Search Documents
Search Again
Search Again
Refine Search
Refine Search
-
A fractographic study of corrosion-fatigued specimens of A533B steel
By J. H. Bulloch
This paper describes detailed fractographic analyses of several specimens that had undergone corrosion-fatigue tests at high stress ratios in simulated pressurized water-reactor environments. The dist
Jan 1, 1987
-
Improving Fine Copper And Gold Flotation Recovery - A Plant Evaluation (d574b2f9-e2a3-41fd-b4b5-7b57e9170d2f)
With the increased variability of today's large-scale mining operations, consistent flotation performance is important to improving and sustaining overall recovery through the circuit. The Newcre
Jan 1, 2007
-
Visualising and Understanding the Stress Path for Rock Mechanics Modelling and Testing, and Rock Engineering Design
By J. P. Harrison, J. A. Hudson.
ABSTRACT: When considering the rock stress component of rock mechanics design, the basic procedure is to consider the pre-existing stress-state in the rock mass and then estimate the disturbance to th
Jan 1, 2003
-
Notices THE FEDERATION OF SOCIETIES OF PROFESSIONAL ENGINEERS (fd7aefc2-847a-4c6d-8036-efd8d5953dc0)
Notices THE FEDERATION OF SOCIETIES OF PROFESSIONAL ENGINEERS The following letter has been received from the Secretaries of the above Federation. Ref. EHvdL/MM/27 13/11/1973 TO THE SECRETARIES OF ALL
Jan 1, 1974
-
Pillar design in coal mines
By H. Wagner
The paper points out that bord-and-pillar mining is the most important method of coal extraction in South African underground coal mines, and advocates that pillar design procedures should be refined
Jan 1, 1980
-
Improved wear- and corrosion-resistant steels
By G. G. Garrett, J. A. Peters, J. V. Bee, M. W. Atkinson
The development of steels with improved abrasion-corrosion resistance for use in underground components in South African gold mines is described in terms of design, manufacture, and performance. Based
Jan 1, 1987
-
Theoretical and engineering aspects of slimes-dam construction
By G. W. Donaldson
Theoretical and engineering aspects of slimes-dam construction by G. W. DONALDSON, M.Sc. (Eng.)(U.C.T.), D.I.C. (Visitor) Tile paper reviews the recommendations made in 1959-60 as a result of research
Jan 12, 1973
-
A new method for the rapid float-sink analysis of coal fines
By M. C. Harris
Float-sink analysis has wide application in the coal laboratory. This paper evaluates the established methods used for the float-sink analysis of fine coal, and then describes a new method and apparat
Jan 1, 1986
-
Spotlight on grade control
By W. K. Brinsden
The Australian Institute of Geoscientists (AIG) held their fifth successive annual seminar at Observation City, Scarborough, in Perth on 15th November, 1990. The title of the seminar was 'Strateg
Jan 1, 1991
-
Digital computer control of the milling circuit at Buffelsfontein Gold Mining Company Limited
By J. D. Smit, K. C. Garner, P. C. van Aswegen
The initial results obtained from the implementation of computer-controlled strategy on the milling circuit are reported. An analysis of these results showed that a peak-power pebble-mill controller o
Jan 1, 1980
-
Die optimisering van die Sishengroefvervoersisteem
By deur J. V. D. M. Grimes
Sishen Iron Ore Mine is one of the largest open-pit mines in the world, and loading and hauling constitutes one of the major cost items on the mine. Because high productivity in loading and hauling re
Jan 1, 1984
-
The improvement of wear resistance by ion implantation
By R. Hutchings
The paper reviews current understanding of the effect of ion implantation on the wear process, and the state-of-the-art of ion implantation as a commercially viable treatment to impart wear resistance
Jan 1, 1986
-
A review of copper hydrometallurgy
By J. C. Paynter
A review of copper hydrometallurgy by J. C. PAYNTER, B.Sc. (Chem. Eng.) (Visitor) Copper hydrometallurgy is discussed with special reference to the treatment of chalcopyrite concentrates under South A
Jan 11, 1973
-
The presinking of Harmony No. 4 shaft by use of the MA TLA headgear
By I. M. W. Preston
A new shaft system was required to replace stope face for the North Section of Harmony Mine and to allow for systematic opening up of the North Eastern Section. Owing to the economic circumstances at
Jan 1, 1983
-
The modelling and simulation of processes for the absorption of gold by activated charcoal
By D. F. Williams
The modelling, simulation, and design of processes for the recovery of gold from solution by absorption on carbon require the combination of a suitable rate expression with a description of the flow c
Jan 1, 1985
-
Coal-preparation routes for maximum coal recovery
By T. A. Claasen
Exceptionally low yields in the coking-coal fields of the Soutpansberg area in the northern Transvaal, are taxing the skill and ingenuity of preparation engineers. The coals are highly intergrown, and
Jan 1, 1980
-
Guidelines for the derivation of reliable material balances from plant data
By L. C. Woollacott
Some of the factors that may influence the reliability of a consistent material balance derived from plant data were investigated, data taken from a sampling of the Iow-grade tin-flotation circuit at
Jan 1, 1987
-
Excess shear stress in the assessment of geologically hazardous situations
By J. A. Ryder
A high proportion of damaging rockbursts are thought to be underlain by seismic events that represent shear or rupture along planes of weakness (faults, joints, dyke contacts). Such events are control
Jan 1, 1988
-
Reduction And Sintering Of Fluxed Iron Ore Pellets - A Comprehensive Review
Iron ore pellets with or without additives are commonly used as alternate charge material in both conventional and newer ironmaking processes. The performance characteristics of these pellets are norm
Jan 1, 1996
-
O.F.S. Branch (e20f6d44-3414-45dc-9a03-c6cb75ee797b)
O.F.S. Branch Minutes of the Committee Meeting held in the Committee Room at the St. Helena Club at 4.45 p.m. on Wednesday, 3rd September, 1975. Book reviews JONES, M. J. (ed.). Minerals and the envir
Jan 12, 1975