Search Documents

  • AUSIMM
    The Sulphide Ore Treatment Plant at Mount Morgan

    The ore, as sent to the sulphide mill, is a mixture, in varying proportions, of oxidized ore from above the 450-ft. level and sulphide ore from above and below (to date mainly from above) that level.

    Jan 1, 1939

  • TMS
    Size-Dependent Melting Characteristics of Lead-free Solder Alloys in Microelectronics

    By NRMR Bhargava

    With the increasing use of lead-free solder alloys, low melting point alloy is often required due to the heat- sensitive parts or substrates in modern electronic devices. For such demand of low meltin

    Jan 1, 2009

  • NIOSH
    RI 4102 Badu Feldspar Deposit, Llano Co. TX

    By George W. Huseman, W. D. Mcmillan

    "INTRODUCTION Feldspars represent one of the most abundant groups of minerals and constitute nearly Go percent of the material contained in the igneous rocks. They are grouped in a series of related a

    Jul 1, 1947

  • AUSIMM
    The New Office and Changehouse Building at the Zinc Corporation Limited, Broken Hill, N.S.W.

    The object of this paper is to give a description of the new office and changehouse building and equipment at the Zinc Corporation Limited, the office section of which has now been in full use for app

    Jan 1, 1941

  • DFI
    Suction Piles And Suction Anchors For Offshore Structures

    By S. Bang

    In recent years, suction piles and suction anchors have been used as underwater foundations for various offshore structures. They have been proven very versatile, effective, and environmentally frien

    Jan 1, 2009

  • AUSIMM
    Coal-Based Filter Aids for Industrial Applications

    A simple process for making filter aids from coal by controlled carbonization at 800-1200·C is described.Several possible variations in reactor design have been used experimentally, involving flu

    Jan 1, 1970

  • SAIMM
    South African Coal Pillar Database

    By J. N. Van der Merwe

    The research described in the paper was aimed at providing standardized information of cases of failed and intact coal pillars in the form of databases to researchers. It also offered the opportunity

    Jan 1, 2006

  • NIOSH
    RI 7657 - Effect Of A Surface Borehole On Longwall Gob Degasification (Pocahontas No. 3 Coalbed)

    By M. G. Zabetakis, T. D. Moore

    The use of a partially slotted 6.5-inch-inside-diameter vertical pipe to remove methane from a longwall gob area at a depth of 2,260 feet in the Pocahontas No. 3 coalbed ms investigated. The value of

    Jan 1, 1972

  • AUSIMM
    Electrolytic Refining and Smelting at Port Kembla, New South Wales

    SOME notes on the works of the Electrolytic Refining and Smelting Company of Australia will no doubt be of interest to members of the Institute, more especially as much of the work is new to Australas

    Jan 1, 1910

  • SME
    Lyon–Turin Long and Deep Railway Tunnel Project

    By P. Fauvel, V. Nasri

    In January 2001, French and Italian governments signed an agreement for the construction of a new Lyon-Turin railway line. This project includes a tunnel of 53.1 km length and a maximum of 2500 m over

    Jan 1, 2005

  • SME
    Seismic Design Evaluation of the Bay Tunnel

    By Yiming Sun

    The 5-mile long Bay Tunnel is a major water supply facility to be constructed under the San Francisco Bay and adjacent marshlands between the San Andreas Fault to the west and the Hayward Fault to the

    Jan 1, 2008

  • SME
    Mining Applications Of Small Disc Cutters

    By J. E. Friant

    Until 1956, drill and blast was the only way to excavate rock. In that year, a tunneling machine using disc type cutters economically bored a small Toronto tunnel. Its amazing 105 ft/day set a new w

    Jan 1, 2002

  • CIM
    Optimization of the paste backfill plant at Louvicourt mine

    By J. Cayouette

    In 1995, Louvicourt mine started one of the first paste backfill operations in Canada. From 500 000 t in 1995, the annual paste backfill tonnage produced reached 800 000 t in 1999. The maximum through

    Jan 1, 2003

  • CIM
    Applying a Customer-Based Approach at Vale’s Clarabelle Mill

    By A. Taylor, J. Shelegey, H. Sullivan, J. Doucet

    "Historically, performance at Vale’s Clarabelle Mill was measured by Mill throughput and Mill recovery. After the economic collapse in 2008, a series of reviews were performed to drive improvements in

    Jan 1, 2012

  • SME
    Satisfying information requirements on mineral extraction by applying Earth Observation methods: First results from EO-MINERS

    By W. E. Falck, A. Usubiaga, J. Spangenberg, P. Schepelmann, S. Šolar, D. Wittmer, F. Blanchard

    The extraction and processing of mineral resources may be accompanied by environmental impacts. In spite of technological advancements, the enormous increase in production volumes within the last deca

    Jan 1, 2011

  • NIOSH
    RI 9068 - Damping Properties of Selected Steels and Cast Irons

    By A. Visnapuu

    Excessive noise and high vibration are inherently associated with equipment used in the mining, extraction, and processing of mineral resources. High vibration degrades structural components, often le

    Jan 1, 1987

  • AUSIMM
    Mineralization in the Cobar-Nymagee Province and Its Significance

    Contents.SummaryIntroductionSituation, climate, topographyHistorySize of depositsPrevious investigationsGeological History of AreaMap compilationHistorical summaryNature and Significance of Granitic R

    Jan 1, 1950

  • SAIMM
    Slag Carry-Over and the Production of Clean Steel

    "For effective steel refining in the ladle (secondary steelmaking) the amount of steelmaking slag that is transferred from primary steelmaking must be limited, because the steelmaking slag contains ir

    Jun 1, 2019

  • SME-ICGCM
    Successful Application of Rock Bolt Support and Mechanised Depillaring in Difficult Roof Conditions at Tandsi Mine, Western Coalfields, India

    By D. C. Oldroyd

    Western Coalfield?s Tandsi Mine, has difficult support conditions and a history of roof falls, resulting in mining roadway widths and depths being restricted for safety reasons. Rock Mechanics Technol

    Jan 1, 2006

  • DFI
    Micropiles At The Transformation Ago Project

    By Jim Bruce

    The Transformation AGO project, constructed between 2005 and 2008, featured a foundation trade contract that included design of pile caps and grade beams and construction of 138 permanent micropiles.

    Jan 1, 2011