Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Copper Concentrator Practice at Mount Isa Mines Limited, Mount Isa, Qld

    By Hare S. M, Griffin P. T, O&apos

    Chalcopyrite ore and converter slag treatment to produce copper concentrates is undertaken at the Copper Concentrator of Mount Isa Mines Limited. This concentrator was commissioned in May 1973, replac

    Jan 1, 1993

  • AUSIMM
    The Mount Bonnie Gold Silver Project

    By Eupene GS, Cheong GE

    Operations at the Mount Bonnie gold/silver project are described. The project is based on the gossan of a stratiform and stratabound polymetallic sulphide deposit. The gossan contains approx- imat

    Jan 1, 1984

  • AUSIMM
    New Shotcreting for Ground Support of TBM Tunnelling

    By Takeuchi T, Matsugaki K

    We have developed a new shotcreting which is suitable for the primary support of TBM tun- nelling in soft rock. This spraying compound is made from cement, a special accelerating agent and glass fib

    Jan 1, 1987

  • AUSIMM
    The Broken Hill Proprietary Company Limited. (Iron and Steel Works.) The Basic Open Hearth Process

    By Walker E. R

    IN the early age of steel it was made hy what is known as the cementation proeess, in which wrought iron was embedded in charcoal and heated in a mufflc furnace to a tcmperature of approximately 1100&

    Jan 1, 1930

  • AUSIMM
    Cut and Cover Tunnelling on the Melbourne Underground Rail Loop Project

    By Johns A. L

    The concept of the Melbourne Underground Rail Loop and the organ- isation to achieve its construction are covered in the companion papers (Reference 1, 2) and will not be repeated here. The Victor

    Jan 1, 1981

  • AUSIMM
    Newly Developed Method and Equipment for Tunnel Excavation-Construction of Myojin Tunnel

    By Fukuichi K, Matsukawa H, Nakagawa M

    The Myojin Tunnel, located on the Shikoku Expressway being constructed by the Japan Highway Public Corporation, is 3,770 m long with a cross sectional area of 80 m2. Kajima Corporation, the contrac

    Jan 1, 1987

  • AUSIMM
    The Physical Structure of Cast Iron and Its Relation to Cupola Practice

    IT is very difficult for a founder engaged in jobbing work, comprising all sizes and classes of castings, to appreciate that the analysis of the iron he is using cannot entirely fill the situation he

    Jan 1, 1926

  • AUSIMM
    Rainfall Patterns Rather than Climate Classification Control Cover Design for Closure

    By T Baumgartl, B Richards

    Covers on waste rock and tailings remain the primary choice for closure planning where the purpose is to create an environment where water ingress into reactive material can be controlled and/or preve

    Jun 28, 2016

  • AUSIMM
    Resources and Reserves at Z.C. Mines Broken Hill

    By Hulton SJ, MacKenzie DH

    The Broken Hill orebody within the leases of ZC Mines is still a major lead-silver-zinc resource after over 80 years of mining. It illustrates particular problems encountered in resource and reserve

    Jan 1, 1987

  • AUSIMM
    Some Consideration on Tunnel Excavation Methods in Mudstone Strata

    By Yagi Y

    The double track railway tunnel, called the Second Shirasaka Tunnel is being constructed under the supervision of Japanese PTational Rail- ways (JNR) in the tertiary soft rock strata in order to spe

    Jan 1, 1987

  • AUSIMM
    Precipitation of Mercury from Process Liquors with Aluminium

    By Bratt G. C, Horsham T. R, Langlois D. R

    Mercury is precipitated from weakly acidic sulphuric acid plant waste liquor at the Risdon Works of the Electrolytic Zinc Company of Australasia Limited. Factors determining the choice of process a

    Jan 1, 1977

  • AUSIMM
    Production and Metallurgical Characters of Hollow Mining Drill Steel in Australia

    INDEX OF CONTENTS.1. Historical.2. Manufacture.3. Heat Treatment.4. Fatigue, Failures.5. Consideration of the Establishment o£ a Central Testing or Proving Station.HISTORICAL.Since the introducti

    Jan 1, 1947

  • AUSIMM
    Mining Operations at Que River

    The Que River Mine is a small under-ground base and precious metals mine located in north-western Tasmania. Current production rate is 220,000 tonne/yr from reserves grading 0.37% copper, 7.1% lead, 1

    Jan 1, 1985

  • AUSIMM
    Direct Reduction of PbS with C and CaO Thermodynamics and Kinetics

    By Lee H. G, El-Rahaiby S. K

    The literature relating to reduction of sulphides by carbon using lime as sulphur-absorbent is reviewed. A stage-wise thermodynamic model is employed to evaluate the practical feasibility of the direc

    Jan 1, 1991

  • AUSIMM
    Advances in Rotating Magnetic Field Separation Since 1997

    Since the announcement of early experimental work on rotating magnetic field (RMF) separation at the Sixth Mill OperatorsÆ Conference in 1997, the concept of RMF separation has been developed and test

    Jan 1, 2000

  • AUSIMM
    Evaluation of Iron Ore Fines From the Viewpoint of Their Metallurgical Properties in the Sintering Process

    By N Nosaka

    Sinter plants currently have to use many types of ores with different properties due to the great demand for iron ores, which was driven by the massive growth in Chinese iron and steel industry. On th

    Jan 1, 2005

  • AUSIMM
    Slot Stopping At Bold Head Mine, King Island Scheelite

    By Snowden C. T

    B Lens Main is a scheelite orebody with an average dip of approximately 15¦ and thickness ranging from 1.5 to 6.0 m. The orebody is overlain by a banded section of ore and waste which tends to slab

    Jan 1, 1977

  • AUSIMM
    Development of the Primary Ventilation System at Mount Isa: I. Mining Considerations

    During the last 12 years the dominant theme at Mount Isa has been production expansion. Production rate of 3,200 tons per mine day in 1953 increased to 11,000 tons per mine day in 1960, completing the

    Jan 1, 1967

  • AUSIMM
    Mining Practice at Cleveland Tin N.L. Tasmania

    A mechanised sub-level overhead benching method is used at Cleveland, to produce 22,000 tons per month of ore assaying 0.92% Sn and 0.40% Cu. The ore occurs in a series of vertical lenses which can b

    Jan 1, 1970

  • AUSIMM
    Towards the Elimination of Conventional Surface Slurried Tailings Storage Facilities

    By D J. Williams

    The approach to the disposal and storage of mine tailings is slowly evolving. Tailings disposal has been based on minimising short-term capital and operating costs, with rehabilitation costs discounte

    Jul 27, 2015