Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Influence of Geology on Blasting Hazards and Results

    By T N. Little

    The aim of any rock breaking activity is to achieve success by developing designs that are blasting objective-specific and geology-specific, and then implementing such designs. This paper targets mini

    Aug 22, 2011

  • AUSIMM
    Preliminary Design for the Rockwater Power Project, South Island, New Zealand

    By H Asche

    The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak

    Mar 8, 2011

  • AUSIMM
    Dilution optimisation in sublevel open stoping operations

    By A Vakili

    Dilution is associated with considerable direct and indirect costs in underground open stoping operations. As shown in previous works, an improved ability to predict dilution enables the economic risk

    Mar 29, 2023

  • AUSIMM
    Life-of-Mine Ventilation System Upgrade at Springvale Colliery - A Case Study

    By B Smith, R Gelson

    Springvale Colliery is an underground longwall mine situated approximately 10 km north-west of Lithgow in the western coalfields of New South Wales. Following a full-scale review of the mineÆs ventila

    Jul 1, 2013

  • AUSIMM
    How the Global Experience and Reach of Tunnelling’s True Multinationals Helped Solve a Road Tunnel Fit-out Challenge

    By S Strong, L I. Sanz Vivanco, T Brown

    One of the most significant technical and practical challenges facing the tunnel construction team on the Legacy Way road tunnel project in Brisbane, Australia was how to erect the prestressed precast

    Sep 17, 2014

  • AUSIMM
    Strategic thinking about long-term ‘above ground’ orebody complexity using scenarios

    By T Craske, J Sykes, T C. McCuaig, M Jessell, A Trench

    The prevalent strategic approach in the mining industry is one of planning. However, it is widely recognised that planning does not work in complex and uncertain situations (Mintzberg, 1994), such as

    Nov 21, 2018

  • AUSIMM
    A preliminary benchmarking numerical modelling exercise for tailings‐flow runout analysis

    By S Liu, N M. Rana, A Take, N Ghahramani, D Clohan, S McDougall, S G. Evans, H J. Chen

    Tailings dam breaches have caused significant life loss, social, economic and environmental damage in recent years. The term "tailings-flow" refers to various forms of tailings outflow movement result

    Jul 1, 2021

  • AUSIMM
    Getting it right from the beginning – ESG in mineral exploration

    By L H. G McClean

    Environmental, social and governance (ESG) factors have always been important to the minerals industry and is now considered one of our most important opportunities (and risks). Getting it right from

    Sep 1, 2024

  • AUSIMM
    Implementation Strategies for Energy Effectiveness and Sustainability – Example of Anglo American Platinum

    By O Bascur, A Soudek

    Large metallurgical complexes are substantial users of energy, water and assets. To improve the effectiveness of energy and assets the quality of the data and events become paramount for real-time ope

    Sep 1, 2014

  • AUSIMM
    Transformation of Iron Oxide By-Products During the Becher Process (dc24a04d-bdb5-4804-9a16-35fc2c57fc49)

    By Gibbons S. L, Ritchie I. M, Murr D. M

    Fundamental studies on the transformations of iron oxides have been carried out and related to the solution conditions in the Becher process. The results show that a number of iron oxide interconversi

    Jan 1, 1990

  • AUSIMM
    Bit to Bag - The Importance of a Total Coordinated System in Reverse Circulation Drilling

    By M Goers, M Almond

    "The use of reverse circulation (RC) drilling for grade control sample collection was selected by the Pueblo Viejo Mine Geology department at the recommencement of the operation in 2010. This method w

    Aug 21, 2012

  • AUSIMM
    Development and Implementation of the CaveCAD Ground Support Module for Cost and Safety Improvements in Block Cave Mines

    By S Talu, E Savage, P Sturm, A van As

    It is estimated that substandard ground support installations and elements cost the Rio Tinto Copper Group millions of dollars between 2000 and 2014. These issues have also created significant safety

    May 9, 2016

  • AUSIMM
    Cemented Hydraulic Fill Mix Design As it Applies To Mine Scheduling

    The need to schedule ore production to make maximum use of the strength gained by cem- ented fill during curing is discussed, to show how cement content and hence fill cost can be kept down for any

    Jan 1, 1973

  • AUSIMM
    Nordberg MP1000 A 1000HP Cone Crusher

    Nordberg has conducted extensive research, during 1982-85, on the effects of cone crusher variables such as speed, throw and cavity design on the productivity of the crushers. Simultaneously, Nordbe

    Jan 1, 1988

  • AUSIMM
    Coal Combustion Technology-Status and Future Developments

    The use of coal as a fuel for heat and power generation has a long history. During the nineteenth century most of the present combus- tion technologies were pioneered, as shown in Table 1, This per

    Jan 1, 1987

  • AUSIMM
    A Multidisciplinary Approach to the Optimisation and Control of a Copper-zinc Grinding and Flotation Circuit

    By D Hatton, S Wilson, F Orrante, M Taghimohammadi, F van der Walt, N Arslan, M Westcott

    "Cayeli Bakir Isletmeleri is an underground copper-zinc mine in turkey. The ore is highly variable with feed grades ranging from 1–4 per cent copper and 1–10 per cent zinc. Due to this variability, or

    Oct 10, 2016

  • AUSIMM
    Incorporating Sustainability into Mining Plant and Infrastructure Design

    By A Murphy

    Mining plants and infrastructure, and the decisions made by their designers, can have large impacts on their environmental and social context, commonly referred to as the site or plant footprint. They

    Jul 16, 2014

  • AUSIMM
    Environmental Variables at Bauxite Mine

    By A Romanel, M S. Kato, M P. Piermatei, P Artioli

    "Brazil is the sixth worldwide producer of aluminum and Votorantim (Metals) has been operating three bauxite open pit mines in a particular way of working. In those the deposits occur on the top of hi

    Jul 10, 2012

  • AUSIMM
    Characterising the Spontaneous Combustion Propensity of Waste Rock

    By J Theiler, B Beamish

    The presence of reactive metal sulfide minerals in waste rock contributes to the hazard of spontaneous combustion in dumps, as these minerals react with air and water entering the dump at ambient temp

    Jun 28, 2016

  • AUSIMM
    Recovery of Zinc from Smelter Off-Gases Using a Fluidised Bed Condenser

    By F R. A Jorgensen, G W. Jensen

    A pilot scale experimental investigation of the condensation of zinc vapour from smelter off-gases was performed in conjunction with a mathematical modelling study of the system. The work investigated

    Jan 1, 2000