Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Performance of Vertical Flow Systems for Passive Treatment of Acid Mine Drainage

    Vertical flow systems (SAPS, vertical flow wetlands) are increasingly used for passive treatment of mine drainage that is net acid. Data on 30 systems in eastern US show that well designed systems typ

    Jan 1, 2003

  • AUSIMM
    Maximising asset value through optimal block by block decisions on marginal material

    By F Phillips, E Deucker, J Kato

    It is challenging to determine the optimal mining strategy to maximise value when a mine plan includes mineralised material which does not meet the full cost of mining but has value exceeding the vari

    Mar 15, 2021

  • AUSIMM
    A Regional Regolith-Landform Framework for Mineral Exploration Models in the Broken Hill Region

    By Eggleton R. A, Taylor G

    As the search for major orebodies continues, the regolith dominated areas of the Broken Hill region remain one of the major exploration frontiers. The past exploration philosophies emphasising bedr

    Jan 1, 1997

  • AUSIMM
    Separation of Pyrite and Arsenopyrite in a Gold Sulfide Concentrate

    By D E. G Connelly, K Y. Wong

    Gold at the Harbour Lights Mine (HLM), WA occurs principally in pyrite (Py) and arsenopyrite (AsPy) minerals rendering it inaccessible to direct cyanidation. Froth flotation produces a concentrate wit

    Jan 1, 2005

  • AUSIMM
    Structural Controls in the Tarnagulla Goldfield, Central Victoria: Implications for Metamorphically Derived Auriferous Fluids (7e54b8c0-a935-48c5-857a-f805178a4625)

    By Ramsay WRH, Morand V

    Structural, mineralogical, and textural data from the Tarnagulla Goldfield demonstrate that the area has undergone three significant phases of deformation. The first phase of deformation (Dl) predate

    Jan 1, 1995

  • AUSIMM
    Material handling testing and control system requirements for dry stack tailings

    By R Stefansen, T Wisdom, A Nicholson, K Rahal

    The challenges of increasingly scarce water resources and the risk of dam failures has seen the mining industry turn to sustainable tailings management solutions such as dewatering and dry stacking. F

    Jul 23, 2018

  • AUSIMM
    Development and Application of a Piezoelectric Sensor for Turbulence Measurement in Industrial Flotation Cells

    By P Holtham, J Meng, E Tabosa, W Xie

    Turbulence and its distribution are of great importance in flotation, and have received considerable attention recently. However, there is no mature technique to measure turbulence in three-phase (liq

    Sep 1, 2014

  • AUSIMM
    Design, Development and Operation of a Hardrock Roadheader

    By Bromley JC

    Eimco Great Britain, a division of Baker Mining Equipment Company, was contracted to develop a hardrock tunnelling machine in conjunction with British Coal. The objective: a machine to cut rock up

    Jan 1, 1987

  • AUSIMM
    Mine geology standardisation – providing the foundation to consistent short-term geometallurgical product predictions in a complex multimine and supply chain environment

    By B L. Sommerville

    "The theme of this International Mining Geology Conference is ‘Setting New Standards’. Rio Tinto’s iron ore operations include a complex integrated supply system to deliver ore from 15 mine operations

    Sep 20, 2017

  • AUSIMM
    Studies on the Effect of Burden on Blast Damage and the Inplementation of New Blasting Practices to Improve Productivity at KCGMÆs Fimiston Mine

    By G E. Smith, G N. Lye

    Wall control blasting practices are necessary to reduce the impact of blasting on mine faces but can also have a significant negative impact on mine productivity and operating costs. The conventional

    Jan 1, 2001

  • AUSIMM
    Selective Ion Flotation of Gold from Alkaline Cyanide Solutions

    By Leahy G. J, Moxon N. T, Nicol S. K

    Experimental work is described in which extremely dilute aurocyanide liquors are treated with novel surface-active complexing agents to produce a hydrophobic aurocyanide species. Subsequent aeration

    Jan 1, 1991

  • AUSIMM
    Comparison of Field Estimated Strengths

    By A Duran

    When dealing with rocks in the geotechnical profession, a common activity involves providing an estimate of the intact strength. The tactile approach and descriptions of strength that apply to soils i

    Nov 5, 2014

  • AUSIMM
    A new cut-off grade method to maximise resource utilisation of underground metalliferous mining operations

    By M Nehring, M Kizil, P Knights, A Mousavi, F Sotoudeh

    A cut-off grade is used to distinguish an economically viable block of ore from non-economical ones in mining operations. In order to obtain a high Net Present Value (NPV), a strategic and precise det

    Nov 10, 2020

  • AUSIMM
    Production of Fertilisers and Smelter-Grade Alumina by Alkali Leaching of Christmas Island 'B' and 'C' Phosphate Ores

    Crandallite and millisite in Christmas Island 'B' and 'C' phosphate ores are rapidly decomposed by sodium hydroxide solutions at about 80QC. As these phosphates generally contain

    Jan 1, 1971

  • AUSIMM
    Evaluation of Low Profile Electric Loader in Conjunction with Electric Monorail Haulage System in Narrow Vein Mining

    By B Besa, E K. Chanda

    It has long been recognised that narrow vein mining needs innovative approaches to mine access and mining methods in order to improve the economics of this vital part of the mining industry. The minin

    Mar 26, 2012

  • AUSIMM
    A Guide to Selecting the Optimal Method of Resource Estimation for Multivariate Iron Ore Deposits

    By H Arvidson, J Vann

    When only wide-spaced drilling is available, for example at concept, prefeasibility and feasibility stages, properly implemented linear estimation (including ordinary kriging) predicts grade tonnage r

    Jan 1, 2007

  • AUSIMM
    Reply to Contributed Discussion (this issue) by John Shepher and L. Keith Rixon

    By ALAN J. HARGRAVES

    It is normal that Shepherd and Rixon, in their contributed discussion (this issue) see differences with Hargraves (1983), as it exemplifies the present uncertain situation worldwide, a situation expec

    Jan 1, 1983

  • AUSIMM
    Acid Rock Drainage Prediction and Waste Rock Segregation Plan for Ankerite-Containing Mine Waste ù Restigouche Mine Case Study

    By R Carreau

    The results of a detailed acid rock drainage (ARD) prediction program were used to revise the waste rock segregation criteria at the Restigouche open pit mine. Waste rock at the site was predominately

    Jan 1, 2003

  • AUSIMM
    Evaluation of Underground Mining Options at Xstrata Copper's Ernest Henry Copper-Gold Mine

    By P Christen, D R. Ashley, G R. Power

    The Ernest Henry Mine is currently a copper-gold open pit operation situated in north-west Queensland, Australia. It is owned and operated by Xstrata Copper with a current throughput of 11 million ton

    Jan 1, 2009

  • AUSIMM
    Mining Network and the Security Question

    By A Huebner, A Noack

    Companies all over the world are very sensitive concerning their IT and network security. In most network connected technical installations and machines however, network security is not taken into acc

    Sep 26, 2011