Coarse Liberation and Recovery of Free Gold and Gold Sulfide Carriers for Energy Reduction in Process PlantsBy M Davies, G Theletsane, A H. Gray
Recovery of gold from gold ores has been driven by the available technology and its configuration in the process plant flow sheet.Conventional practice in test work programs has the ore being ground f
Sep 1, 2014
-
The evolution of production blasts at Ernest Henry MineBy C te Kloot, Z Liu
Blast performance and the resulting drawpoint condition and volume of oversize has the potential to impact operator safety and mine productivity. Underground measurements showed that approximately 14
Oct 16, 2017
-
From Face to Surface – a Fragmentation StudyBy A Gustafson, D Johansson, K Jonsson
The underground mining process, from in situ characteristics of the unmined rock mass to the final mill product with fully liberated minerals, consists of a chain of unit operations. Some of them infl
May 9, 2016
-
Work-Life Balance and Atypical Working Hours: Does FIFO Pass the Epicurean Test for Happiness?When I was first asked to give a paper on work-life balance in the mining industry I was both excited and aware of the incongruity of my position. I have never worked in mining operations nor have I h
Jan 1, 2005
-
A Managed Approach to Project InsuranceHistorically the insurance industryÆs involvement in any project has been relatively late in the process. Often it was a case of the last item to be ticked off the checklist has been to ensure that th
Jan 1, 2007
-
Optimising the recovery of stopes at Bentley Mine through rockfill stabilisation and cemented aggregate fillBy D Pateman, F de Fredrick
The Bentley underground mine, which is located 60km north of Leonora, Western Australia, is owned and operated by Round Oak Minerals Pty Limited. A high-grade Zn-Cu Volcanogenic Massive Sulphide (VMS)
Mar 15, 2021
-
Development of the Burra Mine MuseumThe Barra Mine was the most significant mine of Australia's earliest mining era, which took place in South Australia between 1841 and 1851, the decade prior to discovery of gold in eastern Austra
Jan 1, 1993
-
Design and Commissioning of a 40 Tonne per Day Flotation Concentrate Bio-Oxidation Treatment Plant at the Harbour Lights MineBy Carter A. J, Miller D. M, Holder N. H M, Van Aswegen P C
The Harbour Lights Mine situated at Leonora in Western Australia, mines a refractory sulphidic gold ore. The main sulphide minerals are pyrite and arsenopyrite. Due to the association of gold with the
Jan 1, 1992
-
Setting Best Practice: FIFO at the Mount Keith ConcentratorBy S O. Hille
Modern remote mining operations in Australia are more commonly trending towards fly-in/fly-out (FIFO) sites. This trend is driven by numerous factors including increased business centralisation, reduc
Jan 1, 2002
-
Sunrise Dam Short- to Long-Term Ventilation PlanningBy M Podreka, P Merry, L van den Berg
Anglo Gold AshantiÆs Sunrise Dam operation is located in Western Australia approximately 55 km south of the town of Laverton. Currently, the mine is producing from both its open pit and underground op
Jul 1, 2013
-
Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South AustraliaBy B Cook, M Karakus, J Light, E K. Chanda
The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements
Mar 24, 2014
-
Flow Loop Testing of Different Paste Mixtures at Neves Corvo Mine, PortugalBy M Byrne, P Newman, M Lindqvist
SomincorÆs Neves Corvo Mine, one of the largest copper producers in Europe, is currently constructing a paste backfill plant in order to replace cemented rockfill in its bench and fill stopes and poss
Jan 1, 1998
-
A 3D Discrete Event Simulation Model of a Truck-shovel Network SystemBy W Zeng, D Walker, D Cai, E Baafi
"The efficiency of the truck-shovel haulage system is significantly influenced by the truck fleet size. A discrete event simulation model with 3D animation has been developed to estimate the productiv
Nov 15, 2016
-
Mineral liberation studies of IMPTEC super-fine crusher – 130 crushed productBy J Addai-Mensah, W Skinner, C Kelsey, J R. Kelly, E Baawuah
Comminution continues to be the most capital-intensive unit operation in mineral processing. The fundamental purpose of comminution is to liberate the valuable minerals so that they can be economicall
Aug 29, 2018
-
Ventilation Surveys and Model Building - A ConsultantÆs OpinionBy J Rowland
"This paper was primarily put together in order to demonstrate what are believed to be acceptablestandards, in relation to ventilation surveys and the subsequent model assembly process. Thiswas brough
Jun 1, 2012
-
Stope Performance in Challenging Ground Conditions: Observed Versus Predicted - A Case StudyThroughout the study phases (scoping, prefeasibility and feasibility) of new mining projects one is forced to work with and make predictions based upon limited date obtained from diamond and reverse c
Nov 25, 2010
-
High shear rotor trials in the Mount Isa Mines Copper ConcentratorBy H Law, M Muller
Mount Isa Mines (MIM) Copper Concentrator currently utilises Agitair 120 banks for its roughing flotation circuit. Apart from a rotor change, the only other significant work completed to the Agitair b
Aug 29, 2018
-
Stratigraphy of the Marra Mamba Iron Formation within the Chichester Range and its Implications for Iron Ore Genesis at Roy Hill - Evidence from Deep Diamond Drill Holes within the East Fortescue ValleyBy P Hawke, J Hurst, B KrapeP
Hancock Prospecting Pty Ltd (HPPL) drilled two deep diamond stratigraphic holes (ECD0001 and RHD0296) within the eastern Fortescue Valley in the Pilbara of Western Australia. Located south of the Roy
Aug 12, 2013
-
Resource Estimation for the Aurukun Bauxite DepositBy C Grobler, M Recklies, G Jiang, I Taylor, M Morgan, G MacDonald, L Smith
The resource estimation of lateritic deposits, such as Aurukun, presents specific issues related to the lateral changes in thickness and elevation of the various horizontal layers (or zones) within th
Jan 1, 2009
-
Implementation of an Advanced Milling and Flotation Control System at Mopani Mufulira Copper MineBy B E. De Gee, N Viviers, A Naidoo
In 2013 the Mopani Copper Mine Mufulira plant in Zambia embarked on a project that was aimed at improving concentrator recoveries. The project commenced with the automation of the milling and flotatio
Sep 1, 2014