Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Sampling Systems for Process Control and Metallurgical Accounting

    By F F. Pitard

    The optimisation of a metallurgical plant requires two kinds of sampling systems. The first provides samples to follow process changes, so in due time actions to maintain key parameters within pre-est

    Jul 29, 2014

  • AUSIMM
    Development of a Segmental Lining Specification for Steel Fibre Reinforced Concrete Flexural Strength Testing Using Round Panel Tests

    By S Kost, R Nievergelt, F Cortes

    In recent years, the use of steel fibre-reinforced concrete (SFRC) for segmental tunnel linings has become increasingly popular due to numerous advantages including durability, resistance to spalling,

    Sep 17, 2014

  • AUSIMM
    Application of Block Caving System in the Tongkuangyu Copper Mine

    By Song Yongxue

    During the design and operation stages of a block caving project, a large amount of research and development work has been undertaken in the Tongkuangyu Copper Mine. This paper presents the research a

    Jan 1, 2000

  • AUSIMM
    Innovation at the Hellyer Concentrator

    By G D RICHMOND, Campbell J. J

    Aberfoyle Limited has developed the Hellyer complex base metal sulphide deposit located in North West Tasmania. As part of exploration and feasibility study, the ore was extensively tested, includin

    Jan 1, 1992

  • AUSIMM
    Developments at MHD 'Berzelius' Duisburg

    By Tack K

    During its 28-year life the MHD ISP smelter has gone through two phases, each of about a dozen years. The first phase was a learning one; in the second phase the lessons were applied and throughput

    Jan 1, 1993

  • AUSIMM
    Selective Separation of Hematite from Quartz by Flotation using a Temperature Responsive Polymer

    By E Forbes, G V. Franks

    "This study investigates the dual function of a temperature responsive anionic co-polymer of poly (N-isopropyl acrylamide) (PNIPAM) as a selective flocculant/flotation collector. PNIPAM is used for se

    Aug 12, 2013

  • AUSIMM
    The Wonawinta Silver Project – Value Engineering at Work

    By P G. Greenhill

    The Wonawinta silver project near Cobar in NSW is under development by Cobar Consolidated Resources Limited (CCR). RMDSTEM Limited is part of the owner’s team for feasibility, design, engineering, con

    Aug 8, 2011

  • AUSIMM
    The Century Discovery, Queensland, Australia - Is Exploration Ever Complete? (c0b4033c-7bcc-4cd7-babd-7aa89f5e67ef)

    The Century zinc-lead-silver deposit has a geological resource of 118 million tonnes averaging 10.2% zinc, 1.5% lead and 36 g/t silver. It lies approximately 250 km NNW of Mt Isa in NW Queensland, Au

    Jan 1, 1995

  • AUSIMM
    The Perseverance Gold Copper Deposit – A New Peak Mines Challenge

    By B Taylor

    The Perseverance deposit is the most southerly known economic copper/gold deposit within the Cobar gold field. The deposit is situated approximately 12 km to the south-southeast of Cobar and is essent

    Aug 22, 2011

  • AUSIMM
    Effect of Vibration Sensor Mounting Method on the Quality of Vibration Measurements

    By R Castedo, P Segarra, I del Castillo, L M. López, J A. Sanchidrián

    This work investigates some suggested methods for blast vibration monitoring on a hard surface based on 53 tests on a vibration exciter. Errors in the measurement attributable to coupling have been de

    Aug 24, 2015

  • AUSIMM
    The Technical Analysis of Lead Blast Furnace Slag, as Practised at the Port Pirie Works of The Broken Hill Associated Smelters Pty. Ltd.

    THE slag from the blast furnaces having been granulated, a representative sample is taken to the sample mill. It is then dried, crushed through a 100-mesh screen, intimately mixed, and packeted for as

    Jan 1, 1922

  • AUSIMM
    A Review of Processing at the Cannington Ag/Pb/Zn Mine

    By G Clarke

    Commissioning of the Cannington processing plant began in October 1997. The nameplate capacity (of 1.55 million tonnes of ore per annum) was achieved relatively quickly. Since then (like many mines) t

    Jan 1, 2007

  • AUSIMM
    Management Strategies for Mineral Education in the 1990's

    Education for the Mineral Industry in Australia developed in an uncoordinated but effective fashion till the mid 1960's, with recognised quality in graduates, with output matching demand, and

    Jan 1, 1984

  • AUSIMM
    Potential for Revegetating Base-Metal Tailings at the Tui Mine Site, Te Aroha, New Zeland

    By Gregg PEH, Horne D, Bolan N, Stewart RB

    The Tui mine site is situated on the NW flank of Mt. Te Aroha, at approximately 400 m altitude. During underground mining operations two lead-copper-zinc ore bodies were exploited and processed on si

    Jan 1, 1995

  • AUSIMM
    Evaluation of Cyclical Voltammetry as an Electrolyte Screening Technique

    By Grady B. V O, Cavell K. J, Ault A. R, Newman O. M G, Malcolm J. McPhersqn

    Cyclic voltammetry (CV) has been evaluated as a technique for monitoring the quality of an industrial zinc sulphate electrolyte. The basis of the method involves measuring a change in the polarisati

    Jan 1, 1993

  • AUSIMM
    Maintaining and Improving Grade Control at New Celebration Gold Mine

    New Celebration Gold Mine is located 35 km SE of Kalgoorlie, Western Australia, in the Archaean Kalgoorlie-St Ives Greenstone belt. The leases total 119 sq kms and arepart of a joint venture between

    Jan 1, 1991

  • AUSIMM
    Pairing Magnetic and E-field through-the-Earth Communication Systems Based on Mine Site Conditions

    By S J. Schafrik, E S. Gilliland, E C. Jong, J Waynert, C W. Weiss

    Two commercially available through-the-Earth (TTE) communications systems were evaluated at an active underground longwall mine in West Virginia. One system utilises magnetic field (H-field) antennae

    Nov 4, 2015

  • AUSIMM
    Prediction of Roof Collapse for Rectangular Underground Openings

    By A M. Suchowerska, J P. Carter, J P. Hambleton

    "In order to effectively predict the roof collapse of underground openings using continuum models, it is imperative that a realistic failure criterion is used to represent the rock mass. However, for

    Nov 5, 2014

  • AUSIMM
    Understanding Mine Site Water and Salt Dynamics to Support Integrated Water Quality and Quantity Management

    By S D. Golding, K Baublys, V Nanjappa, C J. Moran

    Water reuse is becoming an integral component of the water management strategy on mine sites. This practise is being driven by corporate sustainability goals, community and societal pressures to demon

    Jan 1, 2009

  • AUSIMM
    Substrate Nutrients and Ph Variations During Rehabilitation of the Wangaloa Coal Mine Site, South Otago

    By D Craw, C Smith, C Martin

    The Wangaloa coal mine closed in 1989, and an attempt to grow Pinus radiata on quartz-rich overburden dumps was not successful. The site is currently being rehabilitated with re-profiling and native p

    Jan 1, 2004