Climate change risks to mine closure – planning for a range of impactsBy N McIntyre, R Trancoso, N Bulovic
Mining is essential for facilitating human development particularly as demand for critical minerals grows. However, over the mine life cycle, the environment is permanently changed. Once mining ceases
Aug 2, 2023
-
Towards a model-informed process control strategy for coal flotation in a Jameson CellBy A J. Morrison, M Yahyaei, J S. Siong, J Wang, K Runge
The flotation cells used to upgrade ultrafine metallurgical coal (-250 µm) are usually poorly controlled leading to unnecessary loss of combustibles from the flotation system. This is mainly because c
Aug 24, 2022
-
The Role of Stress Waves and Fracture Mechanics in FragmentationThis paper will review some of the work conducted in the past at the Dynamic Effects Laboratory to examine the use of stress waves and fracture mechanics in understanding dynamic fracture and fragment
Aug 24, 2015
-
Open Strip Pitwall Instability at Goonyella Mine-Causes and EffectsBy Richards BG, Komdeur W
Instability in spoil piles and in high wall slopes in natural overburden has been ex- perienced at Utah's Goonyella Mine since com- mencement of operations in early 1971. Annual production target
Jan 1, 1978
-
Control System Improvement Through Alarm ReductionBy R West
The Olympic Dam smelter facility processes copper concentrate feed using direct-to-blister smelting technology to support the current site production rate of 225 000 t/a copper. The metallurgical cont
Jan 1, 2005
-
Integration and Optimisation of Blasting and Comminution ProcessesBy D La Rosa, A Jankovi, A Dance, W Valery
This paper presents the methodology for optimising blasting and comminution processes in terms of fragmentation developed by Metso Minerals Process Technology Asia-Pacific and South America (MMPT). Th
Jan 1, 2007
-
A Simple Method of Calculating Grouted Rock BoltsBy Yu-Jun Z
According to site measurement and labora- tory experiment, the authors suggest a new mathematical model of grouted rock bolts. The rock bolt is taken as an elastic bar, and the grout is substituted
Jan 1, 1987
-
A Review of BHP - Utah Coal Limited's Dragline Stripping OperationsBHP-Utah Coal Limited operates 33 draglines of varying sizes in the Bowen Basin of Central Queensland. The group's operations with draglines commenced in 1963 with the establishment of opencut
Jan 1, 1989
-
Loading of Au(CN)2 - Solution Onto Activated CarbonBy Linge HG, Klauber C
The key element in the carbon-in-pulp process for gold processing is the loading of dissolved Au(CN)2 from solution onto activated carbon. The mechanism and kinetics of this step have been examined
Jan 1, 1989
-
Zinc Mining in Permafrost at PolarisCominco Ltd's Polaris Mine in Canada's High Arctic has been successfully mining zinc ore in permafrost since 1981. Mining methods using frozen backfill have been the key to success. The mi
Jan 1, 1993
-
Exploring two approaches for real-time measurement of frother concentrationBy H Park, D J. Holland, L Wang, Y Matviychuk, Y Lee
Reuse of process water in mineral and coal flotation plants is widespread to effectively reduce freshwater consumption. However, the accumulation of the frother in the recycled process water is a grow
Aug 24, 2022
-
High-resolution erosion modelling using the RUSLE – an application to open cut coalmine operationsBy C M. Côte, P Bolz, R Chrystal
The design of final landforms is an integral part of mine closure plans in Queensland and aims to ensure the rehabilitated land is safe, stable and non-polluting. Landform stability in this context is
Aug 2, 2023
-
Open Stope Design at Normandy Golden Grove OperationsBy M P. Sandy, J B. Simpson
The empirical stope design techniques developed by Mathews et al (1981) and refined by Potvin (1988) and others, have gained rapid acceptance in Australia in the 1990s as a simple, æfirst-passÆ means
Jan 1, 2000
-
Evaluation of a UAV-LiDAR system for mapping geological structures in an open pit highwallBy B Banerjee, H Masoumi, X Shen, S Raval, D Tannant
Structural mapping of pit walls can be performed using digital images and photogrammetry software, but the performance is limited by weather and environmental conditions including dust, rain and light
Nov 30, 2018
-
The Development and Application of Health, Safety, Environment and Community Management Standards in BHP BillitonPrior to the merger of BHP and Billiton, both companies had a keenfocus on improving their performance in health, safety, environment and community (HSEC) matters. This shared intent, albeit executed
Jan 1, 2002
-
Dispute Review Boards - A Better Way To Go?The arbitration process, and its drawbacks: Any time you have taken part in a major arbitration, and the decision, when it comes out, is not what you thought it would be (which is bound to happen occa
Jan 1, 1999
-
The Mine Geologist in a Business PerspectiveThe role of the mine geologist in a business perspective is self-evident to some, but to others it may be a new concept. All mine geologists need to know exactly how they add value to the business if
Jan 1, 2000
-
Scoping of Feasibility StudiesHow often does one hear that a recent feasibility study was not a success? Alternatively, when scope of the feasibility study was sent out to tender there was a large discrepancy in tendered prices. I
Jan 1, 1998
-
Capacity Evaluation of Iron Ore Processing Facilities Utilising Dynamic SimulationsBy N Steenkamp, L Furstenberg, W Cele, M Richter
Managing productivity and improving efficiency for a healthy return on capital employed have become key mining industry strategies under prevailing tough global market conditions. However, achieving t
Jul 13, 2015
-
The perfect storm – mine closure in the Latrobe Valley VictoriaBy A Scrase, J Brereton
The Latrobe Valley is located approximately 150 kms east of Melbourne. Within a very small area there are 3 large brown coalmines and associated power stations, 3 large towns, and numerous smaller tow
Aug 2, 2023