Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Design of a Passive Underwater Pressure Gauge

    By S. Lim, G. Walsh, V. Romero

    The cable television show, Mythbusters, contacted the New Mexico Institute of Mining and Technology requesting a pressure gauge to be used in underwater testing. The requirements for the gauge were: i

    Jan 1, 2009

  • ISEE
    Blasting Access Holes in Thick Sea-Ice, Mcmurdo Sound, Antarctica

    By Martin Reed, John Wright

    Blasters with the United States Antarctic Program (USAP) have developed techniques for opening access holes in floating sea-ice where the use of conventional drilling equipment is impractical. The bla

    Jan 1, 2001

  • ISEE
    Journal: Vibration and Seismograph Section / Use of GPS and GPS Exchange Format Files in Pennsylvania

    By Rick Lamkie

    When investigating citizen complaints about blast vibration and airblast, it is important to be able to establish the spatial relationships between blasts, blasting seismographs monitoring the events,

    Jan 1, 2008

  • ISEE
    Improvement on the Fragmentation Results for Effect of the Reflective Planning Generated by the Pre-Split.

    By Jorge Cárdenas Miranda, Hector Espinoza

    Currently in open pit mining in Peru with double bench, it is a challenge to optimize fragmentation in the drill rows near to the slopes to ensure the performance in the loading and haulage operation

    Feb 6, 2023

  • ISEE
    Implementation of a Remote Blasting Engineering Center in Peru

    By Jorge Cárdenas, Luis Huaroc, Máximo Cari, Nestor Delgado

    In Peru, after four years of pandemic, some mining companies have chosen to install integrated operating centers in central offices where through network technology and video surveillance it allows th

    Jan 21, 2025

  • ISEE
    Removing Booster Influences from Toxic Fumes

    By Michael S. Wieland

    "This report investigates whether it is tractable and thereupon reasonable to remove the boosterinfluences when ranking the toxic fumes of non-cap-sensitive mining explosives. The hazard potential is

    Jan 1, 1999

  • ISEE
    Attenuation of Blasting Vibrations in South Florida, Part II

    By Greg Mclellan, Mark Johnson, John Pepper

    In this paper, the measured vibrations are plotted in terms of the individual PPV components versus Scaled Distance (SD) on logarithmic scales. The maximum PPV is pIotted on a separate graph and equat

    Jan 1, 2001

  • ISEE
    Journal:Security Matters / Procedures to Follow When Explosives Are Missing From Inventory (e.g., Disposition Unrecorded/Unknown)

    Prepare ATF Report of Theft or Loss (ATF Form 5400.5). A Report of Theft or Loss - Explosives Materials must be prepared when it is discovered that explosive materials are missing from inventory. Subm

    Jan 1, 2008

  • ISEE
    Blast- Induced Structural and Crack Response of a Brick Residential Structure Near an Aggregate Quarry

    By Charles Dowding, Cathrine Aimone-Martin

    This article summarizes an investigation of the structural response of a brick façade home in New Mexico. The subject Ricter residence was located some 1100 to 1400 ft away from an aggregate quarry, a

    Jan 1, 2005

  • ISEE
    The Fundamentals of a Good Electronic Initiation System Program

    By Thomas Barkley

    Until the recent past, blasters have provided good to excellent results with tools and processes that have an inherent error. These errors can be found in drilling, explosives delivery quality and con

    Jan 1, 2011

  • ISEE
    New controlled drilling and blasting methodology to preserve the central shaft in a copper mining unit in central Perú.

    By Samir Garcia, Alain Mestanza

    This technical work was carried out in an open pit copper mining unit, located in central Peru, which has a daily production of 440 thousand tons per day. Currently the pit consists of three mining ph

    Jan 21, 2025

  • ISEE
    A Blasting Efficiency Descriptor "Bed" (for surface blasting)

    By Evan Jannoulakis, Wilfrid Comeau

    Using the Scaled Distance (SD) and the vector sum Peak Particle Velocity (PPVvs) from a single delay, preferably single blasthole, in a shot, a number is derived which has shown itself to be consisten

    Jan 1, 1998

  • ISEE
    The Thermal Basis for Explosive Decomposition with Heat due to External heating or reactive ground

    By Alastair Torrance, Gary Cavanough

    Over the past two years a research project has been performed on reactive and hot ground. A key finding is that host materials including carbonates and coal are inhibitors to the reaction of sulphide

    Jan 21, 2025

  • ISEE
    Mine-to-Plant Optimization Through Ultra High-Energy Explosives and Blending Strategies in Extremely Hard Rock Conditions

    By Luis Huaroc, Jorge Cardenas, José Salvador

    One of the current challenges in mining is managing increasingly competent rock conditions within the mine-to-plant value chain, particularly when working with marginal ore grades. This study presents

    Jan 26, 2026

  • ISEE
    Physics Based 3D Rock Blast Movement Modelling

    By THOMAS BAMFORD, Dale S. Preece, Amir Behbahanian, Mick Lownds

    An important aspect of blasting is rock movement and final muck configuration. Computer modeling of this process has been done in 2D for many years, revealing insights into the blasting process and en

    Jan 26, 2026

  • ISEE
    Analysis of Sympathetic Detonation in Detonating Cord

    By Josh Calnan, Paul M. Holmgren, Abigail N. Styer

    Detonating cord is a staple of the explosives industry, used widely in the civil and defense industries. Detonating cord is a thin, flexible plastic tube filled with pentaerythritol tetranitrate (PETN

    Feb 1, 2020

  • ISEE
    Challenges and Lessons Learned from the Kentucky Lock Project

    By K. Best, D. Conn

    The US Army Corps of Engineers KY Lock Project in western Kentucky presented the blasters and vibration consultants with a set of unique challenges. The blasters on this project were faced with diffic

    Jan 1, 2024

  • ISEE
    Drone Technology Utilization to Increase Safety and Support Analysis for Blasting Process

    By Ery Wardhana, Stefanus Jagad, Relinda Sanistya, Hasucita Tausi, Rido Situmorang

    The blasting process is one of the most high-risk activities in mining operations. Shotfirers and blasting crews face hazards from slope failure, toxic gas and fumes, or unstable ground condition ever

    Feb 6, 2023

  • ISEE
    Moving 50’(15.3m) of Burden with a 4½” (115mm) Hole

    By Keith Henderson

    An open pit quarry operation in West Central Illinois provided a challenging proposition regarding the removal of a rock wall that once separated two pits, but was now in the middle of the north wall

    Jan 1, 2012

  • ISEE
    The Specifications said No Blasting

    By Timothy Fogarty, Gregory Poole, Roger Reeder, David Switz

    This project involved the construction of a new pump station and intake structure at an existing water treatment facility. Although the project involved a significant amount of rock removal, the speci

    Jan 1, 2012