LKAB Autogenous Milling of Magnetite (8df1bb35-2d50-4598-b2a6-0d38054b7892)

    By N. Aydogan, H. Dundar, Å. Partapuoli, A. Fredriksson, P. Wikström, K. Tano, G. Adolfsson

    The Autogenous milling of ores holds an increasing attraction as the focus moves towards reducing energy usage, both direct and embodied in grinding media. However, most of the early AG mills were con

    Jan 1, 2012

  • CIM
    Kinetics of the CESL Gold Process

    By E. Asselin, P. Sauve, H. Salomon-de-Friedberg

    "Residues from the CESL Copper process were leached using the CESL Gold process. The kinetics of reaction were confirmed to be fast with over 50% of the gold consistently extracted within 2 minutes of

    Jan 1, 2012

  • CIM
    The Dry Concentration of Ores and Minerals

    By R. A. Kipp

    THE dry concentration of ores and minerals is a subject on which there is very little engineering literature available. With the advent of flotation, practically all milling research was turned to thi

    Jan 1, 1961

  • CIM
    Effect of Sulphates on Aggregation of Alumina and Pyrite

    By M. Mirnezami, J. A. Finch, M. S. Hashemi A.

    This study examined the effects of pH and sulphate concentration on the surface charge and stability of alumina and pyrite dispersions. The relationship between these properties was investigated using

    Jan 1, 2004

  • CIM
    Notes on East Coulee Coal Area, Alberta

    By Gordon L. Kidd

    The object of this paper is to show the relations of the East Coulee coal area to the near-by Willow Creek, Wayne, Rosedale, and Drumheller areas, all being parts of the Drumheller field. The word ?ar

    Jan 1, 1929

  • CIM
    Study on Acoustic Wave Propagation in Fractured Rock Mass under High In-Situ Stress of Model Test and Damage Constitutive Relation (da00ca07-9cc1-45ad-9211-b9f1f4c94af2)

    By Hang Zhao, Xinping Li, Pingan Wu, Yi Luo

    The deep-buried rock surrounding the Jinping II Hydro-power Station was taken as the engineering background. Using model specimens of classified rock materials to simulate fractured rock mass under hi

    Jan 1, 2015

  • CIM
    Ettringite formation in lime-remediated mine tailings: I. Thermodynamic modeling

    By F. P. Hassani, J. F. Boily, A. M. O. Mohamed, M. Hossein

    The optimal geochemical parameters required to form ellringite in a lime-remediated site have been investigated with the use of thermodynamic modelling. The speciation of sulphate and 10 metals analyz

    Jan 1, 1995

  • CIM
    In-Situ Resource Utilization

    By Larson. William

    What is Lunar In-Situ Resource Utilization (ISRU)? ISRU involves any hardware or operation that harnesses and utilizes ?in-situ? resources to create products and services for robotic and human expl

    May 1, 2009

  • CIM
    Luis Felipe Medina Aguirre

    This document presents estimates of future "total cash cost per ounce" and "minesite cost per tonne" that are not recognized measures under United States generally accepted accounting principles ("US

    May 1, 2011

  • CIM
    Creating Sustainability at Antamina

    By Steven D. Botts

    The Antamina project, owned by BHP Billiton Plc, Mitsubishi Corporation, Noranda Inc., and Teck Cominco Ltd. , is a $2.3 billion copper/zinc project, located in the Ancash Department in Perú. The proj

    May 1, 2002

  • CIM
    Removal of Arsenic from Gold Processing Circuits by Use of Novel Magnetic Nanoparticles

    By C. Feng, D. W. M. Arrigan

    Arsenic is often associated with gold mining operations and poses a significant health and environmental hazard. While a number of technologies are available for removing arsenic, none of them is effe

    Jan 1, 2017

  • CIM
    Andacollo Hypogene Project

    By Tim Watson

    Andacollo Hypogene Project ?Overview Project description: Sulphide copper concentrator Throughput:55,000 tpd Location: Approximately 50 km from La Serena Elevation: Approximately 1,000 m ASL St

    May 1, 2010